Contract to Build on to Frank Iny School; Correspondence Regarding Teachers and Curricula

Fecha: Approx. January 1, 1931 to December 31, 1940
Conservación: National Archives and Records Administration (NARA)

Iraqi Jewish Archive (NARA) — transcription judeoiraq.org · depositado el 24 de agosto de 2026 · registro Intersección · depositario, no propietario

Descripción

Consultar en línea

Esta pieza se depositó en forma de enlace: se consulta en el sitio que la aloja.

Dirección facilitada por el donante. Este contenido no se aloja aquí y su disponibilidad no depende de nosotros.

Ilustraciones

ija-3099 — page 1 · Iraqi Jewish Archive (NARA) · judeoiraq.org
ija-3099 — page 1 · Iraqi Jewish Archive (NARA) · judeoiraq.org
ija-3099 — page 2 · Iraqi Jewish Archive (NARA) · judeoiraq.org
ija-3099 — page 2 · Iraqi Jewish Archive (NARA) · judeoiraq.org

Texto fuente

### csp_0190c05a9a1c5b099347d76b4e0983ca

| Date | Design and Supervision By | Scale | | 24.5.57 | Saleh Joseph | 1 : 100 |

up .25 3.85 .25 1.60 7.10 .25 .25 5.65 .25 3.80 .25 3.75

Front Elevation

**Traduction anglaise —**

Date | Design and Supervision By | Scale 24.5.57 | Saleh Joseph | 1 : 100 up .25 3.85 .25 1.60 7.10 .25 .25 5.65 .25 3.80 .25 3.75 Front Elevation

---

### csp_0397ffe2a08c5786a4b0f91d4f29bcb9

صحيفة ١٧

| المبلغ | السعر | الكمية والوحدة | تفاصيــــــــــــــل الاعمــــــــــــــال | الفقرة | | | | | تابع للفقرة ( ٢٩ – ج – ) | | | | | | كل انبوب في موقع مناسب. توضع كافة الانابيب داخل | | | | | | الجدران او تحت الكاشي وتغلف بالكونكريت بصورة | | | ١٧ ٠٠٠ | ٨ ٥٠٠ | ٢ عدد | جيدة . | | | | | | د – مباول فرفوري | | | | | | يجب ان تكون من اجود الانواع الموجودة في | | | ٦ ٠٠٠ | ٢ ٠٠٠ | ٣ عدد | الاسواق وان تربط المباول بانبوب قطر ٢ انج. | | | | | | هـ – كليــــــــــــــات | | | | | | تكون الكليات من الاهين بقطر ٤ انجات ويجب | | | | | | تثبيتها بالكونكريت بصورة جيدة . ويجب ايصال | | | | | | الكليات بانبوب آهين قطر ٤ انجات الى خارج | | | | | | البناء ولا يجوز استعمال كليات الاهين المصنوعة | | | ٤٥ ٠٠٠ | ٤٥ ٠٠٠ | ١ عدد | محليا . | | | | | | و – خزان للماء في السطح | | | | | | يجب ان يكون الخزان من حديد الصفيح قياس | | | | | | ٣ في ٣ في ٣ قدم مجهز بطوافة ويشمل | | | | | | السعر الصبغ بالدهن ثلاث قوط بالفرشاة | | | | | | ويكون الدهن Sealocrete Oil and Acid | | | ١٢ ٠٠٠ | ٦ ٥٠٠ | ⟦١٠⟧ | Resisting Paint من نوع | | | | | | ز – حفر وبناء مانهولات | | | | | | تكون القاعدة من الخرسانة ١ = ٣ = ٦ فوق | | | | | | طبقة من الطابوق الكسر وتبنى جدران | | | | | | المانهولات بالطابوق والسمنت سمك ٢٥ | | | | | | سم. وتكون ابعاد المانهولات من الداخل | | | | | | ٦٠ في ٦٠ في ٤٠ سم. ويجب ان تجهز | | | | | | المانهولات بغطاء من الاهين من نوع | | | | | | ( ايرتايت ) الانكليزي. كما ويجب ان تمهد | | | | | | ⟦illegible⟧ | |

[Marginalia] ٢٠٨٥ ⟦...⟧ [Marginalia] ١٦٧ ٤٢٩ [Marginalia] ٢٩٥٧ ٧٢٠

**Traduction anglaise —**

Page 17 Amount | Price | Quantity and Unit | Details of Work | Item | | | Continuation of item (29 - C -) | | | | each pipe in a suitable location. All pipes are placed inside | | | | the walls or under the tiles and encased in concrete in a | 17,000 | 8,500 | 2 count | good manner. | | | | D - Porcelain Urinals | | | | They must be of the best types available in the | 6,000 | 2,000 | 3 count | markets, and the urinals shall be connected with a 2-inch diameter pipe. | | | | E - Gullies | | | | Gullies shall be of cast iron with a 4-inch diameter and must | | | | be fixed with concrete in a good manner. The gullies must | | | | be connected with a 4-inch diameter cast iron pipe to the outside | | | | of the building, and the use of locally manufactured cast iron | 45,000 | 45,000 | 1 count | gullies is not permitted. | | | | F - Roof Water Tank | | | | The tank must be of sheet iron measuring | | | | 3 x 3 x 3 feet, equipped with a float valve, and the price | | | | includes painting with three coats of oil paint by brush, | | | | and the paint shall be Sealocrete Oil and Acid | 12,000 | 6,500 | ⟦10⟧ | Resisting Paint type. | | | | G - Digging and constructing manholes | | | | The base shall be of 1:3:6 concrete over a | | | | layer of broken bricks, and the manhole walls shall | | | | be built with bricks and cement at a thickness of 25 | | | | cm. The internal dimensions of the manholes shall be | | | | 60 x 60 x 40 cm. The manholes must be equipped | | | | with a cast iron cover of the English (Airtight) | | | | type. Also, it must be paved | | | | ⟦illegible⟧ | 2085 ⟦...⟧ 167 429 2957 720

---

### csp_0742dc32096d51e9bd50c41ae5e57594

B01 · other / latin 12.55 9.90 25.40 12.85 10.20 5.00 5.00 7.10 3.80 1.60 3.80 .25 .25 .25 .25 .25 .25 .25 .25 .25

**Traduction anglaise —**

12.55 9.90 25.40 12.85 10.20 5.00 5.00 7.10 3.80 1.60 3.80 .25 .25 .25 .25 .25 .25 .25 .25 .25

---

### csp_09822fe2d3525c8ab6f0057c6e3da4dc

FRANK INY SCHOOL Intermediate & Primary New Alwiyah - Baghdad TELEPHONE No. 91693

مدرسة فرنك عيني متوسطة وابتدائية علوية الجديدة - بغداد تلفون : ٩١٦٩٣

No.: Date: الرقم: ف / ٦٠ / ٥٧ التاريخ: ١٠ / ٢ / ١٩٥٧

رئاسة اللجنة الادارية للطائفة الاسرائيلية ببغداد الموضوع : تسديد حساب البناء الجديد في المدرسة

بعد التحية بالاشارة الى كتاب السيد صالح يوسف المهندس المؤرخ ٧ / ٢ / ١٩٥٧ المعنون الى لجنتكم المحترمة ونسخة منه إلينا ، يرجى إحاطتكم علماً بما يأتي :

١- لم يتم لحد الآن بناء سقف بيت الحباب الذي كان قد خربه عمال المقاول حين اشتغالهم بالبناء الجديد مع العلم ان ذلك يسبب تلويث حباب ماء الشرب بالاتربة ومياه الامطار على الدوام . ٢- لم يتم لحد الآن تغيير أقفال الابواب الخمسة كما هو مشروط في المقاولة حسب ما ذكره السيد صالح يوسف . ٣- لا زالت هناك بعض الصبغات في شبابيك البناء التي لم تتم بعد . ٤- من الضروري اكمال صبغ الجدران نهائياً من الخارج والداخل واصلاح بعض البقع في الجدران الداخلية بعد اكمال الصبغات في شبابيك الغرف . ٥- من الضروري تبديل أحد الابواب نظراً لكونه أصغر من فتحة الباب بحوالى نصف قدم . ٦- وهناك قسم من السطح الذي فوق دورة المياه مباشرة قد بقي بدون تهوير وبدون منفذ لتصريف الماء عنه مما يضر بجدران الغرفة الجديدة .

هذا وان هذه النواقص وإن لم تكلف نفقات كبيرة لاكمالها إلا أنها تمنعنا من استعمال الغرف الجديدة التي نحن بامس الحاجة إليها في الوقت الحاضر . لذا يرجى الطلب الى المقاول باكمالها قبل تسديد ما بقي له من ديون باسرع وقت ممكن . وتفضلوا بقبول فائق الاحترام

[Signature] عبد الله عبيد [Signature] المدير

صورة منه : الى السيد صالح يوسف المهندس - للعلم

**Traduction anglaise —**

FRANK INY SCHOOL Intermediate & Primary New Alwiyah - Baghdad TELEPHONE No. 91693 Frank Iny School Intermediate and Primary New Alwiyah - Baghdad Telephone: 91693 No.: Date: No.: F / 60 / 57 Date: 10 / 2 / 1957 Presidency of the Administrative Committee of the Jewish Community in Baghdad Subject: Settlement of the new building account at the school Greetings, With reference to the letter from Mr. Saleh Yousef, the engineer, dated 7 / 2 / 1957, addressed to your respected committee and a copy to us, please be informed of the following: 1- The roof of the water jar room (Al-Habbab), which was damaged by the contractor's workers during their work on the new building, has not yet been completed, noting that this causes the drinking water jars to be constantly contaminated with dust and rainwater. 2- The locks of the five doors have not yet been changed as stipulated in the contract according to what was mentioned by Mr. Saleh Yousef. 3- There are still some paintings on the building's windows that have not been completed yet. 4- It is necessary to complete the painting of the walls permanently from the outside and inside and to repair some spots on the internal walls after completing the painting on the windows of the rooms. 5- It is necessary to replace one of the doors as it is smaller than the door opening by about half a foot. 6- There is a section of the roof directly above the toilet that remains without leveling and without an outlet for water drainage, which harms the walls of the new room. Furthermore, although these deficiencies do not cost much to complete, they prevent us from using the new rooms that we are in dire need of at the present time. Therefore, please request the contractor to complete them before settling his remaining debts as soon as possible. Please accept our highest respect. Abdullah Obeid Director Copy to: Mr. Saleh Yousef, the engineer - for information

---

### csp_1628e85563215ccab45de95087cfb72f

B01 · header / mixed مدرسة فرنك عيني في البتاوين المختلطة تلفون - في بغداد الجديدة رقم الهاتف : ٩٣٣١٣ العدد ٧٥ / ١٠٢ التاريخ ٨ / ٦ / ١٩٥٨

B02 · stamp / latin FRANK INY SCHOOL Intermediate & Primary New Alwiyah - Baghdad TELEPHONE NO. 93313

B03 · paragraph / arabic تقرير لجنة التحقيق في الحادث الذي وقع في حفلة المدرسة السنوية يوم : ⟦illegible⟧ في الساعة ٧/٣٠ من مساء يوم الخميس المصادف ٥ / ٦ / ١٩٥٨ وبينما كانت الحفلة مستمرة في تقديم منهاجها الفني ، حدث ما يلي : ١ - بينما كانت احدى التلميذات تلقي كلمة باللغة الانكليزية ، حدثت ضجة في الجهة الخلفية من الساحة المخصصة للمدعوين بسبب خلاف وقع بين احد الحراس وبين احد الاشخاص الذين حاولوا الدخول بدون بطاقة دعوة ، وقد استطاع الحراس اخراجه . ٢ - بعد فترة لا تتجاوز الخمس دقائق تكررت الضجة في نفس المكان ثانية ، فأسرعنا نحن اعضاء اللجنة الى مكان الحادث وتبين لنا ان الحارس المذكور قد اصيب بجرح في رأسه . ٣ - قمنا على الفور بطلب الاسعاف للمصاب ونقله الى المستشفى ، كما قمنا بابلاغ مركز الشرطة بالحادث ، وقد حضر مأمور المركز واجرى التحقيق اللازم في حينه . ٤ - تبين من التحقيق ان الشخص الذي احدث الضجة هو المدعو ( ⟦illegible⟧ ) من سكنة منطقة البتاوين ، وقد تم القاء القبض عليه من قبل الشرطة . ٥ - استمرت الحفلة في تقديم فقراتها كالمعتاد ولم يؤثر هذا الحادث على سير البرنامج ، وقد انتهت الحفلة في الساعة الحادية عشرة مساءً . هذا ما لزم بيانه .

B04 · signature / mixed التواقيع : ١ - ⟦signature⟧ ٢ - ⟦signature⟧ ٣ - ⟦signature⟧

B05 · marginalia / arabic ملاحظة : نسخة منها الى مديرية معارف بغداد

**Traduction anglaise —**

Frank Iny School In the Mixed Bataween Telephone - In New Baghdad Telephone Number: 93313 Number 75 / 102 Date 8 / 6 / 1958 FRANK INY SCHOOL Intermediate & Primary New Alwiyah - Baghdad TELEPHONE NO. 93313 Report of the investigation committee on the incident that occurred at the school's annual party on: ⟦illegible⟧ At 7:30 PM on Thursday, corresponding to 5 / 6 / 1958, while the party was continuing to present its artistic program, the following occurred: 1 - While one of the female students was delivering a speech in English, a commotion occurred in the rear side of the area designated for invitees due to a dispute between one of the guards and a person who tried to enter without an invitation card, and the guards were able to remove him. 2 - After a period not exceeding five minutes, the commotion was repeated in the same place again, so we, the members of the committee, rushed to the scene of the incident and it became clear to us that the mentioned guard had suffered a wound to his head. 3 - We immediately requested an ambulance for the injured person and transferred him to the hospital, and we also informed the police station of the incident, and the station officer arrived and conducted the necessary investigation at the time. 4 - It appeared from the investigation that the person who caused the commotion is the one named ( ⟦illegible⟧ ) from the residents of the Bataween area, and he was arrested by the police. 5 - The party continued presenting its segments as usual, and this incident did not affect the progress of the program, and the party ended at eleven o'clock in the evening. This is what was necessary to state. Signatures: 1 - ⟦signature⟧ 2 - ⟦signature⟧ 3 - ⟦signature⟧ Note: A copy of it to the Baghdad Education Directorate

---

### csp_1bc2690ef3dc5fc8b87b5f79e907cf91

صحيفة ٣ ⟦line⟧

| المبلغ | السعر | الوحدة | تفاصيـــــــــــــل الاعمــــــــــــــال | | ٤٢٠,٨٠٥ | | | تابع لفقرة (١٢) أ انواع القير المحلي وان يضاف مقدار ١٠ بالمائة من السيالي اثناء حرق القير . ولا يجوز استعمال النفط الاسود بتاتا في القير مع ملاحظة ضرورة تراكب فرشة القير على السطوح بمقدار ٤ سم٠ على الاقل فوق بعضها . | | | | | ب ) تهوير السطوح بالتراب الناعم الذى تطابق نعومته رمل الحبانية وخلاف ذلك يجوز للمهندس المشرف رفضه . وتجرى اعمال التهوير بوضع التراب بطبقات لا تزيد على ٥ سم٠ ترطب قليلا بالماء وتدق بمدقات يدوية على ان يكون معدل سمك التهوير ١٠ سم٠ في الوسط و ١٥ سم قرب الستائر . | | | | | ج – تقير السطوح مرة اخرى بطبقة لا يقل سمكها عن ٣/٨ ״ مع ملاحظة ما جاء في الفقرة اعلاه . | | | | | د – ترشق السطوح بالطين المخمر مع التبن بطبقة لا يقل سمكها عن ( ٣ ) انجات على ان يستعمل للرشق الطين الاحمر الحرى الممزوج بالتبن بنسبة ٣– ٦ وان يخمر لمدة سبعة ايام وبعد جفاف الرشق تملاء كافة الشقوق بالمادة الاصلية على شرط ان يمضي على تخميرها مدة ( ١٥ ) يوما . | | ٢٢,٥٠٠ | ٢,٢٥٠ | ١٠ م ط | ١٣ – انابيب مياه الامطار تكون الانابيب من الاهين بقطر ٤ انجات ويشمل كل انبوب عكس في السطح وقاعدة من الاهين او الكونكريت في الاسفل ويجب توصيل العكس بواسطة قطعة انبوب صغيرة الى حوض الكونكريت في السطح الذى يجب ان تكون ابعاده ٣٠ سم في ٣٠ سم٠ في ٢٠ سم٠ على ان يكون سطح الحوض بمستوى الرشق ونسبة الكونكريت ١–٢–٤ مع مادة السيلوكريت كما هو موصوف مع مانع الرطوبة . | | ٧٥,٠٠٠ | ٠,٢٥٠ | ٣٠٠ م ٢ | ١٤ – البياض بالجص للجدران والسقوف مع ازار بالسمنت بارتفاع ٢٠ سم تنظف الحلول اولا بصورة جيدة بين الطابوق ثم تطرطش بشربت السمنت ومن ثم تبيض بطبقة لا يقل سمكها عن ١/٤ ״ وبعدها تبيض بالجص الممتاز المخمر بطبقة سمكها لا يقل عن ١/٤ انج . على ان يجرى البياض بالمساطر والشاقول وان تكون اوجه البياض صقيلة ومستوية تماما والاركان منتظمة التدوير . | | ٦٥,٠٠٠ | ٠,٥٠٠ | ١٣٠ م ٢ | ١٥ – اللبخ بالسمنت للاوجه الخارجية للبناية تنظف الحلول اولا بصورة جيدة بين الطابوق وثم ترش بالماء وتطرطش بشربت السمنت ومن ثم تبيض بالسمنت ورمل |

٥٩٢,٢٠٥ ” يتبع ”

**Traduction anglaise —**

Page 3 ⟦line⟧ Amount | Price | Unit | Details of Works 420,805 | | | Follow-up to Item (12) A Types of local bitumen, with the addition of 10 percent of Siyali during the burning of the bitumen. The use of black oil is strictly prohibited in the bitumen, noting the necessity of overlapping the bitumen layers on the surfaces by at least 4 cm over each other. | | | B) Leveling the surfaces with fine soil whose fineness matches Habbaniya sand, otherwise the supervising engineer may reject it. The leveling work is carried out by placing soil in layers not exceeding 5 cm, moistened slightly with water and compacted with hand rammers, provided the average thickness of the leveling is 10 cm in the middle and 15 cm near the parapets. | | | C) Bituminizing the surfaces once more with a layer thickness of not less than 3/8", taking into account what was stated in the paragraph above. | | | D) Rendering the surfaces with fermented mud and straw in a layer thickness of not less than (3) inches, provided that red free mud mixed with straw in a ratio of 3-6 is used for the rendering and fermented for seven days. After the rendering dries, all cracks are filled with the original material on the condition that its fermentation has lasted for (15) days. 22,500 | 2,250 | 10 L.M | 13 - Rainwater pipes The pipes shall be made of cast iron with a diameter of 4 inches, and each pipe includes an elbow at the roof and a cast iron or concrete base at the bottom. The elbow must be connected by a small piece of pipe to the concrete basin on the roof, the dimensions of which must be 30 cm by 30 cm by 20 cm, provided the surface of the basin is at the level of the rendering. The concrete ratio is 1-2-4 with Silocrete material as described with the moisture proofing. 75,000 | 0.250 | 300 m2 | 14 - Plastering with gypsum for walls and ceilings with a cement skirting 20 cm high The joints are first cleaned well between the bricks, then splashed with cement grout, and then plastered with a layer not less than 1/4" thick, followed by plastering with excellent fermented gypsum with a layer thickness not less than 1/4 inch. The plastering must be carried out using straightedges and plumb lines, and the plaster surfaces must be completely polished and level, with even rounded corners. 65,000 | 0.500 | 130 m2 | 15 - Cement rendering for the exterior faces of the building The joints are first cleaned well between the bricks, then sprayed with water and splashed with cement grout, then plastered with cement and sand. 592,205 "To be continued"

---

### csp_1ca265ac6bce5a388fe1d6f825bcfcd2

مدرسة فرنك عيني متوسطة وابتدائية بغداد رقم التلفون ٩١٦٩٣ FRANK INY SCHOOL INTERMEDIATE & PRIMARY Baghdad Telephone No. 91693

الرقم: ف / ٧١ / ٥٧ التاريخ: ٢٢ / ٣ / ١٩٥٧ No.: Date:

رئاسة اللجنة الادارية للطائفة الاسرائيلية ببغداد

بعد التحية ، الحاقا بكتابنا المرقم ف/٦٠ / ٥٧ والمؤرخ ١٠ / ٣ / ١٩٥٧ لا مانع لدينا من تسديد المبالغ التي يستحقها المقاول السيد ساسون شمعون عن بناية المدرسة على ان ينجز الترميمات البسيطة المتبقية فيما يتعلق بالصبغ وسقف بيت الماء للشرب . هذا وتفضلوا بقبول فائق الاحترام ،،

[Signature] ⟦illegible⟧ [Signature] المديــــر

**Traduction anglaise —**

Frank Iny School Intermediate & Primary Baghdad Telephone No. 91693 FRANK INY SCHOOL INTERMEDIATE & PRIMARY Baghdad Telephone No. 91693 No.: F / 71 / 57 Date: 22 / 3 / 1957 No.: Date: Presidency of the Administrative Committee of the Jewish Community in Baghdad Greetings, Further to our letter No. F/60/57 dated 10/3/1957 We have no objection to paying the amounts due to the contractor Mr. Sassoon Shamoon for the school building, provided he completes the simple remaining repairs regarding the painting and the roof of the drinking water house. Please accept our highest respect, ⟦illegible⟧ The Manager

---

### csp_1dafbbc31c8c5bcf9d144cbb32373751

صحيفة ١٤

| الفقرة | تفاصيـــــــــــــل الاعـــــــــــــــــمال | الكمية والوحدة | السعـــــــــر | المبلــــــــغ | | | تابع للفقرة ( ٢٣ ) | | | | | | أ - نقطة خفية مع بوريات غير مشقوقة ذات سن . | ١٥٠ | ... | ٧٥ ... | | | ب - نقطة ظاهــــــــرة | | | | | | ملاحظــــــــــــــــــــة | | | | | | تعتبر النقطة ذات الطريقين بنقطة ونصف واعتبار | | | | | | البلك مهما كانت نوعيته نصف نقطة . | | | | | ٢٤ | السقــــــــــــــــــــوف | ٢٦٥٠ | ... | ٧٤٢ ... | | | وتكون بالكونكريت المسلح حسب الخرائط التي | | | | | | يقدمها المهندس من ناحية السمك والتسليح | | | | | | ويكون الخلط بنسبة ١ = ٢ = ٤ . | | | | | | يطلب وضع سعر الوحدة كما يلي لتتبع فيما اذا | | | | | | ارتأت الطائفة تبديل نوعية السقوف :- | | | | | | أ - السقوف من نوع السبيرت الكونكريتية . | ٤٨٠٠ | ⟦...⟧ | ٥٨٨ ... | | | ب - اذا كانت السقوف من العقادة مع العلم | ٢٧٥٠ | ... | ٦٥٨ ... | | | بأن الجسور الفولاذية ( الشيلمان ) المستعملة | | | | | | ٦ في ٣ موضوعة بمسافة ٧٥ سم من وسط | | | | | | الى وسط ويشمل السعر الشيلمان كذلك على | | | | | | ان يصبغ بالصبغ المضاد للصدأ قاطين . | | | | | | ملاحظــــــــــــــــــــة | | | | | | تقاس السقوف في جميع الحالات من داخل الغرف | | | | | | اي صافي المساحة واما القسم المرتكز على البناء | | | | | | فيعتبر قسم من بناء الطابوق لذا على المتعهد | | | | | | اخذ ذلك بنظر الاعتبار . | | | | | ٢٥ | البناء بالطابوق والجص للتبييغ | ٣٥٠٠ | -/٧٥٠ | ٢٧٥ ... | | | انظر مواصفات البناء بالطابوق الواردة في البند ( ٨ ) . | | | | | ٢٦ | محجر الـــــــــــــدرج | ٧٠٠٠ | ... | ١٤٠ ... | | | ويكون قائما على احسن صنعة وجودة من ناحية | | | |

[Marginalia] ⟦بيد نقطة ظاهرة⟧ [Marginalia] ⟦٢٤٨٠⟧ [Marginalia] ⟦٣٥٠٠⟧ [Marginalia] ⟦٧٠٠٠⟧

٢٨٢٧/٢٢٠

[Signature] ⟦يوسف صالح⟧

**Traduction anglaise —**

Page 14 Item | Details of Work | Quantity and Unit | Price | Amount | Continuation of Item (23) | | | | a - Hidden point with non-slotted pipes with threads. | 150 | ... | 75 ... | b - Visible point | | | | Note | | | | A two-way point is considered one and a half points and considering | | | | The plug, regardless of its type, as half a point. | | | 24 | Ceilings | 2650 | ... | 742 ... | and shall be made of reinforced concrete according to the maps | | | | provided by the engineer in terms of thickness and reinforcement | | | | and the mixing shall be in the ratio of 1 = 2 = 4. | | | | It is requested to set the unit price as follows to follow up whether | | | | the sect decided to change the quality of the ceilings:- | | | | a - Concrete Siporex type ceilings. | 4800 | ⟦...⟧ | 588 ... | b - If the ceilings were made of Jack arching (Aqqada), knowing | 2750 | ... | 658 ... | that the steel beams (I-beams) used are | | | | 6 x 3 placed at a distance of 75 cm from center | | | | to center, and the price includes the I-beams as well as | | | | being painted with two coats of anti-rust paint. | | | | Note | | | | Ceilings are measured in all cases from inside the rooms | | | | i.e., net area, while the section resting on the building | | | | is considered part of the brickwork; therefore, the contractor must | | | | take that into consideration. | | | 25 | Brickwork and gypsum for plastering | 3500 | -/750 | 275 ... | See the brickwork specifications mentioned in item (8). | | | 26 | Staircase railing | 7000 | ... | 140 ... | and shall be based on the best workmanship and quality in terms of | | | ⟦By hand a visible point⟧ ⟦2480⟧ ⟦3500⟧ ⟦7000⟧ 2827/220 ⟦Yousef Saleh⟧

---

### csp_214f217c55e759f89c4de2e1c395d9c9

صحيفة ٢

فيها الا بموافقة الطائفة الاسرائيلية الخطية .

١١ -- ⟦line⟧ طرد مستخدمي المقاول للمهندس صلاحية تامة لان يطلب من المقاول طرد او اقصاء اي كان من مستخدميه عما ترى الطائفة عدم مرغوبية وصلاحية استمرارهم في العمل وعلى المقاول ان ينفذ تلك الطلبات فور صدورها ولا يحق له المطالبة بأي تعويض او تضمين قد يترتب على ذلك بأي شكل كان .

١٢ -- السلفــــــات تدفع الطائفة سلفات نقدية في نهاية كل شهر عن الاعمال المنجزة والمواد المجهزة في موقع العمل بعد استحصال شهادة من المهندس بذلك وذلك على اساس ٩٠ بالمائة من كلفة الاعمال المنجزة بموجب اسعار المقاولة و ٧٥ بالمائة من قيمة المواد الانشائية المجهزة في موقع العمل حسب تقديرها المحلي . على ان لا تعتبر هذه السلفات الممنوحة الى المقاول بمثابة اعتراف بقبول العمل من جانب الطائفة بل تطبق شروط المقاولة على جميع العمل المنجز وغير المنجز الى ان يتم تسليمه نهائيا الى الطائفة .

١٣ -- الذرعة النهائية وتسديد حساب المقاول بعد اكمال العمل تماما من كافة الوجوه بشهادة مهندس الطائفة تقوم الطائفة الاسرائيلية باستلام العمل استلاما موقتا ويسدد حساب المقاول بموجب المبلغ الاجمالي المقطوع المتفق عليه في هذه المقاولة بعد طرح كافة السلف المدفوعة الى المقاول على حساب اعماله اما تأمينات المقاول فتحتفظ بها الطائفة مدة الصيانة وتعاد اليه بانتهائها وبعد الاستلام النهائي للعمل .

١٤ -- رفض العمــــــل يحق للمهندس رفض اي مواد يجهزها المقاول او اي عمل يكون بنظر المهندس قائما على جودة وصنعة غير مستوفيتين للمستوى المطلوب او غير مطابق للمواصفات او الخرائط المختصة بالمقاولة وعلى المقاول ان يرفع المواد والعمل المرفوض ويعيد تنفيذه على نفقته الخاصة بما فيه المواد الموجودة في العمل المرفوض . كل عمل يقام به بدون تفويض بالاضافة الى التفاصيل المعطاة في الخرائط او التعليمات الصادرة سوف <del>لا</del> يعترف به ولا يقام بذرعته ولا يدفع الى المقاول قيمة المواد المستعملة في تنفيذ مثل هذه الاعمال .

١٥ -- مدة الصيانــــــــة على المقاول ان يقوم بصيانة العمل لمدة ثلاثة اشهر من تاريخ استلام الطائفة للعمل منه استلاما موقتا وعليه ان يصلح جميع النواقص او العيوب التي قد تظهر ابان مدة

**Traduction anglaise —**

Page 2 therein except with the written consent of the Jewish Community. 11 -- ⟦line⟧ Dismissal of the Contractor's Employees The Engineer has full authority to request the Contractor to dismiss or exclude any of his employees whom the Community deems undesirable or unfit to continue in the work, and the Contractor must implement those requests immediately upon their issuance. He has no right to claim any compensation or damages that may result from that in any form whatsoever. 12 -- Advances The Community pays cash advances at the end of each month for the work completed and materials provided at the work site after obtaining a certificate from the Engineer to that effect, based on 90 percent of the cost of the work completed according to the contract prices and 75 percent of the value of the construction materials provided at the work site according to its local estimation. Provided that these advances granted to the Contractor shall not be considered an admission of acceptance of the work by the Community; rather, the contract terms apply to all completed and uncompleted work until it is finally handed over to the Community. 13 -- Final Measurement and Settlement of the Contractor's Account After the work is completely finished in all respects as certified by the Community's Engineer, the Jewish Community shall take over the work provisionally, and the Contractor's account shall be settled according to the total lump sum amount agreed upon in this contract after deducting all advances paid to the Contractor on account of his work. As for the Contractor's securities, the Community shall retain them for the maintenance period and they shall be returned to him upon its expiration and after the final handover of the work. 14 -- Rejection of Work The Engineer has the right to reject any materials provided by the Contractor or any work that is, in the Engineer's view, based on quality and workmanship that do not meet the required standard or are not in accordance with the specifications or drawings pertaining to the contract. The Contractor must remove the rejected materials and work and re-execute it at his own expense, including the materials present in the rejected work. Any work carried out without authorization in addition to the details given in the drawings or the issued instructions will <del>not</del> be recognized, nor will it be measured, and the Contractor will not be paid the value of the materials used in the execution of such works. 15 -- Maintenance Period The Contractor must maintain the work for a period of three months from the date the Community takes over the work from him provisionally, and he must repair all deficiencies or defects that may appear during the period

---

### csp_26180d35b2c65ac7bb8075ff8b3e3c13

رئاسة اللجنة الادارية للطائفة الاسرائيلية ببغداد

العدد :: ⟦١٩⟧ التاريخ :: ٢٠ / ١ / ١٩٥٧

حضرة المقاول السيد ساسون شمعون المحترم

استنادا الى المقاولة المعقودة بين رئاسة اللجنة الادارية للطائفة الاسرائيلية ببغداد وبينكم ، تعهدتم باتمام العمل بمدة اقصاها شهرين ونتيجة للزيادة الحاصلة في البناء والتي لا تتعدى باية حال من الاحوال ٢٥ ٪ تكون مدة العقد لا تتجاوز ٧٥ يوما بينما مضى على البناء مدة تتجاوز الـ ١٠٠ يوم بموجب كتاب الطائفة المؤرخ ١٠ / ٣ / ١٩٥٦ والمرقم م / ٣٦٥ / ٥٦ الذي يامركم فيه بالعمل وبما ان من حق الطائفة ان تستقطع من تاميناتكم ثلاثة دنانير يوميا حسب المادة ـ ٦ ـ من صحيفة الشروط العامة وليس لك عذر باي حال من الاحوال حسب نفس المادة التي تنص ( وسوف يرفض اي اعتراض يقدم من قبل المقاول لتأخره بالعمل ) وخلافك مع مهندس الطائفة لا يبرر تخلفك او تأخرك حسب المادة الخامسة من نفس الصحيفة والتي تنص :-

للمهندس المشرف الحق في تعديل الخرائط والكميات حسب ما يراه مناسبا ولا يحق للمقاول الاعتراض على ذلك وان الكميات الزائدة والناقصة تسعر حسب سعر المقاول في جدول الكميات .

لذا فاللجنة الادارية تنذركم بموجب المادة السادسة من الصفحة الثانية من الشروط العامة التي تنص يتنازل الفريقان المتعاقدان عن توجيه الانذارات من احدهما الى الاخر بواسطة كاتب العدل في شؤون هذه المقاولة وكل انذار موجه من احد الفريقين ينبغي اما ان يسلم بعنوان الفريق الاخر او ان يرسل اليه بالبريد المسجل .

ان اللجنة الادارية تنذركم بموجب هذه المادة بالبدأ بالعمل في تأريخ اقصاه يوم الثلاثاء الموافق ٢٢ / ١ / ١٩٥٧ وفي حالة عدم بدأكم بالتأريخ المذكور فقد تضطر الطائفة باستعمال حقها حسب المادة ـ ١٨ ـ وتقوم هي باتمام العمل على حسابكم استنادا الى بنود تلك المادة .

فاذا لم تبدأ في العمل في التأريخ المذكور فيرجى منكم الحضور يوم الثلاثاء من نفس التأريخ السابق مساء لاجراء الجرد اللازم حسب ما تنص المادة ـ ١٨ ـ وفي حالة عدم حضوركم او حضور من يمثلكم فسوف تضطر الطائفة الى القيام بالجرد اللازم حسب ما ينص عليه البند ج من المادة ـ ١٨ ـ التي تنص :-

فاذا لم يحضر المقاول او لم يرسل مندوبا ينوب عنه فيجرى الجرد بغيابه ويعلمكم بذلك بان الطائفة سوف تتوقف عن دفع مبلغ لكم الى حين اتمام العمل حسب ما تنص عليه المادة ـ ١٨ ـ والذى هو ( يمكن للطائفة ان تمتنع عن صرف اي مبالغ تكون مستحقة له حتى يتم تسوية هذه النفقات والخسائر ) ان الطائفة تمنعكم من رفع اية مواد او ادوات او مكائن عائدة لكم في حالة عدم بدأكم بالعمل في التأريخ المذكور حسب المادة ـ ١٨ ـ من الشروط العامة .

ان هذا الانذار لا يمنع الطائفة من التمسك بحقها بتغريمكم حسب ما تنص عليه المقاولة (٦) كما ان امرها لكم بالبدأ بالعمل لا يعتبر اعترافا بجودة العمل الذي تم .

هذا وتفضلوا بقبول فائق الاحترام

[Signature] رئيس اللجنة الادارية

صورة منه الى :- ملف المقاول في الطائفة مدير مدرسة فرنك عيني مهندس الطائفة

**Traduction anglaise —**

Presidency of the Administrative Committee of the Jewish Community in Baghdad Number :: ⟦19⟧ Date :: 20 / 1 / 1957 The Respected Contractor, Mr. Sasson Shamoun, Pursuant to the contract concluded between the Presidency of the Administrative Committee of the Jewish Community in Baghdad and you, you undertook to complete the work within a maximum period of two months. As a result of the increase in construction, which does not in any case exceed 25%, the duration of the contract should not exceed 75 days, whereas construction has been ongoing for more than 100 days according to the Community's letter dated 10 / 3 / 1956 and numbered M / 365 / 56 which orders you to work. Since the Community has the right to deduct three Dinars daily from your insurance according to Article - 6 - of the General Conditions sheet, and you have no excuse in any case according to the same article which states (and any objection submitted by the contractor for his delay in work will be rejected), and your disagreement with the Community engineer does not justify your failure or delay according to the fifth article of the same sheet which states: - The supervising engineer has the right to modify maps and quantities as he deems appropriate, and the contractor has no right to object to that, and the excess or deficient quantities are priced according to the contractor's price in the bill of quantities. Therefore, the Administrative Committee warns you according to Article Six of the second page of the General Conditions which states: The two contracting parties waive the serving of warnings from one to the other through the notary public in the affairs of this contract, and every warning addressed by one of the parties must either be delivered to the other party's address or sent to them by registered mail. The Administrative Committee warns you under this article to start work on a date no later than Tuesday, 22 / 1 / 1957. In the event that you do not start on the aforementioned date, the Community may be forced to exercise its right according to Article - 18 - and complete the work on your account based on the provisions of that article. If you do not start work on the aforementioned date, please attend on Tuesday of the same previous date in the evening to conduct the necessary inventory according to Article - 18 -. In the event of your absence or the absence of whoever represents you, the Community will be forced to conduct the necessary inventory according to Clause C of Article - 18 - which states: - If the contractor does not attend or does not send a representative on his behalf, the inventory shall be conducted in his absence. We inform you that the Community will stop paying any amount to you until the completion of the work according to Article - 18 - which is (the Community may refrain from paying any amounts due to him until these expenses and losses are settled). The Community prevents you from removing any materials, tools, or machinery belonging to you in the event that you do not start work on the aforementioned date according to Article - 18 - of the General Conditions. This warning does not prevent the Community from upholding its right to fine you according to what the contract states (6), and its order to you to start work is not considered an acknowledgment of the quality of the work that has been completed. Please accept our highest respects. President of the Administrative Committee A copy to: - The contractor's file in the Community The Director of Frank Iny School The Community Engineer

---

### csp_2a71efa9744f5c84ab923f61093e36f1

ادارة المجلس الجسماني للطائفة الاسرائيلية في بغداد

الرقم : ١٥١٤ التاريخ : ١٩٣١/١١/٥

مديرة مدرسة شماش " مدارس الاليانس " مدرسة شمعون " المدرسة الوطنية " مدرسة مسعودة سلمان <del>" مدارس المدراش</del>

يرجو مجلسنا تقديم حسابات طلباتكم المتراكمة على صندوق مجلسنا حتى نهاية آب سنة ١٩٣١ بصورة مفصلة :

[Signature] ⟦signature⟧ [Signature] ⟦signature⟧ [Signature] ⟦signature⟧ [Signature] الرئيـــــــــس

[Marginalia] ما يشار اليهم

[Stamp] ⟦illegible rectangular stamp⟧

**Traduction anglaise —**

Administration of the Lay Council of the Jewish Community in Baghdad Number: 1514 Date: 5/11/1931 Director of Shamash School " Alliance Schools " Shamoun School " National School " Masouda Salman School <del>" Midrash Schools</del> Our council requests the submission of your accounts of accumulated claims on our council's fund until the end of August 1931 in detail: ⟦signature⟧ ⟦signature⟧ ⟦signature⟧ President Those referred to ⟦illegible rectangular stamp⟧

---

### csp_2c4fab7398e65fcc80aa74456ccba786

B01 · header / arabic ⟦illegible⟧

B02 · other / latin 12.55 9.90 5.00 5.00 3.80 1.60 3.80 7.10 10.20 12.85 25.40 .25 .25 .25 .25 .25 .25 .25 .25

**Traduction anglaise —**

⟦illegible⟧ 12.55 9.90 5.00 5.00 3.80 1.60 3.80 7.10 10.20 12.85 25.40 .25 .25 .25 .25 .25 .25 .25 .25

---

### csp_33b854350cb0589f9231266b31fdc9f1

صحيفة 3

18 – سحب العمل من المقاول وما يترتب عليه ⟦line⟧

أ – اذا عجز المقاول عن البدأ بالعمل بسرعة لمجرد استلامه اخطارا كتابيا بذلك . ب – او اذا قصر في القيام بتنفيذ الاعمال بالسرعة المطلوبة . ج – او اذا عجز عن القيام بتنفيذ الاعمال بما يطابق العقد . د – او اذا تأخر في اكمال الاعمال عن الميعاد المحدد في العقد . هـ – او اذا اوقف العمل فعلا لمدة اربعة عشر يوما بدون تصريح كتابي من الطائفة الا اذا اثبت وجود قوة قاهرة واخبر المهندس والطائفة بها فورا وكتابة . و – او اذا عجز عن توريد او تركيب آلات وعمال ومواد ومهمات كافية ومناسبة حتى يمكن ان ينفذ العمل الدائم بسرعة وبدون انقطاع . ز – او اذا ارتكب بالذات او بالواسطة اية مخالفة لاى نص او نصوص المقاولة ملزم بتنفيذه او بملاحظته واستمر في هذه المخالفة مدة 14 يوما ( مع مراعاة اى شرط خاص ينص على مدة اقصر ) بعد انذاره كتابة من المهندس باصلاح هذه المخالفة . ح – او اذا ترك العمل كليا . ط – او اذا اصبح المقاول ( سواء كان في العراق او في الخارج ) مفلسا او اذا قدم طلبا بالافلاس او ثبت عسره المالي او تصالح مع دائنه او اذا كان المقاول شركة وجرت تصفيتها سواء أكانت التصفية جبرية ام اختيارية ( الا اذا كانت التصفية اختيارية يقصد اعادة تأليف الشركة على اساس مقررة كتابة من الحكومة ) او اذا كان المقاول شركة وجرى حلها او اذا اعطى المقاول او وعد او قدم هدية او سلفة او مكافئة او منفعة مهما كانت نوعها لاى موظف او عامل من موظفي الطائفة سواء أكان مستقلا او له اى علاقة بالعمل موضوع هذا العقد فللطائفة في اى حالة من هذه الاحوال :ـ

1 – ان تسحب من المقاول تنفيذ باقي الاعمال . 2 – ويكون سحب تنفيذ باقي الاعمال طبقا لما ذكر آنفا بموجب ارسال انذار كتابي بأمر من رئيس اللجنة الادارية للطائفة الاسرائيلية الى المقاول ويكون هذا الانذار صحيحا نافذ المفعول بدون اتخاذ اى اجراءات قانونية او رسمية . 3 – واذا منح المقاول اى مهلة او تساهل فأن ذلك لا يقلل او يخل بحقوق الطائفة بمقتضى هذه المادة ولا تمس الاحكام السابقة بحق الطائفة في المطالبة بالتعويضات المقررة بمقتضى القوانين المرعية . 4 – وفي حالة سحب العمل او جزء منه من المقاول طبقا لما سبق بيانه او طبقا لاى احكام اخرى واردة بالعقد للطائفة تبعا لتقديرها الكلفة ان تستعمل احد الحقوق الاتية :ـ

أ – ان تقوم بنفسها على حساب المقاول بتنفيذ جميع الاعمال التي لم تتم بعد او اى جزء منها . ب – ان تضع كل او بعض الاعمال التي لم تتم بعد في المناقصة من جديد .

,, يتبع ,,

**Traduction anglaise —**

Page 3 18 – Withdrawal of Work from the Contractor and its Consequences ⟦line⟧ A – If the contractor fails to start the work promptly upon receiving written notice to do so. B – Or if he falls short in performing the execution of works with the required speed. C – Or if he fails to perform the execution of works in accordance with the contract. D – Or if he delays in completing the works beyond the deadline specified in the contract. E – Or if he actually stops work for a period of fourteen days without written permission from the Community, unless he proves the existence of force majeure and immediately informs the Engineer and the Community in writing. F – Or if he fails to supply or install machinery, labor, materials, and equipment that are sufficient and appropriate so that the permanent work can be executed quickly and without interruption. G – Or if he commits, personally or through an intermediary, any violation of any provision or provisions of the contract he is bound to execute or observe, and continues in this violation for a period of 14 days (taking into account any special condition stipulating a shorter period) after being warned in writing by the Engineer to rectify this violation. H – Or if he abandons the work entirely. I – Or if the contractor becomes (whether in Iraq or abroad) bankrupt, or if he files an application for bankruptcy, or if his financial insolvency is proven, or if he reaches a settlement with his creditors, or if the contractor is a company and it has been liquidated, whether the liquidation was compulsory or voluntary (unless the voluntary liquidation is intended for the re-formation of the company on a basis approved in writing by the government), or if the contractor is a company and it was dissolved, or if the contractor gives, promises, or offers a gift, advance, reward, or benefit of any kind to any employee or worker among the Community's employees, whether he is independent or has any relation to the work subject of this contract, then the Community may, in any of these cases:ـ 1 – Withdraw from the contractor the execution of the remaining works. 2 – The withdrawal of the execution of the remaining works shall be according to what was previously mentioned by sending a written warning by order of the President of the Administrative Committee of the Israelite Community to the contractor, and this warning shall be valid and effective without taking any legal or official procedures. 3 – If the contractor is granted any extension or leniency, this does not reduce or prejudice the rights of the Community under this article, and the preceding provisions do not affect the Community's right to claim the compensations established under the laws in force. 4 – In the event of withdrawing the work or part of it from the contractor according to what was previously explained or according to any other provisions contained in the contract, the Community may, at its discretion regarding cost, exercise one of the following rights:ـ A – To perform itself, at the contractor's expense, the execution of all the works that have not been completed yet, or any part thereof. B – To put all or some of the works that have not been completed yet out for tender again. ,, Continued ,,

---

### csp_38a33342f9505bb4918180532fa1a4ac

١٩٥٧ / ٣ / ٧

سعادة رئيس اللجنة الادارية المحترم

الموضوع : البناء الجديد في مدرسة فرنك عيني

لقد بلغت الأعمال في البناء الجديد في مدرسة فرنك عيني بضمنها المواد وكافة المصاريف الأخرى ٢١١٠,١٢٢ دينار (فقط الفان ومائة وعشرة دنانير ومائة واثنان وعشرين فلساً). لذا ارجو سعادتكم تسديد ما تبقى بذمة الطائفة بعد استقطاع السلف وبعد استلام كتاب من مدير مدرسة فرنك عيني يعلمكم فيه باستلام البناء استلاماً مؤقتاً حسب بنود المقاولة المعقودة بين سعادتكم وبين المتعهد السيد سلوم شمعون .

هذا ولكم الأمر .

[Signature] المهندس [Signature] صالح يوسف

١- نسخة منه الى الطائفة . ٢- = = الى السيد عبدالله عوبديا مدير مدرسة فرنك عيني لاتخاذ ما يلزم .

**Traduction anglaise —**

1957 / 3 / 7 Honorable Chairman of the Administrative Committee Subject: The new building at Frank Iny School

The works on the new building at Frank Iny School, including materials and all other expenses, have reached 2110.122 Dinars (only two thousand one hundred and ten Dinars and one hundred and twenty-two Fils). Therefore, I request Your Honor to settle the remaining balance owed by the community after deducting the advances and after receiving a letter from the Principal of Frank Iny School informing you of the provisional receipt of the building according to the terms of the contract concluded between Your Honor and the contractor Mr. Salloum Shamoun. This is for your consideration. Engineer Saleh Yousef 1- A copy of it to the community. 2- = = to Mr. Abdullah Obadia, Principal of School Frank Iny to take the necessary action.

---

### csp_3910ec363f8b56a29a3455d794ba0198

صحيفة ٥

| المبلغ | السعر | الكمية / الوحدة | تفاصيـــــــــــــل الاعمـــــــــــــال | | ٨٧٤,٦٢٥ | | | تابع للفقرة ( ١٩ ) | | | | | والرمل بنسبة ( ١-٣ ويجب ان يكون التبليط مستويا ومثبتا بصورة قوية وبعد الانتهاء من التبليط يشربت وجه الكاشي بمونة الاسمنت والرمل الناشف للمحافظة عليه من التلوث بالاصباغ وغير ذلك . | | ٦,٢٠٠ | ١,٠٠٠ | ⟦٦.٢٠ م.ط⟧ | ٢٠) عتبات الشبابيك من الموزائك الجيد بالالوان التي يختارها المهندس المشرف بعرض حوالي الـ ٢٥ سم. | | ٤٥,٠٠٠ | ٠,٧٥٠ | ⟦٦٠ م٢⟧ | ٢١) التبليط بالكاشي السادة ومونة الجص | | | | | لاحظ ما جاء في الفقرة ( ١٩ ) | | ١٠,٠٠٠ | ٠,٢٥٠ | ⟦٤٠ م٢⟧ | ٢٢) الصبغ بالدهـــــــــــــان | | | | | بعد اكمال العمل يكون صبغ الابواب والشبابيك مع اطاراتها بالدهن ثلاثة قوط وباللون الذي يقرره المهندس على ان يكون الصبغ الدهني من النوع السائل داخل براميل مختومة وان يكون معادلا في الجودة لاصباغ الشركة الكيماوية البريطانية ( آي . سي . آي ) على ان يجرى الصبغ بالفرشاة . ⟦تحت الشبابيك بوجه واحد⟧ | | ٤٥,٠٠٠ | ٠,١٥٠ | ⟦٣٠٠ م٢⟧ | ٢٣) الصبغ بالايمولشن ( ) | | | | | تجهز الايمولشن من شركة (آي. سي. آي ) بالالوان التي يختارها المهندس المشرف ثم القيام بالصبغ للجدران بعد تنظيفها ومسحها جيدا والطلاء بالفرشاة قاطين وللطائفة الحق بتجهيز صباغ خاص اذا ارتأت ضرورة لذلك وعند عدم موافقة مهندسها المشرف على نوعية الصبغ وطريقته . | | | | | ٢٤) التأسيسات الكهربائية | | | | | على المقاول القيام بكافة التأسيسات الكهربائية المطمورة وتكون الاسلاك والانابيب والتأسيسات الكهربائية الاخرى من نوع جي. ئي. سي وتكون النقطة كاملة من كافة الوجوه بضمنها المصباح والمظلة من الخزف . | | ٢٠,٠٠٠ | ٤,٠٠٠ | ⟦عدد ٥⟧ | أ - نقطة خفية مع بويات غير مشقوقة . | | ٦,٠٠٠ | ٢,٠٠٠ | ⟦عدد ٣⟧ | ب - نقطة ظاهرة . | | ١,٠٠٦,٨٢٥ | | | |

,, يتبع ,,

**Traduction anglaise —**

Page 5 Amount | Price | Quantity / Unit | Work Details 874.625 | | | Follow-up to paragraph (19) | | | and sand in a ratio of (1-3). The tiling must be level and firmly fixed. After completing the tiling, the tile surface is to be grouted with a mortar of cement and dry sand to protect it from contamination by paints and other materials. 6.200 | 1.000 | ⟦6.20 m.p⟧ | 20) Window sills made of high-quality mosaic in colors chosen by the supervising engineer, with a width of approximately 25 cm. 45.000 | 0.750 | ⟦60 m2⟧ | 21) Tiling with plain tiles and gypsum mortar | | | Note what was stated in paragraph (19) 10.000 | 0.250 | ⟦40 m2⟧ | 22) Painting with oil paint | | | After completion of the work, the doors and windows with their frames shall be painted with three coats of oil paint in the color decided by the engineer, provided that the oil paint is of the liquid type inside sealed barrels and equivalent in quality to the British Imperial Chemical Industries (I.C.I) paints, and that the painting is carried out by brush. ⟦Under windows on one side⟧ 45.000 | 0.150 | ⟦300 m2⟧ | 23) Painting with emulsion ( ) | | | Provide emulsion from (I.C.I) company in colors chosen by the supervising engineer, then paint the walls after cleaning and wiping them well, applying two coats by brush. The Community has the right to provide a special painter if it deems it necessary or if its supervising engineer does not approve the quality or method of painting. | | | 24) Electrical Installations | | | The contractor shall perform all concealed electrical installations. The wires, pipes, and other electrical installations shall be of the G.E.C type, and the point shall be complete in all respects including the lamp and the porcelain shade. 20.000 | 4.000 | ⟦No. 5⟧ | A - Concealed point with non-slotted boxes. 6.000 | 2.000 | ⟦No. 3⟧ | B - Surface point. 1,006.825 | | | ⟦line⟧ To be continued ⟦line⟧

---

### csp_3dbb7ccd3e7f5bb1aa6c9c1370582d2b

صحيفة ٧

| الفقرة | تفاصيل الاعمال | الكمية والوحدة | السعر | المبلغ | | | تابع للفقرة ( ٤ ) ويغطس الطابوق المصخرج قبل البناء في الماء لمدة كافية لا تقل عن ستة ساعات وتملاء جميع المفاصل الشاقولية والافقية بمونة السمنت وتستمر عملية الرش بالماء للجدران مدة لا تقل عن سبعة ايام . يشمل السعر جميع ما ذكر اعلاه بصورة متقنة وجيدة . ( ويحق لمهندس الطائفة رفض اي قسم من البناء لا يراه مطابقا للشروط الفنية او لسبب احتوائه على املاح ) . | | | | | ٥ | خرسانة مانع الرطوبة مع السيلوكريت بسمك ٣ انجات للجدران . تكون نسبة الخلط ١ = ٢ = ٤ من السمنت ورمل الحبانية والحصى النهري المغسول المتدرج الحجم من ٣/٤,, فما دون وتكون نسبة السيلوكريت ١ - ١٥ من كمية الماء اللازم ولعمل الخرسانة ويشمل السعر ما يلزم من القوالب الخشبية . | | - / ٧٨٠ | ٤٦ ٥٤٠ | | ٦ | بياض مانع الرطوبة مع السيلوكريت بسمك ١,, للجدران تكون نسبة المزيج ١ - ٣ من السمنت ورمل الحبانية وتكون نسبة السيلوكريت ١ - ٨ من كمية الماء اللازم للمزيج . ان مستوى مانع الرطوبة هذا يقع بارتفاع خمسة سوف فوق مانع الرطوبة الكونكريتي الاول والبناء بين مانع الرطوبة الاول والثاني يكون بناء بالاسمنت بنسبة ١ = ٤ . | | - / ٢٩٠ | ٨ ٨٦٠ | | ٧ | صب كونكريت تحت الكاشي بسمك ٥ سم يكون الكونكريت بنسبة ١ - ٣ - ٦ سمنت مع رمل الحبانية والحصى النهري المغسول ويكون الكونكريت مخلوط بالسيلوكريت كما جاء في ⟦...⟧ | | - / ٤٩٠ | ٦٨ ٦٠٠ | | | | | ٧٨٠ | ١٤٠٧ |

[Marginalia] ملاحظة : ان مواصفات الطابوق ⟦...⟧

[Signature] ⟦illegible signature⟧

**Traduction anglaise —**

Page 7 Item | Work Details | Quantity and Unit | Price | Amount | Continued from Item (4) The exposed bricks are soaked in water before construction for a sufficient period of not less than six hours, and all vertical and horizontal joints are filled with cement mortar. The process of spraying the walls with water continues for a period of at least seven days. The price includes all of the above mentioned in a masterful and good manner. (The Community Engineer has the right to reject any part of the construction that he does not see as complying with the technical conditions or because it contains salts). | | | 5 | Damp-proof concrete with Silocrete, 3 inches thick for the walls. The mixing ratio shall be 1 = 2 = 4 of cement, Habbaniya sand, and washed river gravel, graded in size from 3/4" and below, and the Silocrete ratio shall be 1-15 of the required water quantity for making the concrete. The price includes the necessary wooden formwork. | | 780 / - | 540 46 6 | Damp-proof plaster with Silocrete, 1" thick for walls. The mixture ratio shall be 1-3 of cement and Habbaniya sand, and the Silocrete ratio shall be 1-8 of the required water quantity for the mixture. The level of this damp-proof course is at a height of five courses above the first concrete damp-proof course, and the construction between the first and second damp-proof courses shall be cement construction at a ratio of 1 = 4. | | 290 / - | 860 8 7 | Casting concrete under the tiles with a thickness of 5 cm. The concrete shall be at a ratio of 1-3-6 cement with Habbaniya sand and washed river gravel, and the concrete shall be mixed with Silocrete as stated in ⟦...⟧ | | 490 / - | 600 68 | | | 780 | 1407 Note: The brick specifications ⟦...⟧ ⟦illegible signature⟧

---

### csp_400aabc1f15a56fba8f700bb4a9718a6

مناقصة سرية لانشاء على الارض المرقمة بمحلـــــــــــــــة الشروط العامــــــــــــة

١- على المناقص تقديم تأمينات نقدية قدرها ٥ بالمائة ويجوز تقديم هذه التأمينات على شكل كتاب ضمان من احد المصارف الى رئاسة الطائفة الاسرائيلية ببغداد .

٢- على المناقص تقديم وثائق المقاولة بغلاف مختوم في او قبل الساعة ١٢ زوالية من اليوم الموافق ٩ / ١٢ / ١٩٥٧ الى رئاسة الطائفة الاسرائيلية ببغداد على ان يكتب على الغلاف ( مناقصة سرية لانشاء )

٣- تحتفظ الطائفة بحق عدم قبول اوطأ المناقصات سعرا ولها ان ترفض اية مناقصة بدون اعطاء اسباب لذلك .

٤- كل مناقصة لا تقدم في الموعد المعين في الفقرة ( ٢ ) اعلاه او لا تكون مرفقة بالتأمينات المنصوص عليها سيكون نصيبها الاهمال .

٥- للمهندس المشرف الحق في تبديل الخرائط والكميات حسب ما يراه مناسبا ولا يحق للمقاول الاعتراض على ذلك وان الكميات الزائدة والناقصة تسعر حسب سعر المقاول في جدول الكميات .

٦- اذا تأخر المقاول في انجاز العمل ضمن المدة المعينة من قبله عليه ان يدفع خمسة دنانير ( -/٥ دنانير ) يوميا للطائفة الاسرائيلية ببغداد وسوف يرفض اي اعتراض يقدم من قبل المقاول لتأخره بالعمل وتستقطع هذه التعويضات من استحقاقه او تأميناته .

٧- عند عدم ذكر نوعية اية مادة موجودة في جدول الكميات سيكون المهندس المشرف وحده مسؤولا باختيارها حسب ما يراه مناسبا ولا يحق للمقاول الاعتراض على ذلك مطلقا .

٨- على المقاول ان يبين المدة التي يحتاجها لانجاز العمل وان هذه المدة ستؤخذ بنظر الاعتبار عند دراسة المناقصة .

٩- على المناقصين التوقيع على كافة الخرائط المرفقة مع هذه المناقصة وكذلك جميع صفحات المناقصة واعاد تها ضمن عطائهم .

١٠- المـــــــواد على المقاول تجهيز كافة المواد اللازمة للعمل والمثبتة في الخرائط وجدول الاسعار ويكون المقاول وحده مسؤول عن جميع المواد والادوات في ساحة العمل ويكون مسؤول عن كل سرقة او نقص يحصل فيها مع ملاحظة ان جميع المواد في ساحة العمل تعتبر ملك للطائفة الاسرائيلية الى حين انتهاء العمل ولا يحق للمقاول رفعها او التصرف

” يتبع ” ⟦signature⟧

**Traduction anglaise —**

Secret tender for the construction of on the land numbered in district ⟦line⟧ General Conditions ⟦line⟧ 1- The bidder must submit cash securities of 5 percent, and these securities may be submitted in the form of a letter of guarantee from one of the banks to the Presidency of the Jewish Community in Baghdad. 2- The bidder must submit the contract documents in a sealed envelope at or before 12:00 PM of the day corresponding to 9 / 12 / 1957 to the Presidency of the Jewish Community in Baghdad, provided that it is written on the envelope (Secret tender for the construction of ) 3- The Community reserves the right not to accept the lowest-priced tenders and has the right to reject any tender without giving reasons for that. 4- Every tender that is not submitted at the time specified in paragraph (2) above or is not accompanied by the securities stipulated therein will be neglected. 5- The supervising engineer has the right to change the plans and quantities as he deems appropriate, and the contractor does not have the right to object to that, and the excess or deficient quantities shall be priced according to the contractor's price in the bill of quantities. 6- If the contractor delays in completing the work within the period specified by him, he must pay five dinars (5/- Dinars) daily to the Jewish Community in Baghdad, and any objection submitted by the contractor regarding his delay in work will be rejected, and these compensations will be deducted from his dues or securities. 7- When the quality of any material present in the bill of quantities is not mentioned, the supervising engineer alone will be responsible for choosing it as he deems appropriate, and the contractor has no right to object to that at all. 8- The contractor must indicate the period he needs to complete the work, and this period will be taken into consideration when studying the tender. 9- Bidders must sign all the maps attached to this tender as well as all pages of the tender and return them within their bid. 10- Materials ⟦line⟧ The contractor must supply all materials necessary for the work fixed in the plans and the price schedule, and the contractor alone shall be responsible for all materials and tools at the work site and shall be responsible for every theft or shortage that occurs therein, noting that all materials at the work site are considered property of the Jewish Community until the completion of the work, and the contractor has no right to remove or dispose of them. "Continued" ⟦signature⟧

---

### csp_404e687614175cb69d8eea5fb0224562

صحيفة ٢ ⟦line⟧

| المبلغ | السعر | الكمية والوحدة | تفاصيل الاعمــــــــــــــال | | ٢٥,٧٠٠ ٢٨,١٥٠ | ٠,١٠٠ | ٢٥٧ م٢ | ٧- صب كونكريت تحت الكاشي بسمك ٧ سم . يكون الكونكريت بنسبة ١-٣-٦ سمنت مع رمل الحبانية والحصى النهري المغسول ويكون الكونكريت مخلوط بالسيلوكريت كما جاء في الفقرة ( ٦ ) . | | ٢,١٠٠ | ٠,٠٥٠ | ٤٢ م.ط | ٨- بياض مانع الرطوبة مع السيلوكريت بسمك "١ للجد ران تكون نسبة المزج ١-٣ من السمنت ورمل الحبانية وتكون نسبة السيلوكريت ١-٨ من كمية الماء اللازم للمزيج . ان مستوى مانع الرطوبة هذا يقع بارتفاع خمسة سوف فوق مانع الرطوبة الكونكريتي الاول والبناء بين مانع الرطوبة الاول والثاني يكون بناء بالاسمنت بنسبة ١-٥ . | | ١٨٨,١٠٠ | ٤,٠٠٠ | ٤٧ م٣ | ٩- البناء بالطابوق المثقب والجص . يكون الطابوق من النوع الابيض المثقب من انتاج شركة المواد البنائية ويجب ان يكون الجص حار من انتاج المعامل الميكانيكية . واذا اتضح للمهندس المشرف من قبل الطائفة ان قسما من الجص قد تضرر من جراء ذلك فعلى المقاول ابعاده من موقع العمل وعدم استعماله لاى غرض من اغراض البناء . | | ٠٠,٨٠٠ | ٠,٤٠٠ | ٢ م٣ | ١٠- اعمال الدفن للارضيات بالتراب تجرى عمليات الدفن بطبقات سمكها لا يتجاوز الـ ٢٠ سم تدق جيدا بمدقات حديدية وتشبع بالماء بصورة كافية تكفل عدم هبوط الارضيات على ان يكون التراب نظيفا وخاليا من الاحجار ويكون القياس صافي لذا على المقاول حساب نسبة التقلص بعد الدق . | | ٨٠,٠٠٠ | ٢٠,٠٠٠ | ٤ م٣ | ١١- اعمال الخرسانة المسلحة تكون نسبة الخلط ١-٢-٤ من السمنت ورمل الحبانية والحصى النهري المغسول المتدرج الحجم من قياس " ٣/٤ فما دون وان تكون قضبان التسليح بموجب القياسات والابعاد في الخرائط المختصة ويشمل السعر ما يلزم من القوالب الخشبية . | | ٤٥,٢٠٠ ⟦line⟧ ٤٢٠,٨٠٥ | ٠,٤٠٠ | ١١٣ م٢ | ١٢- اعمال التقيير والتهوير والرشـق بالطين للسطوح أ ) توضع اولا على السقف مباشرة طبقة من القير لا يقل سمكها عن " ٣/٨ تمتد على جدران الستائر بارتفاع ٨ انجات على ان يكون القير من احسن " ويتبع " |

**Traduction anglaise —**

Page 2 ⟦line⟧ Amount | Price | Quantity and Unit | Details of Works 25,700 28.150 | 0.100 | 257 m2 | 7- Pouring concrete under the tiles with a thickness of 7 cm. The concrete shall be in a ratio of 1-3-6 cement with Habbaniya sand and washed river gravel, and the concrete shall be mixed with Sealocrete as stated in paragraph (6). 2.100 | 0.050 | 42 L.m | 8- Damp-proof plaster with Sealocrete with 1" thickness for walls The mixing ratio shall be 1-3 of cement and Habbaniya sand and the Sealocrete ratio shall be 1-8 of the amount of water required for the mix. This damp-proof level is located at a height of five courses above the first concrete damp-proof course and the masonry between the first and second damp-proof courses shall be cement masonry in a 1-5 ratio. 188.100 | 4.000 | 47 m3 | 9- Construction with perforated bricks and gypsum. The bricks shall be of the white perforated type produced by the Building Materials Company, and the gypsum must be hot produced by mechanical factories. If it becomes clear to the supervising engineer on behalf of the Community that a part of the gypsum has been damaged as a result of that, the contractor must remove it from the work site and not use it for any construction purposes. 00.800 | 0.400 | 2 m3 | 10- Backfilling works for floors with soil Backfilling operations are carried out in layers whose thickness does not exceed 20 cm, well-rammed with iron rammers and sufficiently saturated with water to ensure no settlement of the floors, provided that the soil is clean and free of stones, and the measurement shall be net therefore, the contractor must calculate the shrinkage ratio after ramming. 80.000 | 20.000 | 4 m3 | 11- Reinforced concrete works The mixing ratio shall be 1-2-4 of cement and Habbaniya sand and washed river gravel of graded size from 3/4" and below, and the reinforcement bars shall be according to the measurements and dimensions in the relevant maps, and the price includes the necessary wooden formwork. 45,200 ⟦line⟧ 420.805 | 0.400 | 113 m2 | 12- Bitumen coating, felting, and mud leveling for roofs a) First, a layer of bitumen no less than 3/8" thick is placed directly on the roof, extending over the parapet walls to a height of 8 inches, provided that the bitumen is of the best quality "To be followed"

---

### csp_43fdb3fdabad5707b5b74e5bc519b1fe

صحيفة ١٢ ⟦line⟧ الفقرة | تفاصيل الاعمال | الكمية والوحدة | السعر | المبلغ ١٧ | الابواب الخشبية تكون الاطارات من الخشب السويدى الجام الجيد الخالي من العقد والشقوق وحسب الابعاد والقياسات في الخرائط المختصة على ان تكون الاطارات ٢" في ٦" والفردات ٢" مكبوسة من الوجهين باجود انواع الخشب المعاكس على ان تكون الابواب مجهزة بيدات واقفال خفية ذات مفتاحين من اجود الانواع الاجنبية الموجودة في الاسواق المحلية . | ⟦illegible⟧ | ٥/٢٠٠ | ١٠٤/٠٠٠ ١٨ | التلبيط بالكاشي الموزائيك ومونة الاسمنت ١ = ٣ تجهيز مواد التلبيط للارضيات باحسن انواع الكاشي الموزائيك بحجم ٨ انج في ٨ انج ( واذا طلب غير هذا الحجم فيدفع الفرق | ⟦illegible⟧ | ٠/٧٠٠ | ٩٨/٠٠٠ ٣٠٠ ٥/٢٠٠ ١٠٤/٠٠٠ ٠/٤٤٠ ٤٤/٠٠٠ ١٤٠ م٢ ٠/٧٠٠ ٩٨/٠٠٠ تجهيز مواد التبليط للارضيات باحسن انواع الكاشي الموزائيك بحجم ٨ انج في ٨ انج ( واذا طلب غير هذا الحجم فيدفع الفرق للمقاول ) <del>ويخلط بمونة</del> الاسمنت والرمل بنسبة ١ = ٣ ويجب ان يكون التبليط مستويا ومثبتا بصورة قوية وبعد الانتهاء من التبليط يشربت وجه الكاشي بمونة الاسمنت الابيض الصافي . ويجب تغطية الموزائيك بالحصران او رمل الحبانية بسمك كافي للمحافظة على الموزائيك من التلوث بالصبغ . ويكون لون ونوعية الموزائيك حسب موافقة مهندس الطائفة المشرف على البناء . ١٩ عتبات الشبابيك من الموزائيك ويكون من النوع الممتاز وبالالوان التي يختارها المهندس المشرف بعرض حوالي ٢٠ سم. وتخرج حافته عن سطح الجدار بحوالي انج واحد . ١٤٠/٠٠٠ ⟦illegible⟧ ٢٠٠/٠٠٠ ٧٥٠٠٠ ٢٦١١/١٢٠ ⟦signature⟧

**Traduction anglaise —**

Page 12 ⟦line⟧ Item | Work Details | Quantity and Unit | Price | Amount 17 | Wooden Doors The frames shall be of good quality Swedish pine wood free of knots and cracks and according to the dimensions and measurements in the relevant drawings, provided that the frames are 2" by 6" and the leaves are 2" pressed on both sides with the best types of plywood, provided that the doors are equipped with handles and hidden locks with two keys of the best foreign types available in the local markets. | ⟦illegible⟧ | 5/200 | 104/000 18 | Tiling with mosaic tiles and cement mortar 1 = 3 Supplying tiling materials for floors with the best types of mosaic tiles in size 8 inches by 8 inches (and if another size is requested, the difference is paid | ⟦illegible⟧ | 0/700 | 98/000 300 5/200 104/000 0/440 44/000 140 m2 0/700 98/000 Supplying tiling materials for floors with the best types of mosaic tiles in size 8 inches by 8 inches (and if another size is requested, the difference is paid to the contractor) <del>and mixed with mortar</del> of cement and sand in a ratio 1 = 3 and the tiling must be level and fixed strongly, and after finishing the tiling, the face of the tiles shall be grouted with pure white cement mortar. And the mosaic must be covered with mats or Habbaniya sand with sufficient thickness to protect the mosaic from contamination by paint. The color and quality of the mosaic shall be according to the approval of the Sect's engineer supervising the construction. 19 Window sills made of mosaic And it shall be of excellent type and in colors chosen by the supervising engineer with a width of about 20 cm. Its edge shall protrude from the wall surface by about one inch. 140/000 ⟦illegible⟧ 200/000 75000 2611/120 ⟦signature⟧

---

### csp_45bd1ca115085ecb9914fa65a987cb63

صحيفة ١١

| الفقرة | تفاصيل الاعمال | الكمية والوحدة | السعر | المبلغ | | | تابع للفقرة ( ١٤ ) | | | | | | وان تكون اوجه البياض مستوية وصقيلة تماما . وبعد ذلك تصبغ الوجوه بالسيلوسم بثلاثة طبقات وبالالوان التي يختارها المهندس المشرف . | | | | | ١٥ | اعمال الشبابيك والهوائيات الحديدية | | ⟦٨٠٠٠⟧ | ⟦٤٣٠٠٠٠⟧ | | | تكون الشبابيك والهوائيات كما مبينة في الخرائط من انتاج شركة المنتوجات الهندسية العراقية ويجب ان تجهز كافة الشبابيك بيدة مع سلايد . ويجب ان تثبت كافة الشبابيك بشيش ٥/٨" وان يثبت فوق كافة الشبابيك من الخارج سلك مانع الذباب كما ويجب تجهيزها بزجاج قياس ٢ مليمتر يثبت بمعجون انكليزي يجهز ببراميل مختومة الى موقع العمل . وتكون الشبابيك بموجب التصاميم والحجوم التي يقدمها المهندس . | | | | | ١٦ | الابواب الحديدية | | ⟦٩٠٠٠⟧ | ⟦٧٥٢٠٠⟧ | | | تكون الابواب من الحديد الجديد بموجب القياسات والابعاد في الخرائط المختصة على ان تكون الاطارات حديد زاوية ٣" في ٣" في ١/٤" تثبت في الجدران بصورة جيدة والفردات حديد زاوية ٢" في ٢" في ١/٤" وبليت حديد من الخارج سمك ١/٨" على ان تكون الابواب مجهزة باقفال ويدات اجنبية . وتكون الابواب بليت من الوجهين . الا اذا كانت الابواب من الحديد والجام وعند ذلك يكون تقسيم الجام حسب الخرائط او التعليمات التي يقدمها المهندس المختص . | | | |

[Marginalia] رقم [Marginalia] ⟦illegible⟧

[Signature] ⟦signature⟧

٢٢/١/١٩٥٤

**Traduction anglaise —**

Page 11 Item | Work Details | Quantity and Unit | Price | Amount | Continued from Item (14) | | | | And the plaster surfaces must be completely level and smooth. After that, the faces are painted with Celosam in three coats and in the colors selected by the supervising engineer. | | | 15 | Iron windows and ventilators work | | ⟦8000⟧ | ⟦430000⟧ | The windows and ventilators shall be as shown in the blueprints produced by the Iraqi Engineering Products Company, and all windows must be equipped with a handle with a slide. All windows must be fixed with 5/8" rebar and a fly-proof mesh must be installed over all windows from the outside. They must also be equipped with 2mm glass fixed with English putty supplied in sealed drums to the work site. The windows shall be according to the designs and sizes provided by the engineer. | | | 16 | Iron Doors | | ⟦9000⟧ | ⟦75200⟧ | Doors shall be made of new iron according to the measurements and dimensions in the relevant blueprints, provided that the frames are 3" x 3" x 1/4" angle iron fixed well into the walls, and the leaves are 2" x 2" x 1/4" angle iron with 1/8" thick iron plate from the outside, provided that the doors are equipped with foreign locks and handles. The doors shall be double-faced iron plate. Except if the doors are made of iron and glass, in which case the glass division shall be according to the blueprints or instructions provided by the specialized engineer. | | | Number ⟦illegible⟧ ⟦signature⟧ 22/1/1954

---

### csp_4cba1685a4c35bf1bd76ce2600ab9bc9

B01 · header / arabic رئاسة ديوان الحاخام باشي في بغداد قسم الحسابات والاملاك العامة بغداد

B02 · marginalia / mixed رقم ⟦illegible⟧ ٢٦ حزيران سنة ١٩٦٦ ميلادية

B03 · header / arabic قسيمة قبض

B04 · table / arabic وصلنا من السيد اسحق قدوري مبلغا وقدره خمسة دنانير " " عن حصة ولده في المدرسة " " قسيمة رقم ⟦illegible⟧

B05 · paragraph / arabic نرجو التفضل بتسجيل مبلغ خمسة دنانير فقط لا غير لحساب المدرسة المذكورة في سجلاتكم وتزويدنا بالوصل الحسابي اللازم لغرض التدقيق واجراء اللازم مع الشكر والتقدير سلفا ولكم الامر هذا وقد استلمنا المبلغ المذكور بموجب وصلنا المرقم اعلاه لذا يرجى التفضل بتزويدنا بالوصل الحسابي اللازم لغرض التدقيق

B06 · signature / arabic المحاسب

B07 · footer / arabic حرر في بغداد في اليوم ⟦illegible⟧ منه ٢٦ / ١١ / ١٩٦٥ ميلادية الموافق لليوم

**Traduction anglaise —**

Presidency of the Hakham Bashi Diwan in Baghdad Department of Accounts and General Properties Baghdad Number ⟦illegible⟧ June 26, 1966 AD Receipt Voucher We received from Mr. Isaac Kadoorie an amount of five Dinars " " for his son's share in the school " " Voucher No. ⟦illegible⟧ Please be so kind as to record the amount of five Dinars only and nothing else to the account of the mentioned school in your records and provide us with the necessary accounting receipt for the purpose of auditing and taking the necessary action With thanks and appreciation in advance, and the matter is yours This is to confirm we have received the mentioned amount according to our receipt numbered above Therefore, please be so kind as to provide us with the necessary accounting receipt for the purpose of auditing Accountant Issued in Baghdad on the day ⟦illegible⟧ of it 11 / 26 / 1965 AD corresponding to the day

---

### csp_526fdc52341251fcaf54d12415e597ea

صحيفة ٤

ط ـ ـ او اذا اصبح المقاول ( سواء كان في العراق او في الخارج ) مفلسا او اذا قدم طلبا بالافلاس او ثبت عسره المالي او تصالح مع دائنيه او اذا كان المقاول شركة وجرت تصفيتها سواء أكانت التصفية جبرية ام اختيارية ( الا اذا كانت التصفية اختيارية بقصد اعادة تأليف الشركة على اسس مقررة كتابة من الحكومة ) او اذا كان المقاول شركة وجرى حلها او اذا اعطى المقاول او وعد او قدم هدية او سلفة او مكافئة او منفعة مهما كانت نوعها لاى موظف او عامل من موظفي الطائفة سواء أكان مستقلا او له اي علاقة بالعمل موضوع هذا العقد فللطائفة في اي حالة من هذه الاحوال ـ ـ

١ ـ ان تسحب من المقاول تنفيذ باقي الاعمال .

٢ ـ ويكون سحب تنفيذ باقي الاعمال طبقا لما ذكر آنفا بموجب ارسال انذار كتابي ⟦صادر⟧ من رئيس اللجنة الادارية للطائفة الاسرائيلية الى المقاول ويكون هذا الانذار صحيحا نافذ المفعول بدون اتخاذ اي اجراءات قانونية او رسمية .

٣ ـ واذا منح المقاول اي مهلة او تساهل فأن ذلك لا يقلل او يخل بحقوق الطائفة بمقتضى هذه المادة ولا تمس الاحكام السابقة بحق الطائفة في المطالبة بالتعويضات المقررة بمقتضى القوانين المرعية .

٤ ـ وفي حالة سحب العمل او جزء منه من المقاول طبقا لما سبق بيانه او طبقا لاى احكام اخرى واردة بالعقد للطائفة تبعا لتقديرها الكلفة ان تستعمل احد الحقوق الاتية ـ ـ

آ ـ ان تقوم بنفسها على حساب المقاول بتنفيذ جميع الاعمال التي لم تتم بعد او اى جزء منها .

ب ـ ـ ان تضع كل او بعض الاعمال التي لم تتم بعد في المناقصة من جديد .

ج ـ ـ ان تتفق مع احد المقاولين بصورة خصوصية لاتمام العمل . وفي كل هذه الاحوال يكون للطائفة الحق في حجز كل او بعض الآلات والادوات والمواد التي استحضرها المقاول وفي استعمالها في اتمام العمل وذلك بدون ان تكون مسؤولة لدى المقاول او غيره عن هذه الالات والادوات والمواد وعما يصيبها من تلف او نقص في القيمة لاى سبب ومن دون ان تكون مسؤولة ايضا عن دفع اى مبلغ يستحق عنها لفريق آخر او دفع اى اجر عنها للمقاول او لغيره

[Signature] ⟦توقيع⟧

**Traduction anglaise —**

Page 4 f -- or if the Contractor (whether in Iraq or abroad) becomes bankrupt or if he files a petition for bankruptcy or his financial insolvency is proven or if he reconciles with his creditors or if the Contractor is a company and it has been liquidated, whether the liquidation was mandatory or voluntary (unless the liquidation was voluntary for the purpose of reorganizing the company on foundations decided in writing by the government) or if the Contractor was a company and it was dissolved or if the Contractor gave, promised, or presented a gift or an advance, reward, or benefit of any kind to any employee or worker among the employees of the Community whether he was independent or had any relation to the work subject of this contract, the Community has in any case of these cases -- 1 - To withdraw the execution of the remaining works from the Contractor. 2 - The withdrawal of the execution of the remaining works shall be in accordance with what was mentioned above by sending a written notice ⟦issued⟧ by the President of the Administrative Committee of the Jewish Community to the Contractor and this notice shall be valid and effective without taking any legal or official procedures. 3 - If the Contractor is granted any grace period or indulgence, this shall not reduce or prejudice the rights of the Community according to this article, and the previous provisions do not affect the right of the Community to claim the compensations stipulated according to the laws in force. 4 - In the event of withdrawing the work or part of it from the Contractor according to what was previously explained or according to any other provisions contained in the contract, the Community has, according to its estimation of the cost, the right to exercise one of the following rights -- a - To carry out by itself at the Contractor's expense the execution of all the works that have not yet been completed or any part thereof. b -- To put all or some of the works that have not yet been completed into tender again. c -- To agree with one of the contractors in a private manner to complete the work. In all these cases, the Community shall have the right to seize all or some of the machinery, tools, and materials brought by the Contractor and to use them in completing the work without being responsible to the Contractor or others for these machines, tools, and materials, and for any damage or decrease in value that may occur to them for any reason, and without being responsible also for paying any amount due for them to another party or paying any wage for them to the Contractor or others. ⟦signature⟧

---

### csp_5892597e134557d0baddd34d385de072

صحيفة ٦

| المبلغ | السعر | الكمية / الوحدة | تفاصيــــــــــــــــــــل الاعمــــــــــــال | | ١٠٠٥,٩٢٥ ٢٢٧,٠٠٠ | ٢,٠٠٠ | ⟦٢٠٩,...⟧ | ٢٥ - السقــــــــــــوف تكون من نوع سقوف السيبرت الكونكريتية ملاحظــــــــة يطلب وضع سعر اذا كانت السقوف من العقادة مع العلم بأن الجسور الفولاذية ( الشيلمان ) المستعملة هي ٧ × ٤ للصنف الارضي مسافة ٧٥ سم من وسط الى وسط و ٦ × ٣ للطابق الثاني مسافة ٧٥ سم من وسط الى وسط وتقاس السقوف صافي الى من داخل الغرف لذا يجب على المتعهد اخذ ذلك بنظر الاعتبار . | | ٤٠,٠٠٠ | ٠,٨٠٠ | ⟦٥٠ م...⟧ | ٢٦ - البناء بالطابوق والجص للتيغ ( انظر مواصفات البناء بالطابوق ) . | | ٢٠,٠٠٠ | جملة | | ٢٧ - تنظيف البناية والموقع بعد اكمال العمل على المقاول تنظيف البناية وساحة العمل تنظيفا تاما بحيث تكون صالحة للاستعمال مباشرة قبل استلامها استلاما موقتا من قبل المهندس المشرف . | | ٨,٠٠٠ | ٢,٠٠٠ | ⟦٤ م⟧ | ٢٨ - بناء كف قيمة . يكون الطابوق منجور وبدرز بالسمنت الابيض بالطريقة التي يرتأيها المهندس المشرف . يوضع السعر لكل متر مربع بالاضافة الى البناء . | | ٢٦,٠٠٠ | ٢,٠٠٠ | ⟦١٣ م .⟧ | ٢٩ - اطار حول الشبابيك -- يبرز بمسافة ١٢ سم يكون من الكونكريت المسلح تسليح خفيف والخلط بنسبة ١-٢-٤ ويشمل السعر تصليحه بعد ذلك . ملاحظــــــــــة في جميع اعمال الكونكريت يجب ترك السطح ان كان ظاهرا بصورة جيدة اي انه يحسب حساب التصليح عند وضع الاسعـــــــار . |

[Marginalia] ١٤٢٦,٩٢٥

[Marginalia] فقط الف واربعمائة وستة وعشرون ديناراً [Marginalia] وتسعمائة وخمسة وعشرون فلساً [Marginalia] لا غير [Marginalia] المهندس المسؤول [Marginalia] ⟦signature⟧

٣٠ - الحجر : تكون ⟦على اسلوب ½⟧ مع صبغ خشب صاج " x ٢ " مصبوغ بالسبيرتو والدملوك واغمية من الشيشا " مربع كل نصف متر

**Traduction anglaise —**

Page 6 Amount | Price | Quantity / Unit | Details of Works 1005.925 227.000 | 2.000 | ⟦209,...⟧ | 25 - Ceilings to be of the Siporex concrete ceiling type Note A price is requested if the ceilings are of vaulted brick (Aqada) with the knowledge that the steel beams (I-beams) used are 7 x 4 for the ground class at a distance of 75 cm from center to center and 6 x 3 for the second floor at a distance of 75 cm from center to center, and ceilings are measured net from inside the rooms, so the contractor must take that into consideration. 40.000 | 0.800 | ⟦50 m...⟧ | 26 - Brick and gypsum masonry for partitions (see building specifications with brick). 20.000 | Lump sum | | 27 - Cleaning the building and site after completion of work The contractor must clean the building and the work site completely so that it is fit for direct use before provisional acceptance by the supervising engineer. 8.000 | 2.000 | ⟦4 m⟧ | 28 - Construction of a decorative cornice. The brick shall be dressed and pointed with white cement in the manner deemed appropriate by the supervising engineer. The price is set per square meter in addition to the masonry. 26.000 | 2.000 | 13 m. | 29 - Frame around windows -- protruding by 12 cm to be of lightly reinforced concrete mixing ratio 1-2-4 and the price includes its repair afterwards. Note In all concrete works, the surface must be left, if it is visible, in a good manner, meaning that the cost of repairs is accounted for when setting prices. 1426.925 Only one thousand four hundred twenty-six dinars and nine hundred twenty-five fils no more Responsible Engineer ⟦signature⟧ 30 - Stone: to be ⟦in the ½ style⟧ with teak wood paint " x 2 " painted with spirit and lacquer and covers of " square iron every half meter

---

### csp_6199183c32ba59a4b994fb39687f1275

B01 · paragraph / arabic 2 ⟦illegible⟧ ما ينص عليه ⟦illegible⟧ المادة (18) التي تنص "فاذا لم ينفذ المقاول او لم يرسل مندوباً عنه ⟦illegible⟧" وعليه ⟦illegible⟧ الطائفة سوف تتصرف في دفع ⟦illegible⟧ لكم ⟦illegible⟧ العمل ⟦illegible⟧ المادة 18 وليس هو (على الطائفة ان تمتنع عن صرف اي مبالغ تكون مستحقة له من ⟦illegible⟧ هذه النفقات والارباح) ان الطائفة ⟦illegible⟧ في ⟦illegible⟧ او ⟦illegible⟧ كل علاقة لكم في حالة عدم ⟦illegible⟧ المذكور حسب المادة 18 من الشروط العامة ان هذا الانذار لا يمنع الطائفة من التمسك بحقوقها بتقديمكم حصة ما تنص عليه المقاولة ⟦illegible⟧ الا ان امرها لكم بالعمل لا يعتبر ⟦illegible⟧ بحوزة العمل الذي ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧

**Traduction anglaise —**

2 ⟦illegible⟧ what is stipulated in ⟦illegible⟧ Article (18) which states "If the contractor does not execute or does not send a representative ⟦illegible⟧" And accordingly ⟦illegible⟧ the community will act in paying ⟦illegible⟧ to you ⟦illegible⟧ The work ⟦illegible⟧ Article 18 and it is not (The community must refrain from paying any amounts that may be due to him from ⟦illegible⟧ these expenses and profits) The community ⟦illegible⟧ in ⟦illegible⟧ or ⟦illegible⟧ all your relationship in case of non-⟦illegible⟧ mentioned according to Article 18 of the General Conditions This warning does not prevent the community from upholding its rights by your submission of a share what the contract stipulates ⟦illegible⟧ except that its order to you to work is not considered ⟦illegible⟧ in possession of the work which ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧

---

### csp_66dd16b4140e58dd94c23d11cb2d1d25

B01 · header / arabic ادارة المجلس الجسماني للطائفة الاسرائيلية بغداد

B02 · form / arabic الرقم: ١٣٤٨ التاريخ: ٢ تشرين الاول ٩٣١

B03 · header / arabic افتتاح المدارس الاسرائيلية ⟦line⟧

B04 · table / arabic مديرية مدارس الاليانس " مدرسة شماش " مدرسة راحيل شحمون " المدرسة الوطنية " مدرسة كنجي الكسرة " مدارس المدراش

B05 · paragraph / arabic يستدعى الدوام بكافة المدارس الاسرائيلية صباح الخميس القادم ٨ تشرين الاول ٩٣١ فنرجو اعداد مدارسكم لتكون جاهزة للافتتاح في اليوم المذكور .

B06 · signature / arabic رئيس المجلس الجسماني

B07 · marginalia / arabic اوامر تدريس

**Traduction anglaise —**

Administration of the Lay Council of the Israelite Community Baghdad Number: 1348 Date: 2 October 931 Opening of the Israelite Schools ⟦line⟧ Directorate of Alliance Schools " Shamash School " Rachel Shahmoon School " The National School " Ganji Al-Kasra School " Midrash Schools Attendance is requested in all Israelite schools next Thursday morning, 8 October 931, so please prepare your schools to be ready for opening on the mentioned day. President of the Lay Council Teaching Orders

---

### csp_699a34cbf00d529598042c75dd1c7d4d

(١) جدول الكميات والأسعار لذرعة البناية الجديدة في فرنك عيني

| المبلغ دينار | فلس | السعر دينار | فلس | الكمية والوصف | التفاصيل | | ٢٠ | ... | قطعي | - | ١- التخطيطات وتنظيف الساحة وتعديلها | | ١ | ٥٥٠ | - | ٢٥٠ | ٦,٢٠ م٣ | ٢- الحفريات | | ٢١ | ٠٠٩ | ٤ | ٧٠٠ | ٤,٤٧ م٣ | ٣- كونكريت مسلح للأسس | | ٦٧ | ٨٠٠ | ٤ | ... | ١٦,٩٥ م٣ | ٤- طابوق بالسمنت | | ٩ | ٧١٠ | ١ | ... | ٩,٧١ م٢ | ٥- رسافة مانع الرطوبة | | ٣ | ٩٠٥ | - | ٥٠٠ | ٧,٨١ م٢ | ٦- بياض مانع الرطوبة | | ٢٦٨ | ٤٤٠ | ٤ | ... | ٦٧,١١ م٣ | ٧- طابوق بالجص | | ٦٦ | ٥٧٦ | - | ٨٠٠ | ٨٣,١٧ م٢ | ٨- قواطع بالجص | | ١٠ | ٥٠٠ | ٢٠ | ... | ٧,٥٠ | ٩- كونكريت مسلح | | ٥٧ | ٠٨٨ | - | ٤٠٠ | ١٤٢,٧٢ م٢ | ١٠- تصوير وقير ورشقة | | ١٨ | ٦٨٤ | - | ٤٠٠ | ٢٤٦,٧١ م٢ | ١١- الدفن | | ٦ | ٢٢٠ | - | ٤٠٠ | ١٥,٨٠ م٢ | ١٢- البياض بالسمنت للمماشى | | ١٧٢ | ٩٩٢ | - | ٢٥٠ | ٢٨٦,٦٥ م٢ | ١٣- البياض بالجص والأسمنت | | ١٥ | ... | - | ٥٠٠ | ٣٠٠,٠٠ م٢ | ١٤- البياض بالسمنت للوجوه الخارجية مع الصبغ | | ٤ | ٢٥٦ | - | ١٢٠ | ٣٦٣,٢٠ م٢ | ١٥- الصبغ بالنوم | | ١٨١ | ٢٠٠ | ٨ | - | ٢٢,٦٥ م٢ | ١٦- الشبابيك الحديدية مع الاطارات (حذف سعر الاطار الخشبي والشبك والسلايد) | | ٤٠ | ٤٥٠ | ٥ | - | ٨,٠٩ م٢ | ١٧- ابواب خشبية | | ٣٣٥ | ... | ٣ | - | ١٤٥,٠٠ م٢ | ١٨- السقوف الكونكريتية | | ٦ | ٥٠٠ | ٣ | - | ٢,٥٠ م٢ | ١٩- اطارات كونكريت حول الشبابيك | | ٣ | ٦٠٠ | - | ٨٠٠ | ٤,٥٠ م٢ | ٢٠- كفادة | | ٤٧ | ... | - | ١٢٥ | ٣٧٦ كيلو | ٢١- شيلمان مع براغي وبليت | | ٥١ | ١٦٥ | ٢ | ٢٥٠ | ٢٢,٧٤ م.ط | ٢٢- مزاريب مياه المطر | | ٢٦ | ٦٧٠ | ٣ | ٥٠٠ | ٧,٦٢ م.ط | ٢٣- الحجر المريدي |

**Traduction anglaise —**

(1) Schedule of quantities and prices for the survey of the new building in Frank Aini Amount Dinar | Fils | Price Dinar | Fils | Quantity and Description | Details 20 | ... | Lump sum | - | 1- Planning, site cleaning, and leveling 1 | 550 | - | 250 | 6.20 m3 | 2- Excavations 21 | 009 | 4 | 700 | 4.47 m3 | 3- Reinforced concrete for foundations 67 | 800 | 4 | ... | 16.95 m3 | 4- Brickwork with cement 9 | 710 | 1 | ... | 9.71 m2 | 5- Damp-proof course (DPC) 3 | 905 | - | 500 | 7.81 m2 | 6- Damp-proof plastering 268 | 440 | 4 | ... | 67.11 m3 | 7- Brickwork with gypsum 66 | 576 | - | 800 | 83.17 m2 | 8- Partitions with gypsum 10 | 500 | 20 | ... | 7.50 | 9- Reinforced concrete 57 | 088 | - | 400 | 142.72 m2 | 10- Leveling, bitumen, and gravel 18 | 684 | - | 400 | 246.71 m2 | 11- Filling 6 | 220 | - | 400 | 15.80 m2 | 12- Cement plastering for walkways 172 | 992 | - | 250 | 286.65 m2 | 13- Gypsum and cement plastering 15 | ... | - | 500 | 300.00 m2 | 14- Cement plastering for exterior faces with painting 4 | 256 | - | 120 | 363.20 m2 | 15- Distemper painting 181 | 200 | 8 | - | 22.65 m2 | 16- Steel windows with frames (deleted price of wooden frame, mesh, and slide) 40 | 450 | 5 | - | 8.09 m2 | 17- Wooden doors 335 | ... | 3 | - | 145.00 m2 | 18- Concrete ceilings 6 | 500 | 3 | - | 2.50 m2 | 19- Concrete frames around windows 3 | 600 | - | 800 | 4.50 m2 | 20- Parapet/Coping 47 | ... | - | 125 | 376 kg | 21- I-beams with bolts and plates 51 | 165 | 2 | 250 | 22.74 m.l | 22- Rainwater gutters 26 | 670 | 3 | 500 | 7.62 m.l | 23- Al-Muraidi stone

---

### csp_6b5ea6a96cbf51039589c828897e2081

صحيفة ١٥

| الفقرة | تفاصيـ⟦line⟧ـل الاعمـ⟦line⟧ـال | الكمية والوحدة | السعر | المبلغ |

تابع للفقرة ( ٢٦ ) العمل والمواد واما الارتفاعات والتصميم والمقاييس فيمكن الاطلاع عليها من الخرائط الملحقة او لدى مهندس الطائفة او في دوائر الطائفة .

٢٧ التبليـ⟦line⟧ـط بالكاشي اللماع للحمامات ويكون الكاشي باللون والنوع والشكل الذى يختاره المهندس المختص ويكون من النوع الانكليزي والرصف على اعلى درجة من الاتقان ويجب ان يطلى ظهره بمادة الميكانيكي Sealocrete Mechanical keying liquid حسب مواصفات الشركة المنتجة وذلك لمنعه من السقوط بعد التطبيق .

٢٨ حفـ⟦line⟧ـر بالوعة بعمق حوالي ٣٠٠ ر ٣ م ٠ والقطر من الاسفل لا يقل عن ٢٥٠ ر ٢ م ٠ ويكون البناء بصورة جيدة باللين النظيف وتجهز بقبغ انكليزي قياس ١٨ " في ١٨ " .

ملاحظـ⟦line⟧ـة عند بناء السبتك تانك تحسب فقراته مفردة حسب الاسعار الموضوعة في جدول الكميـ⟦line⟧ـات من ناحية الحفر والبناء والبياض بالاسمنت الخ ....

[Signature] ⟦signature⟧

**Traduction anglaise —**

Page 15 Item | Details ⟦line⟧ of Work ⟦line⟧ | Quantity and Unit | Price | Amount Continuation of Item (26) Work and materials; as for heights, design, and measurements, they can be viewed from the attached maps or at the engineer of the sect or in the sect's departments. 27 Tiling ⟦line⟧ with glazed tiles for bathrooms The tile shall be in the color, type, and shape chosen by the specialized engineer, and it shall be of the English type. Paving shall be to the highest degree of perfection, and its back must be coated with Sealocrete Mechanical keying liquid according to the specifications of the manufacturing company to prevent it from falling after application. 28 Digging ⟦line⟧ a sinkhole to a depth of about 3.300 m and a diameter at the bottom of no less than 2.250 m. Construction shall be done well with clean bricks and equipped with an English cover measuring 18" by 18". Note ⟦line⟧ When building the septic tank, its items are calculated individually according to the prices set in the bill of quanti⟦line⟧ties in terms of excavation, construction, and cement plastering etc.... ⟦signature⟧

---

### csp_6e048f6da7955bd9b570c08ade95aa1c

صحيفة ٩

| الفقرة | تفاصيل الاعمال | الكمية والوحدة | السعر | المبلغ |

تابع للفقرة ( ١٠ ) مدة ٤٨ ساعة بعد صبها ومدة عشرة ايام للصبات الافقية . ويجب التأكد من قوة ومتانة القوالب اذ ان المقاول هو المسؤول الوحيد عن ذلك . واذا كانت الصبات الناتجة ليست مطابقة للخرائط او للفن الهندسي واصول البناء فالمقاول عند ذلك يكون مسؤول باصلاحها او رفعها وصبها مجددا حسب ما تقتضيه الضرورة .

[Marginalia] ⟦تشمل هذه الفقرة صب الكونكريت المسلح⟧ [Marginalia] ⟦للسياج مع بناء درج الدرجات وصقول وتصنيف⟧

١١ اعمال القير والتهوير

أ ) توضع اولا على السقف مباشرة طبقة من القير لا يقل سمكها عن ٣/٨" تمتد على جدران الستائر بارتفاع ٨ انجات على ان يكون القير من احسن انواع القير المحلي وان يضاف مقدار ١٥ بالمائة من القير السيالي اثناء حرق القير ولا يجوز استعمال النفط الاسود بتاتا في القير مع ملاحظة تراكب فرشة القير على السطوح بمقدار ٤ سم على الاقل فوق بعضها .

ب) تهوير السطوح بالتراب الناعم الذي تطابق نعومته رمل الحبائية وخلاف ذلك يجوز للمهندس المشرف رفضه . وتجرى اعمال التهوير بوضع التراب بطبقات لا تزيد على ٥ سم ترطب قليلا بالماء وتدق بمدقات يدوية على ان يكون معدل سمك التهوير ١٠ سم في الوسط و ١٥ سم قرب الستائر .

ج ) تقير السطوح مرة اخرى بطبقة لا يقل سمكها عن ٣/٨" مع ملاحظة ما جاء في الفقرة اعلاه .

[Marginalia] ١٤٠٠٠ [Marginalia] ٢٥٤٧٠٠ [Marginalia] ٤١٢٩٠٠ [Marginalia] ١٦٧٨,٢٨٠

[Signature] صالح يوسف

**Traduction anglaise —**

Page 9 Item | Work Details | Quantity and Unit | Price | Amount Continued from Item (10) Period of 48 hours after pouring and a period of ten days for horizontal slabs. It must be ensured that the molds are strong and durable, as the contractor is solely responsible for that. If the resulting castings do not conform to the maps or engineering art and construction principles, the contractor in that case is responsible for repairing them or removing them and pouring them again as necessity dictates. ⟦This item includes pouring reinforced concrete⟧ ⟦for the fence with building steps of the stairs and polishing and grading⟧ 11 Asphalt and leveling works A) First, a layer of asphalt not less than 3/8" thick is placed directly on the roof, extending to the parapet walls at a height of 8 inches, provided that the asphalt is of the best types of local asphalt and that an amount of 15 percent of liquid asphalt is added during the heating of the asphalt. It is not permissible to use crude oil at all in the asphalt, noting the overlap of the asphalt sheet on the surfaces by 4 cm at least over each other. B) Leveling the surfaces with fine soil whose fineness matches Al-Habbaniya sand, otherwise the supervising engineer may reject it. Leveling works are carried out by placing the soil in layers not exceeding 5 cm, slightly moistened with water and compacted with hand rammers, provided that the average thickness of leveling is 10 cm in the middle and 15 cm near the parapets. C) The surfaces are asphalted again with a layer not less than 3/8" thick, taking into account what was mentioned in the item above. 14000 254700 412900 1678,280 Saleh Yousef

---

### csp_73e2f7c42fe35e41b05a3c72335f7ec0

[Marginalia] ⟦٤٠⟧

صحيفة ٤

ج - أن تتفق مع احد المقاولين بصورة خصوصية لاتمام العمل . وفي كل هذه الاحوال يكون للطائفة الحق في حجز كل او بعض الآلات والادوات والمواد التي استحضرها المقاول وفي استعمالها في اتمام العمل وذلك بدون ان تكون مسؤولة لدى المقاول او غيره عن هذه الآلات والادوات والمواد وعما يصيبها من تلف او نقص في القيمة لاى سبب ومن دون ان تكون مسؤولة ايضا عن دفع اى مبلغ يستحق عنها لفريق آخر او دفع اى اجر عنها للمقاول او لغيره . ويكون للطائفة الحق على كل حال في حجز كل او بعض الآلات والادوات والمواد حتى بعد انتهاء العمل وذلك ضمانا لحقوقها ويجب على المقاول ان يدفع للطائفة كل ما تتكبده من النفقات في هذا السبيل زيادة عن قيمة العقد وعليه ان يعوضها عن كل الخسائر التي تتكبدها بسبب ذلك . وللطائفة ان تخصم قيمة النفقات والخسائر المشار اليها من مبلغ التأمينات او من طلبات المقاول او من اى مال يعود له اما اذا كلف العمل باقل من اسعار المقاولة فلا يرجع الفرق الى المقاول .

ولهذا الغرض يمكن للطائفة ان تمتنع عن صرف اى مبالغ تكون منحته له حتى يتم تسوية هذه النفقات والخسائر وللطائفة ان تبيع الآلات والادوات او المواد التي استحضرها المقاول من دون ان تكون مسؤولة عن اى خسارة تلحق به من جراء بيعها .

في حالة سحب العمل من المقاول ينظم كشف جرد عن الاشغال والمباني والادوات والمعدات والمواد التي تكون بموقع العمل وعن العمل الذي تم بحالة مرضية وذلك بمعرفة مهندس الطائفة المسؤول ويحصل هذا الجرد بحضور المقاول الذي يجب انذاره رسميا للحضور هو او مندوبه فاذا لم يحضر المقاول او لم يرسل مندوبا عنه فيجرى الجرد بغيابه .

ويثبت هذا الجرد بموجب محضر موقع عليه من قبل مهندس الطائفة والمقاول او من ينوب عنه فاذا قام اى خلاف او نزاع بشأن حالة العمل الموجود فيجب اثبات هذا الخلاف او النزاع وطبيعة المحضر المشار اليه .

**Traduction anglaise —**

⟦40⟧ Page 4 C - To agree with one of the contractors privately to complete the work. In all these cases, the Sect shall have the right to seize all or some of the machinery, tools, and materials brought by the contractor and to use them to complete the work without being responsible to the contractor or others for these machines, tools, and materials, nor for any damage or decrease in value that may occur to them for any reason, and without being responsible also for paying any amount due for them to another party or paying any fee for them to the contractor or others. The Sect shall have the right in any case to seize all or some of the machinery, tools, and materials even after the completion of the work as a guarantee for its rights. The contractor must pay the Sect all the expenses it incurs in this regard in excess of the contract value, and he must compensate it for all the losses it incurs because of that. The Sect may deduct the value of the expenses and losses referred to from the amount of insurance or from the contractor's claims or from any money belonging to him; however, if the work costs less than the contract prices, the difference shall not be returned to the contractor. For this purpose, the Sect may refrain from paying any amounts that have been granted to him until these expenses and losses are settled, and the Sect may sell the machinery, tools, or materials brought by the contractor without being responsible for any loss incurred by him as a result of their sale. In the event of withdrawing the work from the contractor, an inventory list shall be organized for the works, buildings, tools, equipment, and materials located at the work site, and for the work that has been completed in a satisfactory condition, by the knowledge of the responsible Sect engineer. This inventory shall be conducted in the presence of the contractor, who must be officially notified to attend, he or his representative. If the contractor does not attend or does not send a representative on his behalf, the inventory shall be conducted in his absence. This inventory shall be confirmed by a report signed by the Sect engineer and the contractor or his representative. If any dispute or conflict arises regarding the state of the existing work, this dispute or conflict and its nature must be recorded in the aforementioned report.

---

### csp_788e7a0ad7b25be09cbd88be9ace3223

B01 · header / arabic مناقصة سرية لانشاء ⟦line⟧ على الارض المرقمة ⟦line⟧ محلة رأس القرية

B02 · header / arabic استمارة المقاولة

B03 · form / arabic عقدت هذه المقاولة بين رئاسة الطائفة الاسرائيلية ( المعروفة فيما يلي بأسم الطائفة ) وبين توفيق علاوي المعروف فيما يلي بأسم المقاول الذي افاد لغرض هذه المقاولة بوجود محل له في بغداد الرشيد وبعنوانه هذا يعتبر ما يوجه اليه من كتب مسجلة او ما يسلم اليه باليد من انذارات واوامر وتعليمات توجيها وتسليما صحيحين .

B04 · paragraph / arabic المهندس او المهندسين ⟦line⟧ المهندس الذي يقوم بتنفيذ هذه المقاولة نيابة عن الطائفة هو المهندس صالح يوسف او اي مهندس او مهندسين آخرين تعينهم الطائفة كتابيا بهذه الصفة ويبلغ المقاول باسمائهم لتنفيذ العمل المنصوص عليه في هذه المقاولة . وقد وافق المقاول ايضا بهذا على ان يجهز - بموجب الاحكام والشروط المتضمنة فيها وفي المواصفات وجدول الاسعار والخرائط - المواد الانشائية المنصوص عليها في الشروط العامة وجميع العمال والمكائن والعدد والآلات والادوات والسكلات والحراس وكل ما هو ضروري او يجوز ان يكون ضروريا في الاعمال والخدمات المشمولة بهذه المقاولة وانجازها كاملة على اعلى درجة من الاتقان والصنعة في تنفيذ " اثار بناية الرشيد ⟦line⟧ " اعترف المقاول بأنه قد زار محل العمل واطلع اطلاعا تاما وبصورة دقيقة ومضبوطة على جميع الخرائط وعلى العمل الذي ينبغي القيام به بموجب هذه المقاولة كما وانه قد اطلع على ساحة العمل وموقع خزن المواد الانشائية والتأسيسات المائية .

B05 · form / arabic يوافق المقاول على القيام بإنشاء البناية المذكورة بموجب الخرائط المختصة الصادرة والتي قد يصدرها المهندس المشرف في المستقبل وجدول الاعمال والاسعار والشروط العامة والمواصفات الفنية كاملة من كافة الوجوه وذلك لقاء مبلغ اجمالي مقطوع قدره ٤٨٥٠ دينارا (كتابة) اربعة الاف وثماني مائة وخمسين دينارا ⟦line⟧ كما ويتعهد المقاول على اكمال هذا العمل خلال مدة ⟦line⟧ يوما اعتبارا من تاريخ توقيع العقد .

B06 · signature / arabic التوقيع/ رئيس اللجنة الادارية لرئاسة الطائفة الاسرائيلية ببغداد . شاهد ⟦line⟧ التاريخ ⟦line⟧ التوقيع / ⟦line⟧ شاهد ⟦line⟧ المقاول السيد ⟦line⟧ التاريخ ⟦line⟧

**Traduction anglaise —**

Secret tender for the construction of ⟦line⟧ on the land numbered ⟦line⟧ Ras al-Qarya neighborhood Contract Form This contract was concluded between the Presidency of the Jewish Community (hereinafter known as the Community) and Tawfiq Allawi, hereinafter known as the Contractor, who stated for the purpose of this contract that he has a place of business in Baghdad, Al-Rashid, and at this address any registered letters sent to him or warnings, orders, and instructions delivered to him by hand shall be considered validly directed and delivered. The Engineer or Engineers ⟦line⟧ The engineer who executes this contract on behalf of the Community is the engineer Saleh Yusuf or any other engineer or engineers appointed by the Community in writing in this capacity, and the Contractor shall be notified of their names to execute the work stipulated in this contract. And the Contractor has also agreed hereby to provide - in accordance with the terms and conditions contained herein and in the specifications, the schedule of prices, and the maps - the construction materials stipulated in the general conditions and all workers, machinery, equipment, tools, instruments, scaffolding, guards, and everything that is necessary or may be necessary for the works and services covered by this contract and to complete them fully to the highest degree of perfection and craftsmanship in the execution of "Remains of the Al-Rashid Building ⟦line⟧" The Contractor acknowledged that he has visited the work site and has fully, accurately, and precisely reviewed all the maps and the work to be performed under this contract, and that he has also reviewed the work area and the location for storing construction materials and water installations. The Contractor agrees to undertake the construction of the mentioned building according to the relevant issued maps and those that may be issued by the supervising engineer in the future, the schedule of works and prices, the general conditions, and the technical specifications complete in all respects, in exchange for a total lump sum of 4850 Dinars (in writing) four thousand eight hundred and fifty Dinars ⟦line⟧ The Contractor also undertakes to complete this work within a period of ⟦line⟧ days starting from the date of signing the contract. Signature/ President of the Administrative Committee of the Presidency of the Jewish Community in Baghdad. Witness ⟦line⟧ Date ⟦line⟧ Signature / ⟦line⟧ Witness ⟦line⟧ The Contractor Mr. ⟦line⟧ Date ⟦line⟧

---

### csp_79c2195da0f55176837de3a6c8bfb29a

رئاسة اللجنة الادارية للطائفة الاسرائيلية بغداد ⟦line⟧

العدد ١٩ / ١ التاريخ ٢٠ / ١ / ١٩٥٧

حضرة المقاول السيد ساسون شمعون المحترم

استنادا الى المقاولة المعقودة بين رئاسة اللجنة الادارية للطائفة الاسرائيلية ببغداد وبينكم ، تعهدتم باتمام العمل بمدة اقصاها شهرين ونتيجة للزيادة الحاصلة في البناء والتي لا تتعدى باية حال من الاحوال ٢٥ ٪ تكون مدة العقد لا تتجاوز ٧٥ يوما بينما مضى على البناء مدة تجاوز ال ١٠٠ يوم بموجب كتاب الطائفة المؤرخ ٣ / ١٠ / ٩٥٦ والمرقم م / ٣٦٥ / ٥٦ الذى يامركم فيه بالعمل وبما ان من حق الطائفة ان تستقطع من تاميناتكم ثلاثة دنانير يوميا حسب المادة ـ ٦٠ ـ من صحيفة الشروط العامة وليس لك عذر باى حال من الاحوال حسب نص المادة التي تنص ( وسوف يرفض اى اعتراض يقدم من قبل المقاول لتاخره بالعمل ) وخلافك مع مهندس الطائفة لا يبرر تخلفك او تأخرك حسب المادة الخامسة من نفس الصحيفة والتي تنص "ـ

للمهندس المشرف الحق في تبديل الخرائط والكميات حسب ما يراه مناسبا ولا يحق للمقاول الاعتراض على ذلك وان الكميات الزائدة والناقصة تسعر حسب سعر المقاول في جدول الكميات .

لذا فاللجنة الادارية تذكركم بموجب المادة السادسة من الصفحة الثانية من الشروط العامة التي تنص يتنازل الفريقان المتعاقدان عن توجيه الانذارات من احدهما الى الاخر بواسطة كاتب العدل في شؤون هذه المقاولة وكل انذار موجه من احد الفريقين ينبغي اما ان يسلم بعنوان الفريق الاخر او ان يرسل اليه بالبريد المسجل .

ان اللجنة الادارية تنذركم بموجب هذه المادة بالبدء بالعمل في تأريخ اقصاه يوم الثلاثاء الموافق ٢٢ / ١ / ١٩٥٧ وفي حالة عدم بدائكم بالتأريخ المذكور فقد تضطر الطائفة بأستعمال حقها حسب المادة ـ ١٨ ـ وتقوم هي باتمام العمل على حسابكم استنادا الى بنود تلك المادة .

فاذا لم تبدأوا في العمل في التأريخ المذكور فيرجى منكم الحضور يوم الثلاثاء من نفس التأريخ السابق مساء لاجراء الجرد اللازم حسب ما تنص المادة ـ ١٨ ـ وفي حالة عدم حضوركم او حضور من يمثلكم فسوف تضطر الطائفة الى القيام بالجرد اللازم حسب ما ينص عليه البند ج من المادة ـ ١٨ ـ التي تنص "ـ

فاذا لم يحضر المقاول او لم يرسل مندوبا ينوب عنه فيجرى الجرد بغيابه ونعلمكم بذلك بان الطائفة سوف تتوقف عن دفع مبلغ لكم الى حين اتمام العمل حسب ما تنص عليه المادة ـ ١٨ ـ والذى هو ( يمكن للطائفة ان تمتنع عن صرف اى مبالغ تكون مستحقة له حتى يتم تسوية هذه النفقات والخسائر ) ان الطائفة تمنعكم من رفع اية مواد او ادوات او اساكل عائدة لكم في حالة عدم بدائكم بالعمل في التأريخ المذكور حسب المادة ـ ١٨ ـ من الشروط العامة .

ان هذا الانذار لا يمنع الطائفة من التمسك بحقها بتغريمكم حسب ما تنص عليه المقاولة (٦) كما ان امرها لكم بالبدء بالعمل لا يعتبر اعترافا بجودة العمل الذى تم .

هذا وتفضلوا بقبول فائق الاحترام

[Signature] رئيس اللجنة الادارية

صورة منه الى :ـ ملف المقاول في الطائفة مدير مدرسة فرنك عيني مهندس الطائفة

**Traduction anglaise —**

Presidency of the Administrative Committee of the Jewish Community Baghdad ⟦line⟧ Number: 19 / 1 Date: 20 / 1 / 1957 Honorable Contractor, Mr. Sassoon Shamoun, Based on the contract concluded between the Presidency of the Administrative Committee of the Jewish Community in Baghdad and you, you undertook to complete the work within a maximum period of two months. As a result of the increase in construction which does not exceed 25% in any case, the contract period shall not exceed 75 days, whereas more than 100 days have passed since construction began according to the community’s letter dated 3 / 10 / 956 numbered M / 365 / 56, which orders you to work. Since it is the community's right to deduct three Dinars per day from your securities according to Article - 60 - of the General Conditions Page, and you have no excuse in any case according to the text of the article which states (and any objection submitted by the contractor for his delay in work shall be rejected). Your dispute with the community's engineer does not justify your default or delay according to the fifth article of the same page, which states: The supervising engineer has the right to change maps and quantities as he deems appropriate, and the contractor has no right to object to that, and surplus or deficient quantities shall be priced according to the contractor’s price in the bill of quantities. Therefore, the Administrative Committee reminds you, according to Article Six of the second page of the General Conditions, which states: The two contracting parties waive the serving of warnings from one to the other through a notary public regarding the affairs of this contract, and every warning directed from one of the parties must either be delivered to the address of the other party or sent to it by registered mail. The Administrative Committee warns you, according to this article, to start work at the latest on Tuesday, corresponding to 22 / 1 / 1957, and in the event that you do not start on the mentioned date, the community may be forced to exercise its right according to Article - 18 - and complete the work itself on your account based on the provisions of that article. If you do not start work on the mentioned date, please attend on Tuesday of the same previous date in the evening to conduct the necessary inventory as stipulated in Article - 18 -. In the event of your absence or the absence of whoever represents you, the community will be forced to conduct the necessary inventory as stipulated in Clause C of Article - 18 -, which states: If the contractor does not attend or does not send a representative to act on his behalf, the inventory shall be conducted in his absence. We inform you that the community will stop paying any amount to you until the completion of the work as stipulated in Article - 18 -, which is (the community may refrain from paying any amounts due to him until these expenses and losses are settled). The community prohibits you from removing any materials, tools, or scaffolding belonging to you in the event that you do not start work on the mentioned date according to Article - 18 - of the General Conditions. This warning does not prevent the community from adhering to its right to fine you as stipulated in the contract (6), nor does its order to you to start work constitute an admission of the quality of the work that has been completed. Please accept the highest respects. President of the Administrative Committee Copy to: Contractor's file in the community Director of Frank Iny School Community Engineer

---

### csp_7a5b0c769bb454a6972be692066f2180

صحيفة ١٣

| الفقرة | تفاصيـ⟦line⟧ـل الاعمـ⟦line⟧ـال | الكمية والوحدة | السعـ⟦line⟧ـر | المبلـغ | | ٢٠ | التبليط بالكاشي السادة ومونة الجص ويكون الكاشي من النوع الممتاز ويطبق باحسن انواع الجص ويشربت بالسمنت الابيض مع ملاحظة ما جاء في الفقرة ( ١٨ ) . | | -/٦٧٠ | ٨٨٧ ٦٠٠ | | ٢١ | الصبغ بالدهـ⟦line⟧ـان بعد اكمال العمل يكون صبغ الابواب والشبابيك مع اطاراتها بالدهان ثلاثة قوط وباللون الذى يقرره المهندس على ان يكون الصبغ الدهني من النوع السائل داخل براميل مختومة وان يكون معاد لا في الجودة لاصباغ الشركة الكيماوية البريطانية ( آى. سي . آى ) على ان يجرى الصبغ بالفرشاة . تحسب الشبابيك بوجه واحد . | | -/٢٢٠ | ٤٤ ... | | ٢٢ | الصبغ بالايمولشن ( Emulsion ) تجهيز الايمولشن من شركة ( آى. سي . آى ) بالالوان التي يختارها المهندس المشرف ثم القيام بالصبغ للجدران بعد تنظيفها ومسحها جيدا والطلاء بالفرشاة قاطين وللطائفة الحق بتجهيز صباغ خاص اذا ارتأت ضرورة لذلك وعند عدم موافقة مهندسها المشرف على نوعية الصبغ وطريقته . | | -/١٤٠ | ٢٥٤ ... | | ٢٣ | التأسيسات الكهربائية على المقاول القيام بكافة التأسيسات الكهربائية المطلوبة وتكون الاسلاك والانابيب والتأسيسات الكهربائية الاخرى من نوع جي . ئى . سي . وتكون النقطة كاملة من كافة الوجوه بضمنها المصباح والمظلة من الخزف . | | | |

[Signature] ⟦signature⟧

[Marginalia] ٢٩٩٦,٧٢٠

**Traduction anglaise —**

Page 13 Item | Details of the ⟦line⟧ works | Quantity and Unit | Pri⟦line⟧ce | Amou⟦line⟧nt 20 | Tiling with plain tiles and gypsum mortar | | | The tiles shall be of excellent quality, applied with the best | | | types of gypsum, and grouted with white cement, taking note of | | | what was stated in item (18). | | 670/- | 600 887 21 | Painting with o⟦line⟧il-based paint | | | After completing the work, doors and windows and their frames | | | shall be painted with three coats of oil-based paint in the color | | | decided by the engineer, provided that the oil paint is of the | | | liquid type inside sealed drums and is equivalent in quality | | | to the paints of the British Imperial Chemical Industries | | | (I.C.I.), provided that the painting is done by brush. | | | Windows are calculated on one side only. | | 220/- | ... 44 22 | Painting with Emulsion | | | Supply emulsion from (I.C.I.) company in colors selected | | | by the supervising engineer, then paint the walls after | | | cleaning and wiping them well, applying two coats by brush. | | | The Organization has the right to provide a special painter if | | | it deems it necessary and if its supervising engineer does not | | | approve the quality or method of painting. | | 140/- | ... 254 23 | Electrical Installations | | | The contractor shall perform all required electrical installations. | | | Wires, pipes, and other electrical fittings shall be of the | | | G.E.C. type. The point shall be complete in all respects, | | | including the lamp and the porcelain shade. | | | ⟦signature⟧ 2996.720

---

### csp_7c7286cc37535a9393795ef9a6e0e325

B01 · header / arabic صحيفة ٨

B02 · table / arabic الفقرة | تفاصيل الاعمال | الكمية والوحدة | السعر | المبلغ ٨ | تابع للفقرة ( ٧ ) الفقرة ( ٥ ) . البناء بالطابوق والجص يكون الطابوق من النوع الابيض من انتاج شركة المواد البنائية او من اى شركة يختارها المهندس بحيث يكون الطابوق من احسن الانواع الموجودة في الاسواق ويكون الجص جديد الحرق ومن انتاج المعامل الميكانيكية . وللمهندس الحق برفض الجص اذا ارتأى انه ليس من نوعية ممتازة وكذلك اذا اتضح للمهندس المشرف من قبل الطائفة ان قسما من الجص قد تضرر من جراء ذلك فعلى المقاول ابعاده من موقع العمل وعدم استعماله لاى غرض من اغراض البناء . ٩ | اعمال الدفن للارضيات بالتراب تجرى عمليات الدفن بطبقات سمكها لا يتجاوز ال ٢٠ سم تدق جيدا بمدقات حديدية وتشبع بالماء بصورة كافية تكفل عدم هبوط الارضيات على ان يكون التراب نظيفا وخاليا من الاحجار ويكون القياس صافي لذا على المقاول حساب نسبة التقلص بعد الدق . | ⟦...⟧/٢٥٠ | ٢٥ ⟦...⟧ ١٠ | اعمال الخرسانة المسلحة تكون نسبة الخلط ١ = ٢ = ٤ من السمنت ورمل الحبانية والحصى النهرى المغسول المتدرج الحجم من قياس " ٣/٤ فما دون وان تكون قضبان التسليح بموجب القياسات والابعاد في الخرائط المختصة ويشمل السعر ما يلزم من القوالب الخشبية . ويجب رش الخرسانة المسلحة لمدة لا تقل عن عشرة ايام باستمرار ويجب عدم فتح القوالب للصبات العمودية قبل مضي | ١٨ ٥٠٠ | ١٨٥ ٠٠٠

B03 · signature / arabic ⟦signature⟧

B04 · footer / arabic ١٦٢,٧٨٠

**Traduction anglaise —**

Page 8 Item | Details of Works | Quantity and Unit | Price | Amount 8 | Continuation of Item (7) Item (5). Brickwork and Plastering The bricks shall be of the white type produced by the Building Materials Company or from any company selected by the engineer so that the bricks are of the best types available in the markets. The plaster shall be freshly burnt and produced by mechanical factories. The engineer has the right to reject the plaster if he deems it is not of excellent quality, and also if it becomes clear to the supervising engineer on behalf of the community that a portion of the plaster has been damaged as a result, the contractor must remove it from the work site and not use it for any construction purposes. | | | 9 | Earth filling works for floors Filling operations are carried out in layers whose thickness does not exceed 20 cm, well-compacted with iron rammers and sufficiently saturated with water to ensure no subsidence of the floors, provided that the soil is clean and free of stones, and the measurement is net, therefore the contractor must calculate the shrinkage ratio after compaction. | | ⟦...⟧/250 | 25 ⟦...⟧ 10 | Reinforced concrete works The mixing ratio shall be 1:2:4 of cement, Habbaniya sand, and graded washed river gravel of size 3/4" and below, and the reinforcement bars shall be according to the measurements and dimensions in the relevant maps, and the price includes the necessary wooden formwork. The reinforced concrete must be sprayed for a period of no less than ten days continuously, and the formwork for vertical pours must not be opened before the lapse of | | 18 500 | 185 000 ⟦signature⟧ 162,780

---

### csp_7eda329a991856f2a987b53775c6922f

صحيفة ١٨

| المبلـغ | السعـر | الكمية والوحدة | تفاصيـ⟦line⟧ـل الاعمـ⟦line⟧ـال | الفقرة |

تابع للفقرة ( ز ) ارضية كل مانهول بمونة السمنت ورمل الحبانية لتسليط وصرف المياه القذرة بصورة جيدة . على ان تبيض اوجه الجدران من الداخل بمونة السمنت والرمل بنسبة ١ = ٣ . على المقاول تجهيز وتأسيس هذه الادوات والتأسيسات الصحية على ان تكون من اجود الانواع الموجودة في الاسواق وان يقوم بالعمل وفقا لارقى الطرق الفنية ويشمل السعر كافة ما يلزم من التأسيسات وانابيب المياه الحلوة والقذرة وما يلزم من العكوس والدراسك والتقاسيم والكليات والاقفال وانابيب التنفـس قطر ,, ٣ انجات للمراحيض على ان يأخذ المقاول بنظر الاعتبار ان سعره يشمل كذلك توصيل ومد انابيب المياه الحلوة الى السطح والى الطابق الارضي والاول . كما يشمل مد انابيب المياه القذرة ( ٢ هين قطر ٤ انجات ) الى خزانات المياه القذرة .

| ٤٨٠٠٠ | ١٥٠٠٠ | ٣,٢٠٠ | ٢٠ - مدخل باب الدار - حسب التصميم الذي يقدمه المهندس وهو من خشب الصاج | | | ٨٠٠٠٠ | ٨٠٠٠٠ | ١ طن | ٢١ - حديد شيلمان مصبوغ لشبابيك الابواب والشبابيك ويشمل الانكلاب كذلك | |

٤٠٨٥,١٧٢ المجموع ١٦٧,٤٢٩ يضاف ٤ ٪ مصروفات احتياطية غير منظورة contingencies ⟦...⟧ للطوارئ تصرف ٤٢٥٢,١٥٩ المجموع النهائي

**Traduction anglaise —**

Page 18 Amount | Price | Quantity and Unit | Details of ⟦line⟧ works ⟦line⟧ | Item Continuation of item (z) The floor of each manhole with cement mortar and Habaniya sand to direct and drain sewage water properly. Provided that the inner faces of the walls are plastered with mortar of cement and sand in a ratio of 1:3. The contractor must supply and install these tools and sanitary installations, provided they are of the highest quality types available in the markets, and the work must be performed according to the highest technical methods. The price includes all necessary installations, freshwater pipes, sewage pipes, and necessary elbows, brass fittings, tees, traps, valves, and ventilation pipes with a diameter of 3 inches for the toilets, provided that the contractor takes into account that his price also includes connecting and extending freshwater pipes to the roof and to the ground and first floors. It also includes extending sewage pipes (2 pieces of 4-inch diameter) to the sewage septic tanks. 48.000 | 15.000 | 3.200 | 20 - Entrance to the house door - according to the design provided by the engineer, made of teak wood | 80.000 | 80.000 | 1 Ton | 21 - Painted steel I-beams for door and window frames and includes the ⟦angle bars⟧ as well | 4085.172 Total 167.429 Add 4% unforeseen reserve expenses ⟦...⟧ for emergencies spent as contingencies 4252.159 Grand Total

---

### csp_7f3fc7e8b9185a15af500e235e92e8e1

B01 · header / arabic جدول الاعمال والاسعار لمقاولة انشاء صف ( طابق ارضي ) ومخزن ( طابق ثاني فوق بناء موجود )

B02 · table / mixed تفاصيل الاعمال | الكمية والوحدة | السعر | المبلغ ١ - تخطيط ارض الغرفة مع تهيئة سطح البناء الموجود لبناء طابق اخر فوقه . | جملة | ⟦line⟧ | ٢٠,٠٠٠ ٢ - الحفريات الترابية للاسس | ٣٨,٠٠ م٣ | ٠,٢٥٠ | ٩,٥٠٠

B03 · paragraph / arabic تكون الحفريات حسب ما جاء في الخرائط وتكون شاقولية والحافات والجوانب مستقيمة وقعر الحفر مستويا وموزونا . وترفع الاتربة الناتجة من الحفر خارج ساحة البناء واذا تجاوز المقاول الاعمال المؤشرة بالمخطط دون موافقة المهندس - التحريرية - فعليه ردم الحفريات الزائدة بالخرسانة ( ١-٣-٦ على حسابه الخاص .

B04 · table / mixed ٣ - اعمال الرصف بالطابوق الكسر | ٥٤,٠٠ م٢ | ٠,٢٠٠ | ١٠,٨٠٠

B05 · paragraph / arabic يكون طابوق الكسر من نوع المصخرج الصلب وبسمك ١٢ سم ويشمل السعر عملية الدق بالمدقات الحديدية بصورة جيدة والرش بالماء والتشريب بمونة الاسمنت بنسبة ( ١ - ٥ )

B06 · table / mixed ٤ - اعمال الخرسانة غير المسلحة للاسس | ٧,٧٥ م٣ | ٤,٧٠٠ | ١٢,٩٢٥

B07 · paragraph / arabic تكون نسبة الخرسانة ( ١-٣-٦ من السمنت ورمل الحبانية والحصى النهري المغسول المدرج الحجم ( ١ انج فما دون . ويجب ان يكون الرمل من مصادر بحيرة الحبانية ولا يجوز استعمال النهري اطلاقا في اي غرض من اغراض البناء الا بموافقة المهندس .

B08 · table / mixed ٥ - البناء بالطابوق والسمنت . | ٦,٠٠٠ م٣ | ٤,٠٠٠ | ٢٤,٠٠٠

B09 · paragraph / arabic يكون الطابوق من النوع المصخرج ويجري البناء بمونة الاسمنت ورمل الحبانية بنسبة ( ١-٥ وذلك من بداء صبة الكونكريت للاسس الى خمسة سوف فوق صبة البادلو . ولا يجوز استعمال طابوق المكسر او المستعمل ويغطس الطابوق المصخرج قبل البناء في الماء لمدة كافية لا تقل عن ستة ساعات وتملاء جميع المفاصل الشاقولية والافقية بمونة السمنت وتستمر عملية الرش بالماء للجدران مدة لا تقل عن سبعة ايام . يشمل السعر جميع ما ذكر اعلاه بصورة متقنة وجيدة ( ويحق لمهندس الطائفة رفض اي قسم من البناء لا يراه مطابقا للشروط الفنية او لسبب احتواه على املاح )

B10 · table / mixed ٦ - خرسانة مانع الرطوبة مع السيلوكريت بسمك ٣,, للجدران | ٨,٠٠ م.ط | ١,٠٠٠ | ٦,٢٠٠

B11 · paragraph / arabic تكون نسبة الخلط ( ١ - ٢ - ٤ من السمنت ورمل الحبانية والحصى النهري المغسول المتدرج الحجم من ٣/٤,, فما دون وتكون نسبة السيلوكريت ( ١ - ٥ من كمية الماء اللازم لعمل الخرسانة ويشمل السعر ما يلزم من القوالب الخشبية .

B12 · footer / arabic ,, يتبع ,,

B13 · marginalia / arabic ٨٥,٤٢٥

**Traduction anglaise —**

Schedule of Works and Prices For the contract of constructing a classroom (ground floor) and a store (second floor above an existing building) Details of Works | Quantity and Unit | Price | Amount 1 - Planning the room's ground with preparing the roof of the existing building to build another floor above it. | Lump sum | ⟦line⟧ | 20,000 2 - Earth excavations for foundations | 38.00 m3 | 0.250 | 9.500 Excavations shall be according to the maps and shall be vertical, edges and sides straight, and the bottom of the excavation level and balanced. The resulting soil from the excavation shall be removed outside the construction site, and if the contractor exceeds the works indicated in the plan without the engineer's - written - approval, he must fill the excess excavations with concrete (1-3-6) at his own expense. 3 - Paving works with broken bricks | 54.00 m2 | 0.200 | 10.800 The broken bricks shall be of the hard-fired type with a thickness of 12 cm. The price includes the process of pounding with iron rammers well, spraying with water, and grouting with cement mortar in a ratio of (1 - 5). 4 - Unreinforced concrete works for foundations | 7.75 m3 | 4.700 | 12.925 The concrete ratio shall be (1-3-6) of cement, Habbaniyah sand, and washed river gravel of graded size (1 inch and below). The sand must be from Habbaniyah Lake sources, and river sand may not be used at all for any construction purpose except with the engineer's approval. 5 - Building with bricks and cement. | 6.000 m3 | 4.000 | 24.000 The bricks shall be of the fired type, and construction shall be carried out with cement mortar and Habbaniyah sand in a ratio of (1-5) from the start of the concrete pouring for foundations up to five courses above the damp-proof course (DPC). It is not permissible to use broken or used bricks. The fired bricks shall be submerged in water before construction for a sufficient period of not less than six hours. All vertical and horizontal joints shall be filled with cement mortar, and the process of spraying the walls with water shall continue for a period of not less than seven days. The price includes all of the above in a professional and good manner (and the sect's engineer has the right to reject any part of the construction that he does not see as conforming to technical conditions or because it contains salts). 6 - Damp-proof concrete with Silocrete 3" thick for walls | 8.00 m.l | 1.000 | 6.200 The mixing ratio shall be (1 - 2 - 4) of cement, Habbaniyah sand, and washed river gravel of graded size from 3/4" and below. The Silocrete ratio shall be (1 - 5) of the amount of water required to make the concrete. The price includes the necessary wooden formwork. " To be continued " 85.425

---

### csp_82860eb0822b58c389154a2638b372f7

صحيفة ١٦

| الفقرة | تفاصيـــــــل الاعمــــــــــــــــال | الكمية والوحدة | السعر | المبلــــــــغ | | ٢٩ | التأسيسات الصحية | | | | | | أ - مرحاض فرفوري غربيـة :- | ⟦عدد⟧ / ١ | ١٧ ٠٠٠ | ١٧ ٠٠٠ | | | يجب ان يكون من اجود الانواع الموجودة في | ⟦عدد⟧ / ٢ | | | | | الاسواق مجهز بخزان ماء واطيء اى انه | | ٨ ٥٠٠ | ١٧ ٠٠٠ | | | يشتغل بواسطة عتلة بدون زنجير . ويجب | | | | | | ان يكون السيفون من النوع الذى يوافق | | | | | | عليه المهندس . وان يكون الغطاء من | | | | | | نوع بلاستيك ولا يجوز استعمال غطاء خشبي | | | | | | بتاتا . وعند تأسيس المرحاض يجب ايصال | | | | | | انبوب التصريف بقطر ( ٤ ) انجات الى | | | | | | المانهول او السبتك تانك حسب ما تتطلبه | | | | | | الضرورة مع تركيب انبوب تنفس قطر ٣ | | | | | | انجات ترتفع بمقدار ٥٠ سم فوق ستائر | | | | | | السطح . | | | | | | ب - مرحاض فرفوري شرقية | ⟦عدد⟧ / ١ | ١٢ ٥٠٠ | ١٢ ٥٠٠ | | | يجب ان تكون من احسن الانواع الموجودة | | | | | | في الاسواق مجهز بخزان ماء عالي اى | | | | | | انه يشتغل بالزنجير اما التنفس والاتصال | | | | | | بالمانهول او السبتيك تانك فيجب ملاحظة | | | | | | ما جاء في الفقرة السابقة . | | | | | | ج - مغسل فرفوري | ⟦عدد⟧ / ١ | ٩ ٠٠٠ | ٩ ٠٠٠ | | | يجب ان تكون من اجود الانواع الموجودة | | | | | | في الاسواق ومن قياس ٢٠ انج وان تكون | | | | | | مجهزة بحنفيتين من النوع المطلي وسيفون | | | | | | تراب . تربط الحنفيات بانبوب رصاصي | | | | | | وثم بانبوب قطر ١/٢ " ويوضع قفل على | | | |

[Signature] ⟦illegible signature⟧

٢٨٧٦,٧٢٠

**Traduction anglaise —**

Page 16 Item | Details of Works | Quantity and Unit | Price | Amount 29 | Sanitary Installations | | | | A - Porcelain Western Toilet :- | ⟦number⟧ / 1 | 17,000 | 17,000 | It must be of the best types available in the | ⟦number⟧ / 2 | | | markets, equipped with a low water tank, meaning it | | 8,500 | 17,000 | works by a lever without a chain. The | | | | siphon must be of the type approved by | | | | the engineer. The cover must be of | | | | plastic type; the use of a wooden cover is not | | | | allowed at all. When installing the toilet, the | | | | (4) inch diameter drainage pipe must be connected to | | | | the manhole or septic tank as required by | | | | necessity, with the installation of a 3-inch | | | | diameter vent pipe rising 50 cm above the | | | | roof parapets. | | | | B - Porcelain Eastern Toilet | ⟦number⟧ / 1 | 12,500 | 12,500 | It must be of the best types available | | | | in the markets, equipped with a high water tank, meaning | | | | it works with a chain. As for the vent and connection | | | | to the manhole or septic tank, the points mentioned | | | | in the previous paragraph must be observed. | | | | C - Porcelain Washbasin | ⟦number⟧ / 1 | 9,000 | 9,000 | It must be of the best types available | | | | in the markets, size 20 inches, and must be | | | | equipped with two plated-type faucets and a trap | | | | siphon. Faucets are connected with a lead pipe | | | | then with a 1/2" diameter pipe, and a valve is placed on | | | ⟦illegible signature⟧ 2876.720

---

### csp_8faa4fbf91665125939c93cd4c366035

رئاسة اللجنة الادارية للطائفة الاسرائيلية ببغداد ⟦line⟧

العدد ٣٠ / ٣٥ التاريخ ٢٠ / ١ / ٩٥٧

حضرة المقاول السيد ساسون شمعون المحترم

استنادا الى المقاولة المعقودة بين رئاسة اللجنة الادارية للطائفة الاسرائيلية ببغداد وبينكم ، تعهدتم باتمام العمل بمدة اقصاها شهرين وبنتيجة للزيادة الحاصلة في البناء والتي لاتتعدى باية حال من الاحوال ٢٥ ٪ تكون مدة العقد لاتتجاوز ٧٥ يوما بينما مضى على البناء مدة تجاوز ال ١٠٠ يوم بموجب كتاب الطائفة المؤرخ ٣ / ١٠ / ٩٥٦ والمرقم م / ٣٩٥ / ٥٦ الذى يامركم فيه بالعمل وبما ان من حق الطائفة ان تستقطع من تاميناتكم ثلاثة دنانير يوميا حسب المادة ـ ٦ ـ من صحيفة الشروط العامة وليس لك عذر باى حال من الاحوال حسب نفس المادة التي تنص ( وسوف يرفض اى اعتراض يقدم من قبل المقاول لتأخره بالعمل ) وخلافك مع مهندس الطائفة لا يبرر تخلفك او تأخرك حسب المادة الخامسة من نفس الصحيفة والتي تنص "ـ

للمهندس المشرف الحق في تبديل الخرائط والكميات حسب ما يراه مناسبا ولا يحق للمقاول الاعتراض على ذلك وان الكميات الزائدة والناقصة تسعر حسب سعر المقاول في جدول الكميات .

لذا فاللجنة الادارية تنذركم بموجب المادة السادسة من الصفحة الثانية من الشروط العامة التي تنص " يتنازل الفريقان المتعاقدان عن توجيه الانذارات من احدهما الى الاخر بواسطة كاتب العدل في شؤون هذه المقاولة وكل انذار موجه من احد الفريقين ينبغي اما ان يسلم بعنوان الفريق الاخر او ان يرسل اليه بالبريد المسجل" .

ان اللجنة الادارية تنذركم بموجب هذه المادة بالبداء بالعمل في تأريخ اقصاه يوم الثلاثاء الموافق ٢٢ / ١ / ١٩٥٧ وفي حالة عدم بداءكم بالتأريخ المذكور فقد تضطر الطائفة بأستعمال حقها حسب المادة ـ ١٨ ـ وتقوم هي باتمام العمل على حسابكم استنادا الى بنود تلك المادة .

فاذا لم تبداء في العمل في التأريخ المذكور فيرجى منكم الحضور يوم الثلاثاء من نفس التأريخ السابق مساء لاجراء الجرد اللازم حسب ما تنص المادة ـ ١٨ ـ وفي حالة عدم حضوركم او حضور من يمثلكم فسوف تضطر الطائفة الى القيام بالجرد اللازم حسب ما ينص عليه البند ج من المادة ـ ١٨ ـ التي تنص "ـ

فاذا لم يحضر المقاول او لم يرسل مندوبا ينوب عنه فيجرى الجرد بغيابه وتعلمكم بذلك بان الطائفة سوف تتوقف عن دفع اي مبلغ لكم الى حين اتمام العمل حسب ما تنص عليه المادة ـ ١٨ ـ والنص هو ( يمكن للطائفة ان تمتنع عن صرف اى مبالغ تكون مستحقة له حتى يتم تسوية هذه النفقات والخسائر ) ان الطائفة تمنعكم من رفع اية مواد او ادوات او اساكل عائدة لكم في حالة عدم بداءكم بالعمل في التأريخ المذكور حسب المادة ـ ١٨ ـ من الشروط العامة .

ان هذا الانذار لا يمنع الطائفة من التمسك بحقها بتغريمكم حسب ما تنص عليه المادة (٦) كما ان امرها لكم بالبداء بالعمل لا يعتبر اعترافا بجودة العمل الذى تم .

هذا وتفضلوا بقبولي فائق الاحترام

[Signature] رئيس اللجنة الادارية

صورة منه الى "ـ ملف المقاول في الطائفة مدير مدرسة فرنك عيني مهندس الطائفة

**Traduction anglaise —**

Presidency of the Administrative Committee Of the Jewish Community In Baghdad ⟦line⟧ Number 30 / 35 Date 20 / 1 / 957 To the esteemed contractor Mr. Sassoon Shamoun Based on the contract concluded between the Presidency of the Administrative Committee of the Jewish Community in Baghdad and yourselves, You undertook to complete the work within a maximum period of two months, and as a result of the increase occurring in the construction which does not exceed 25% in any case, The contract period shall not exceed 75 days, while more than 100 days have passed since the construction began according to the Community's letter dated 3 / 10 / 956 Numbered M / 395 / 56, which orders you to work. Since the Community has the right to deduct three Dinars daily from your security deposits according to Article - 6 - of the General Conditions sheet, and you have no excuse in any case according to the same article which states (Any objection submitted by the contractor for his delay in the work will be rejected). Your dispute with the Community's engineer does not justify your failure or delay according to the fifth article of the same sheet, which states "- The supervising engineer has the right to change the maps and quantities as he sees fit, and the contractor has no right to object to that, and the surplus or deficit quantities are priced according to the contractor's price in the bill of quantities. Therefore, the Administrative Committee warns you according to the sixth article of the second page of the General Conditions, which states "The two contracting parties waive the serving of warnings from one to the other via the Notary Public regarding the affairs of this contract, and every warning directed from one of the parties must either be delivered to the address of the other party or sent to it by registered mail." The Administrative Committee warns you according to this article to begin work at a date no later than Tuesday, corresponding to 22 / 1 / 1957, and in the event that you do not begin on the aforementioned date, the Community may be forced to exercise its right according to Article - 18 - and it will complete the work on your account based on the provisions of that article. If you do not begin work on the mentioned date, you are requested to attend on Tuesday of the same previous date in the evening to conduct the necessary inventory according to what is stated in Article - 18 - and in case you or your representative do not attend, the Community will be forced to conduct the necessary inventory according to what is stated in Clause C of Article - 18 - which states "- If the contractor does not attend or does not send a representative to act on his behalf, the inventory shall be conducted in his absence. We inform you that the Community will stop paying any amount to you until the work is completed according to what is stated in Article - 18 - and the text is (The Community may refrain from paying any amounts due to him until these expenses and losses are settled). The Community prevents you from removing any materials, tools, or scaffolding belonging to you in case you do not begin work on the mentioned date according to Article - 18 - of the General Conditions. This warning does not prevent the Community from upholding its right to fine you according to what is stated in Article (6), just as its order to you to start work is not considered an acknowledgment of the quality of the work that has been completed. Please accept my highest respect. President of the Administrative Committee A copy to "- The contractor's file in the Community The Director of Frank Iny School The Community's engineer

---

### csp_955e1c206c5f531691e84e5496042f28

صحيفة ١٥

| الفقرة | تفاصيــــــــــــــــــــل الاعمــــــــــــــــــــــــال | الكمية والوحدة | السعـــــر | المبلـــــغ | | ١٢ | انابيب مياه الامطــــــــــــــــار تكون الانابيب من الاهين بقطر ٤ انجات ويشمل كل انبوب عكس في السطح وقاعدة من الاهين او الكونكريت في الاسفل ويجب توصيل العكس بواسطة قطعة انبوب صغيرة الى حوض الكونكريت في السطح الذي يجب ان تكون ابعاده ٣٠ سم في ٣٠ سم في ٢٥ سم على ان يكون سطح الحوض بمستوى الرشق ونسبة الكونكريت ١ = ٢ = ٤ مع مادة السيلوكريت كما هو موصوف مع مانع الرطوبة. | ⟦...⟧ م.ط | ١ ٤٠٠ | ١٤٠ ٠٠٠ | | ١٣ | اللبخ بالاسمنت والبياض بالجص للجدران الداخلية تنظف الحلول اولا بصورة جيدة بين الطابوق ثم تطرطش بشربت السمنت ومن ثم تبيض بطبقة من السمنت ١ = ٣ واما الرمل فيكون متكون من ١ = ١ من رمل الحبانية والرمل النهري ويكون البياض بالمساطر والشاهول ثم يترك هذا اللبخ مدة سبعة ايام على الاقل يرش خلالها بالماء باستمرار ثم يترك مدة مناسبة ليجف . ثم يبيض بعدها بالجص المخمر الممتاز بطبقة سمكها لا يقل عن ١/٤ الانج على ان يكون الجص من مهدي قنبر آغا او شركة المواد البنائية العراقية - درجة اولى - ويجب ان يكون سطح البياض النهائي صقيل ومستوى تماما والاركان منتظمة التدوير . | ١٢٠٠ ⟦...⟧ | ٠/٢٤٠ | ٢٨٨ ٠٠٠ | | ١٤ | اللبخ بالاسمنت للاوجه الخارجية للبناية والصبغ بالسيلوسم تنظف الحلول اولا بصورة جيدة بين الطابوق وثم ترش بالماء وتطرطش بشربت السمنت ومن ثم تبيض بالسمنت ورمل الحبانية بنسبة ١ = ٣ وبسمك لا يقل عن " ٣/٤ على ان يجرى البياض بالمساطر والشاهول | ٨٥٠ ⟦...⟧ | ٠/٤٩٠ | ٤١٦ ٥٠٠ |

٢٠٤٦/٠٢٠

[Signature] ⟦صالح يوسف⟧

**Traduction anglaise —**

Page 15 Item | Details of Works | Quantity and Unit | Price | Amount 12 | Rainwater Pipes The pipes shall be of cast iron with a diameter of 4 inches and shall include each pipe an elbow at the roof and a base of cast iron or concrete at the bottom. The elbow must be connected via a small pipe piece to the concrete basin on the roof which must have dimensions of 30 cm by 30 cm by 25 cm, provided that the surface of the basin is at the level of the flashing and the concrete ratio 1:2:4 with Silocrete material as described with the damp proofing. | ⟦...⟧ L.M | 1.400 | 140.000 13 | Cement Plastering and Gypsum Whitewash for Internal Walls The joints are first cleaned thoroughly between the bricks then splashed with cement grout and then plastered with a layer of cement 1:3. As for the sand, it shall consist of 1:1 of Habbaniya sand and river sand, and the plastering shall be using rulers and plumb lines, then this plaster is left for a period of at least seven days, during which it is sprayed continuously with water then left for a suitable period to dry. Then it is whitewashed after that with excellent fermented gypsum with a thickness of no less than 1/4 inch, provided that the gypsum is from Mahdi Qanbar Agha or the Iraqi Building Materials Company - First Class - and the final whitewash surface must be polished and completely level and the corners regularly rounded. | 1200 ⟦...⟧ | 0/240 | 288.000 14 | Cement Plastering for External Faces of the Building and Painting with Celocem The joints are first cleaned thoroughly between the bricks and then sprayed with water and splashed with cement grout and then plastered with cement and Habbaniya sand in a ratio of 1:3 and a thickness of no less than 3/4" provided that the plastering is done with rulers and plumb lines | 850 ⟦...⟧ | 0/490 | 416.500 2046/020 ⟦Saleh Youssef⟧

---

### csp_9e383965a89e5651a5961ef7df8ec05c

اللجنة الادارية للطائفة الاسرائيلية في بغداد رقم التلفون ٥٤٥٢ ⟦line⟧

الرقم : ٥٦/٣٩٥/م التاريخ : ⟦١٩٥٦/١٠/٦⟧

خلاصة الموضوع : ⟦line⟧

الى :- المقاول السيد ساسون شمعون المحترم

بعد التحية استنادا الى كتابكم المؤرخ ١٩٥٦/١٠/٣ الذي تذكرون فيه استعدادكم بتنزيل ٥٪ من الاسعار التي قدمتموها الى رئاسة الطائفة ، نعلمكم بأن الطائفة وافقت على عرضكم لذا يجب عليكم الابتداء بالعمل اعتبارا من مدة اقصاها اربعة ايام من تأريخ هذا الكتاب استنادا الى شروط المقاولة . وان توقعوا استمارة المقاولة بأسرع وقت ممكن .

[Signature] ⟦signature⟧ [Signature] رئيس اللجنة الادارية

صورة منه الى :- مهندس رئاسة الطائفة - للعلم

**Traduction anglaise —**

Administrative Committee of the Jewish Community in Baghdad Telephone Number 5452 ⟦line⟧ Number: 56/395/M Date: ⟦1956/10/6⟧ Subject Summary: ⟦line⟧ To:- The Contractor, Mr. Sassoon Shamoon, Respectfully Greetings, Based on your letter dated 1956/10/3 in which you state your readiness to discount 5% from the prices you submitted to the Community Leadership, we inform you that the Community has accepted your offer. Therefore, you must begin work within a maximum period of four days from the date of this letter, based on the terms of the contract. And you are to sign the contract form as soon as possible. ⟦signature⟧ Chairman of the Administrative Committee Copy to:- Engineer of the Community Leadership - For information

---

### csp_a727d10158bf5c2f9ffc8d646c82ff54

صحيفة ٣

الصيانة على نفقته الخاصة وتعاد اليه التأمينات او ما تبقى منها بعد استقطاع المبالغ المترتبة عليه اصوليا عند نهاية مدة الصيانة وبعد ان يكون المقاول قد وفى التزاماته وتم استلام العمل منه نهائيا .

على المقاول ان يقوم بالاصلاحات التي تطلبها منه الطائفة خلال اسبوع من تاريخ تبليغه كتابة وعند تخلفه عن القيام بالعمل تقوم الطائفة بسحب التأمينات العائدة له اذا كانت بشكل كفالة مصرف وتقوم بالعمل على حسابه وتستقطع المبلغ منه .

١٦- الانذارات يتنازل الفريقان المتعاقدان عن حق توجيه الانذارات من احدهما الى الاخر بواسطة كاتب العدل في شؤون هذه المقاولة . وكل انذار موجهة من احد الفريقين ينبغي اما ان يسلم بعنوان الفريق الاخر او ان يرسل اليه بالبريد المسجل .

١٧- قوانين العمال المقاول مسؤول عن تطبيق قانون العمال فيما يتعلق بكافة شؤون العمال ومراعاتها بشأن اجور العطل الرسمية والاعياد والتعويضات كما وانه مسؤول عن الحوادث التي تقع لمستخدميه في محل العمل وعليه ان يدفع جميع التعويضات المترتبة على ذلك حيث ان الطائفة غير مسؤولة على الاطلاق فيما يتعلق بالعمال .

سحب العمل من المقاول وما يترتب عليه

أ - اذا عجز المقاول عن البدء بالعمل بسرعة لمجرد استلامه اخطارا كتابيا بذلك . ب - او اذا قصر في القيام بتنفيذ الاعمال بالسرعة المطلوبة . ج - او اذا عجز عن القيام بتنفيذ الاعمال بما يطابق العقد . د - او اذا تأخر في اكمال الاعمال عن الميعاد المحدد في العقد . هـ - او اذا اوقف العمل فعلا لمدة اسبوع بدون تصريح كتابي من الطائفة الا اذا اثبت وجود قوة قاهرة واخبر المهندس والطائفة بها فورا وكتابة . و - او اذا عجز عن توريد او تركيب آلات وعمال ومواد ومهمات كافية ومناسبة حتى يتمكن ان ينفذ العمل الدائم بسرعة وبدون انقطاع . ز - او اذا ارتكب بالذات او بالواسطة اية مخالفة لأي من نصوص المقاولة ملزم بتنفيذه او بملاحقته واستمر في هذه المخالفة مدة ١٤ يوما ( مع مراعاة اي شرط خاص ينص على مدة اقصر ) بعد انذاره كتابة من قبل المهندس باصلاح هذه المخالفة . ح - او اذا ترك العمل كليا .

[Signature] ⟦صالح يوسف⟧

**Traduction anglaise —**

Page 3 Maintenance at his own expense, and the insurances or what remains of them shall be returned to him after deducting the amounts duly owed by him at the end of the maintenance period and after the contractor has fulfilled his obligations and the work has been finally received from him. The contractor must carry out the repairs requested by the Sect within a week from the date of notifying him in writing. If he fails to perform the work, the Sect shall withdraw the insurances belonging to him if they are in the form of a bank guarantee, and perform the work at his expense and deduct the amount from him. 16- Notices The two contracting parties waive the right to send notices from one to the other through the notary public regarding the affairs of this contract. Every notice sent by one of the parties should either be delivered to the other party's address or sent to him by registered mail. 17- Labor Laws The contractor is responsible for applying the Labor Law regarding all labor matters and observing them regarding official holiday wages, feasts, and compensations, as he is also responsible for accidents that occur to his employees at the work site, and he must pay all compensations resulting therefrom as the Sect is not responsible at all regarding the workers. Withdrawal of work from the contractor and its consequences a - If the contractor fails to start work promptly upon receiving written notice to that effect. b - Or if he falls short in performing the execution of works at the required speed. c - Or if he fails to perform the execution of works in accordance with the contract. d - Or if he delays in completing the works beyond the deadline specified in the contract. e - Or if he actually stops work for a period of one week without written permission from the Sect, unless he proves the existence of force majeure and informs the engineer and the Sect of it immediately and in writing. f - Or if he fails to supply or install machinery, workers, materials, and equipment that are sufficient and appropriate so that he can execute the permanent work quickly and without interruption. g - Or if he commits, personally or through an intermediary, any violation of any of the contract provisions he is bound to implement or follow up on, and continues in this violation for a period of 14 days (taking into account any special condition stipulating a shorter period) after being warned in writing by the engineer to rectify this violation. h - Or if he abandons the work entirely. ⟦Salih Yusuf⟧

---

### csp_ab669c91efdd5b1cb7b211f5a5d1afbd

رئاسة اللجنة الادارية للطائفة الاسرائيلية بغداد

العدد ١٠ / . التاريخ = ٢٠ / ١ / ٩٥٧

حضرة المقاول السيد ساسون شمعون المحــــــــــــترم

استنادا الى المقاولة المعقودة بين رئاسة اللجنة الادارية للطائفة الاسرائيلية ببغداد وبينكم ، تعهدتم باتمام العمل بمدة اقصاها شهرين ونتيجة للزيادة الحاصلة في البناء والتي لاتتعدى باية حال من الاحوال ٢٥ ٪ تكون مدة العقد لاتتجاوز ٧٥ يوما بينما مضى على البناء مدة تجاوز ال ١٠٠ يوم بموجب كتاب الطائفة المؤرخ ٣ / ١٠ / ٩٥٦ والمرقم م / ٣٩٥ / ٥٦ الذى يامركم فيه بالعمل وبما ان من حق الطائفة ان تستقطع من تاميناتكم ثلاثة دنانير يوميا حسب المادة ـ ٦ ـ من صحيفة الشروط العامة وليس لك عذر باى حال من الاحوال حسب نفس المادة التي تنص ( وسوف يرفض اى اعتراض يقدم من قبل المقاول لتأخره بالعمل ) وخلافك مع مهندس الطائفة لا يبرر تخلفك او تأخرك حسب المادة الخامسة من نفس الصحيفة والتي تنص "ـ

للمهندس المشرف الحق في تبديل الخرائط والكميات حسب ما يراه مناسبا ولا يحق للمقاول الاعتراض على ذلك وان الكميات الزائدة والناقصة تسعر حسب سعر المقاول في جدول الكميــــــــــــات .

لذا فاللجنة الادارية تنذركم بموجب المادة السادسة من الصفحة الثانية من الشروط العامة التي تنــــــــــــص يتنازل الفريقان المتعاقدان عن توجيه الانذارات من احدهما الى الاخر بواسطة كاتب العدل في شؤون هذه المقاولــــــــــــة وكل انذار موجه من احد الفريقين ينبغي اما ان يسلم بعنوان الفريق الاخر او ان يرسل اليه بالبريد المسجل .

ان اللجنة الادارية تنذركم بموجب هذه المادة بالبدء بالعمل في تأريخ اقصاه يوم الثلاثاء الموافق ٢٢ / ١ / ١٩٥٧ وفي حالة عدم بدءكم بالتأريخ المذكور فقد تضطر الطائفة بأستعمال حقها حسب المادة ـ ١٨ ـ وتقوم هي باتمام العمل عـــــلى حسابكم استنادا الى بنود تلك المادة .

فاذا لم تبدء في العمل في التأريخ المذكور فيرجى منكم الحضور يوم الثلاثاء من نفس التأريخ السابق مساء لاجراء الجرد اللازم حسب ما تنص المادة ـ ١٨ ـ وفي حالة عدم حضوركم او حضور من يمثلكم فسوف تضطر الطائفة الى القيام بالجرد اللازم حسب ما ينص عليه البند ج من المادة ـ ١٨ ـ التي تنص "ـ

فاذا لم يحضر المقاول او لم يرسل مندوبا ⟦ينوب⟧ عنه فيجرى الجرد بغيابه ونعلمكم بذلك بان الطائفة سوف تتوقف عن دفع مبلغ لكم الى حين اتمام العمل حسب ما تنص عليه المادة ـ ١٨ ـ والغرض هو ( يمكن للطائفة ان تمتنع عن صرف اى مبالــــــــــــغ تكون مستحقة له حتى يتم تسوية هذه النفقات والخسائر ) ان الطائفة تمنعكم من رفع اية مواد او ادوات او اساكل عائــــــــــــدة لكم في حالة عدم بدءكم بالعمل في التأريخ المذكور حسب المادة ـ ١٨ ـ من الشروط العامة .

ان هذا الانذار لا يمنع الطائفة من التمسك بحقها بتغريمكم حسب ما تنص عليه المقاولة (٦) كما ان امرها لكم بالبدء بالعمل لا يعتبر اعترافا بجودة العمل الذى تم .

هذا وتفضلوا بقبول فائق الاحــــــــــــترام

[Signature] رئيس اللجنة الاداريــــــــــــة

صورة منه الى "ـ ملف المقاول في الطائفة مدير مدرسة فرنك عيني مهندس الطائفــــــــــــة

**Traduction anglaise —**

Presidency of the Administrative Committee of the Jewish Community Baghdad Number 10 / . Date = 20 / 1 / 957 The Respected Contractor Mr. Sasson Shamoun ⟦line⟧ Based on the contract concluded between the Presidency of the Administrative Committee of the Jewish Community in Baghdad and you, you undertook to complete the work within a maximum period of two months, and as a result of the increase occurring in the construction, which in no case exceeds 25% the duration of the contract shall not exceed 75 days, while more than 100 days have passed since the construction began, according to the Community's letter dated 3 / 10 / 956 numbered M / 395 / 56 which orders you to work. Since it is the right of the Community to deduct from your insurance three Dinars daily according to Article - 6 - of the General Conditions Page, and you have no excuse in any case according to the same article which states (Any objection submitted by the contractor for his delay in the work shall be rejected) and your disagreement with the Community's engineer does not justify your failure or delay according to the fifth article of the same page, which states "- The supervising engineer has the right to change the drawings and quantities as he sees fit, and the contractor has no right to object to that and the surplus or deficient quantities are priced according to the contractor's price in the Bill of Quantities ⟦line⟧. Therefore, the Administrative Committee warns you according to the sixth article of the second page of the General Conditions which states The two contracting parties waive the serving of warnings from one to the other through a Notary Public in matters of this contract ⟦line⟧ and every warning addressed by one of the parties must either be delivered to the address of the other party or sent to him by registered mail. The Administrative Committee warns you by virtue of this article to start the work at a date no later than Tuesday, corresponding to 22 / 1 / 1957, and in the event of your failure to start on the mentioned date, the Community may be forced to exercise its right according to Article - 18 - and will itself complete the work on ⟦line⟧ your account based on the provisions of that article. If you do not start work on the mentioned date, please attend on Tuesday evening of the same aforementioned date to conduct the necessary inventory as stipulated in Article - 18 - and in the event of your absence or the absence of your representative, the Community will be forced to conduct the necessary inventory as stipulated in Paragraph C of Article - 18 - which states "- If the contractor does not attend or does not send a representative to ⟦act on his behalf⟧, the inventory shall be conducted in his absence. We inform you that the Community will stop paying any amount to you until the completion of the work as stipulated in Article - 18 - and the purpose is (the Community may refrain from paying any sums ⟦line⟧ due to him until these expenses and losses are settled). The Community forbids you from removing any materials, tools, or scaffolding belonging ⟦line⟧ to you in the event of your failure to start work on the mentioned date according to Article - 18 - of the General Conditions. This warning does not prevent the Community from upholding its right to fine you as stipulated in the contract (6), just as its order to you to start work is not considered an admission of the quality of the work completed. Please accept our utmost respect ⟦line⟧ Head of the Administrative Committee ⟦line⟧ Copy to "- Contractor's file in the Community Director of Frank Iny School Community Engineer ⟦line⟧

---

### csp_b0bae82b1c8050d49f1c5f44d884e3e7

سعادة رئيس اللجنة الادارية المحترم تحية واحتراماً

الحاقاً بالاسعار التي قدمتها في يوم ٢٠ / ٩ / ١٩٥٦ اني مستعد لتخفيض الاسعار بنسبة ٥ ٪ بنفس الشروط المذكورة في وثائق المقاولة وذلك رغبة مني في خدمة الطائفة

[Signature] المهندس [Signature] سلمان كوهين [Signature] ⟦signature⟧ [Signature] ٢ / ١٠ / ١٩٥٦

[Stamp] ⟦illegible⟧

**Traduction anglaise —**

His Excellency the Chairman of the Administrative Committee, respected Greetings and respect, Further to the prices I submitted on September 20, 1956, I am prepared to reduce the prices by 5% under the same conditions mentioned in the contract documents, out of my desire to serve the community. The Engineer Salman Cohen ⟦signature⟧ October 2, 1956 ⟦illegible⟧

---

### csp_b168b178150a518e99039571e569638c

RAHEL SHAHMOON SCHOOL مدرسة راحيل شحمون

No.: ٧٦ العدد: ٧٦ Baghdad: بغداد في: ٦ كانون الاول ١٩٣١

حضرة رئيس المجلس الجسماني المحترم

تحية واحتراما

لاحظنا منذ مدة ان عدد الغائبين باجازة او بدونها في جميع الصفوف يزداد يوم الاحد بعد الظهر وقد فتشنا عن السبب وحصلنا قناعة تامة انه ناشئ عن التحاق طلاب مدارسنا اخوانهم واخواتهم الذين في بقية المدارس الطائفية وعندما اردنا ان نمنع هؤلاء الطلاب من التغيب بوسائط عديدة لم ننجح لذلك قررنا ان نجعل عدد الدروس يوم الاحد ست وعدد دروس يوم الجمعة ⟦اربعة⟧ كما هو رتب في جميع المدارس الطائفة للذكور وللاناث وقد اقتضى اخبار مجلسكم الموقر بذلك ونرجو ان تقبلوا احتراماتنا الفائقة ودمتم

[Signature] | مخلصكم | مخلصكم | مخلصكم | [Signature] | مدير مدرسة مسعودة سلمان | مدير مدرسة راحيل شحمون | مدير مدرسة ⟦الوطنية⟧ |

[Stamp] ادارة المجلس الجسماني -- بغداد [Stamp] العدد ١١٩٥ [Stamp] التاريخ ٧ / ١٢ / ١٩٣١ [Stamp] رقم الاضبارة ________

[Marginalia] صورة في ملفة الترتيب اعلاه

[Signature] ⟦signature⟧ [Signature] ١٦ / ١٢ / ٩٣١

**Traduction anglaise —**

RAHEL SHAHMOON SCHOOL Rahel Shahmoon School No.: 76 Number: 76 Baghdad: Baghdad on: December 6, 1931 The Honorable President of the Lay Council Greetings and respect We have noticed for some time that the number of absentees with or without leave in all classes increases on Sunday afternoons, and we have investigated the cause and reached a full conviction that it stems from our students joining their brothers and sisters who are in other sectarian schools And when we tried to prevent these students from being absent through various means, we did not succeed, therefore we decided to make the number of lessons on Sunday six and the number of lessons on Friday ⟦four⟧ as it is arranged in all the sectarian schools for boys and girls, and it was necessary to inform your esteemed council of that, and we hope you accept our highest respects, sincerely Yours faithfully | Yours faithfully | Yours faithfully Principal of Masouda Salman School | Principal of Rahel Shahmoon School | Principal of ⟦National⟧ School Administration of the Lay Council -- Baghdad Number 1195 Date 7 / 12 / 1931 File number ⟦line⟧ A copy in its file regarding the above arrangement ⟦signature⟧ 16 / 12 / 931

---

### csp_beb245ada83c5b3394f2fd161f6a02db

⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦line⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ للمحاسب ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦line⟧ ⟦illegible⟧ ⟦line⟧ ⟦illegible⟧

**Traduction anglaise —**

⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦line⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ For the accountant ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦line⟧ ⟦illegible⟧ ⟦line⟧ ⟦illegible⟧

---

### csp_c40531787aa75b95bdfc82c6c55d8a72

ادارة المجلس الجسماني للطائفة الاسرائيلية بغداد

الرقم: ٢٢٨٩ التاريخ: ٨ تشرين الثاني ٩٣٣

دروس لا منهجية

الى مديرية مدارس الاليانس " " مدرسة شماش " " مدرسة راحيل شحمون " " المدرسة الوطنية

لقد تطوع الشاب النابه الياهو افندي سميره بتدريب بعض تلامذة مدارسكم على فن الالقاء والخطابة والتمثيل ولما كنا نقدر لهذا الشاب براعته في هذه الفنون ونقدر كذلك ما لهذه الفنون من الفوائد .

فنرجو اعلان ذلك في مدرستكم وتسجيل من لهم ميل واستعداد لتلقي هذه التداريب باعتبارها دروسا لا منهجية وتقديم اسماء التلاميذ الينا للنظر في الامر .

[Signature] نائب الرئيس

صورة منه الى الياهو افندي سميره بالاشارة الى كتابه المؤرخ ٩٣٣/١١/٥

**Traduction anglaise —**

Administration of the Lay Council of the Israelite Community Baghdad Number: 2289 Date: November 8, 933 Extracurricular Lessons To the Director of the Alliance Schools " " Shamash School " " Rachel Shahmoon School " " The National School The intelligent young man, Eliyahu Effendi Samira, has volunteered to train some of your school students in the art of recitation, oratory, and acting. As we appreciate this young man's proficiency in these arts and also recognize the benefits of these arts. We request you to announce this in your school and register those who have an inclination and readiness to receive these trainings as extracurricular lessons and submit the names of the students to us for consideration of the matter. Vice President A copy thereof to Eliyahu Effendi Samira With reference to his letter dated 11/5/933

---

### csp_d0dece6eaf1955e1ab6299f5da043434

مناقصة سرية لانشاء صف ومخزن لمدرسة فرنك عيني ببغداد

الشروط العامة

١- على المناقص تقديم تأمينات نقدية قدرها -/٣٠ دينار ويجوز تقديم هذه التأمينات على شكل كتاب ضمان من احد المصارف الى رئاسة الطائفة الاسرائيلية ببغداد .

٢- على المناقص تقديم وثائق المقاولة بغلاف مختوم في او قبل الساعة ١٢ زوالية من الموافق ٢٠ / ٩ / ١٩٥٦ الى رئاسة الطائفة الاسرائيلية ببغداد على ان يكتب على الغلاف ( مناقصة سرية لانشاء صف ومخزن لمدرسة فرنك عيني ببغداد ) .

٣- تحتفظ الطائفة بحق عدم قبول اوطأ المناقصات سعرا ولها ان ترفض اية مناقصة بدون اعطاء اسباب لذلك .

٤- كل مناقصة لا تقدم في الموعد المعين في الفقرة ( ٢ ) اعلاه او لا تكون مرفقة بالتأمينات المنصوص عليها سيكون نصيبها الاهمال .

٥- للمهندس المشرف الحق في تبديل الخرائط والكميات حسب ما يراه مناسبا ولا يحق للمقاول الاعتراض على ذلك وان الكميات الزائدة والناقصة تسعر حسب سعر المقاول في جدول الكميات .

٦- اذا تاخر المقاول في انجاز العمل ضمن المدة المعينة من قبله عليه ان يدفع ثلاثة دنانير ( ٣ دنانير ) يوميا للطائفة الاسرائيلية ببغداد وسوف يرفض اي اعتراض يقدم من قبل المقاول لتأخره بالعمل وتستقطع هذه التعويضات من استحقاقه او تأميناته .

٧- عند عدم ذكر نوعية اية مادة موجودة في جدول الكميات سيكون المهندس المشرف وحده مسؤولا باختيارها حسب ما يراه مناسبا ولا يحق للمقاول الاعتراض على ذلك مطلقا .

٨- على المقاول ان يبين المدة التي يحتاجها لانجاز العمل وان هذه المدة ستؤخذ بنظر الاعتبار عند دراسة المناقصة .

٩- على المناقصين التوقيع على كافة الخرائط المرفقة مع هذه المناقصة وكذلك جميع صفحات المناقصة واعادتها ضمن عطائهم .

١٠- المواد على المقاول تجهيز كافة المواد اللازمة للعمل والمثبتة في الخرائط وجدول الاسعار ويكون المقاول وحده مسؤول عن جميع المواد والادوات في ساحة العمل ويكون مسؤول عن كل سرقة او نقص يحصل فيها مع ملاحظة ان جميع المواد في ساحة العمل تعتبر ملك للطائفة الاسرائيلية الى حين انتهاء العمل ولا يحق للمقاول رفعها او التصرف فيها الا بموافقة الطائفة الاسرائيلية الخطية .

١١- طرد مستخدمي المقاول للمهندس صلاحية تامة لان يطلب من المقاول طرد او اقصاء اي كان من مستخدميه عمن ترى الطائفة عدم مرغوبية وصلاحية استمرارهم في العمل وعلى المقاول ان ينفذ تلك الطلبات فور صدورها ولا يحق له المطالبة باي تعويض او تضمين قد يترتب على ذلك باي شكل كان .

١٢- السلفيات تدفع الطائفة سلفات نقدية في نهاية كل شهر عن الاعمال المنجزة والمواد المجهزة في موقع العمل بعد استحصال شهادة من المهندس بذلك وذلك على اساس ٩٠ بالمائة من كلفة الاعمال المنجزة بموجب اسعار المقاولة و ٧٥ بالمائة من قيمة المواد الانشائية المجهزة في

,, يتبع ,,

**Traduction anglaise —**

Secret tender for the construction of a classroom and a warehouse for the Frank Iny School in Baghdad General Conditions 1- The bidder must submit cash security in the amount of -/30 Dinars, and this security may be submitted in the form of a letter of guarantee from a bank to the Presidency of the Jewish Community in Baghdad. 2- The bidder must submit the contract documents in a sealed envelope at or before 12:00 PM on corresponding to 20/9/1956 to the Presidency of the Jewish Community in Baghdad, provided that it is written on the envelope (Secret tender for the construction of a classroom and a warehouse for the Frank Iny School in Baghdad). 3- The Community reserves the right not to accept the lowest-priced tenders and has the right to reject any tender without giving reasons for doing so. 4- Any tender not submitted at the time specified in paragraph (2) above or not accompanied by the specified security will be subject to neglect. 5- The supervising engineer has the right to change the drawings and quantities as he deems appropriate, and the contractor has no right to object to that, and the excess and deficient quantities shall be priced according to the contractor's price in the bill of quantities. 6- If the contractor delays in completing the work within the period specified by him, he must pay three Dinars (3 Dinars) daily to the Jewish Community in Baghdad, and any objection submitted by the contractor regarding the delay in work will be rejected, and these compensations will be deducted from his entitlements or security deposit. 7- When the quality of any material present in the bill of quantities is not mentioned, the supervising engineer alone will be responsible for choosing it as he deems appropriate, and the contractor has absolutely no right to object to that. 8- The contractor must specify the period he needs to complete the work, and this period will be taken into consideration when studying the tender. 9- Bidders must sign all the drawings attached to this tender as well as all pages of the tender and return them within their bid. 10- Materials The contractor must provide all materials necessary for the work and fixed in the drawings and the price schedule, and the contractor alone is responsible for all materials and tools at the work site and is responsible for every theft or deficiency that occurs therein, noting that all materials at the work site are considered property of the Jewish Community until the completion of the work, and the contractor has no right to remove or dispose of them except with the written approval of the Jewish Community. 11- Dismissal of the contractor's employees The engineer has full authority to request that the contractor dismiss or exclude any of his employees whom the Community deems undesirable or unsuitable for continuing in the work, and the contractor must implement those requests immediately upon their issuance, and he has no right to claim any compensation or indemnity that may result from that in any form whatsoever. 12- Advances The Community pays cash advances at the end of each month for completed works and materials supplied at the site of work after obtaining a certificate from the engineer to that effect, on the basis of 90 percent of the cost of completed works according to contract prices and 75 percent of the value of construction materials supplied at ,, Continued ,,

---

### csp_d1fed61d69625bf180e0270a1c8eec01

رئاسة اللجنة الادارية للطائفة الاسرائيلية بغداد ⟦line⟧

العدد ⟦illegible⟧ / ١ التأريخ ٢٠ / ١ / ١٩٥٧

حضرة المقاول السيد ساسون شوحيط المحترم

استنادا الى المقاولة المعقودة بين رئاسة اللجنة الادارية للطائفة الاسرائيلية ببغداد وبينكم ، تعهدتم باتمام العمل بمدة اقصاها شهرين ونتيجة للزيادة الحاصلة في البناء والتي لا تتعدى باية حال من الاحوال ٢٥ ٪ تكون مدة العقد لا تتجاوز ٧٥ يوما بينما مضى على البناء مدة تجاوز ال ١٠٠ يوم بموجب كتاب الطائفة المؤرخ ١٩٥٦/١٠/٣ والمرقم م/٥٦/٣١٥ الذى يامركم فيه بالعمل وبما ان من حق الطائفة ان تستقطع من تأميناتكم ثلاثة دنانير يوميا حسب المادة ـ ٦٠ ـ من صحيفة الشروط العامة وليس لك عذر بأى حال من الاحوال حسب نص المادة التي تنص ( وسوف لا يقرأى اعتراض يقدم من قبل المقاول لتأخره بالعمل ) وخلافك مع مهندس الطائفة لا يبرر مماطلتك او تأخرك حسب المادة الخامسة من نفس الصحيفة والتي تنص :ـ

للمهندس المشرف الحق في تعديل الخرائط والكميات حسب ما يراه مناسبا ولا يحق للمقاول الاعتراض على ذلك وان الكميات الزائدة والناقصة تسعر حسب سعر المقاول في جدول التعهدات .

لذا فاللجنة الادارية تنذركم بموجب المادة السادسة من الصفحة الثانية من الشروط العامة التي تنص يتبادل الفريقان المتعاقدان عن توجيه الانذارات من احدهما الى الاخر بواسطة كاتب العدل في شؤون هذه المقاولة وكل انذار موجه من احد الفريقين ينبغي اما ان يسلم بعنوان الفريق الاخر او ان يرسل اليه بالبريد المسجل .

ان اللجنة الادارية تنذركم بموجب هذه المادة بالبدء بالعمل في تأريخ اقصاه يوم الثلاثاء الموافق ١٩٥٧/١/٢٢ وفي حالة عدم بداءكم بالتأريخ المذكور فقد تضطر الطائفة بأستعمال حقها حسب المادة ـ ١٨ ـ وهى هى باتمام العمل على حسابكم استنادا الى بنود تلك المادة .

فاذا لم تبدأوا في العمل في التأريخ المذكور فيرجى منكم الحضور يوم الثلاثاء من نفس التأريخ السابق مساء لاجراء الجرد اللازم حسب ما تنص المادة ـ ١٨ ـ وفي حالة عدم حضوركم او حضور من يمثلكم فسوف تضطر الطائفة الى القيام بالجرد اللازم حسب ما تنص عليه البند ج من المادة ـ ١٨ ـ التي تنص :ـ

فاذا لم يحضر المقاول او لم يرسل مندوبا ⟦illegible⟧ عنه فيجرى الجرد بغيابه ويعلمكم بذلك بأن الطائفة سوف تتوقف عن دفع مبلغ لكم الى حين اتمام العمل حسب ما تنص عليه المادة ـ ١٨ ـ والنص هو ( يمكن للطائفة ان تمتنع عن صرف اى مبالغ تكون مستحقة له حتى يتم تسوية هذه النفقات والخسائر ) ان الطائفة تمنعكم من رفع اية مواد او ادوات او اساكل عائدة لكم في حالة عدم بداءكم بالعمل في التأريخ المذكور حسب المادة ـ ١٨ ـ من الشروط العامة .

ان هذا الانذار لا يمنع الطائفة من التمسك بحقها بتغريمكم حسب ما تنص عليه المقاولة (٦) كما ان امرها لكم بالبدء بالعمل لا يعتبر اعترافا بجودة العمل الذى تم .

هذا وتفضلوا بقبول فائق الاحترام

[Signature] رئيس اللجنة الادارية

[Marginalia] صورة منه الى :ـ [Marginalia] ملف المقاول في الطائفة [Marginalia] مدير مدرسة فرنك عيني [Marginalia] مهندس الطائفة

**Traduction anglaise —**

Presidency of the Administrative Committee of the Jewish Community Baghdad ⟦line⟧ Number ⟦illegible⟧ / 1 Date 20 / 1 / 1957 To the Respected Contractor Mr. Sasson Shohet Based on the contract concluded between the Presidency of the Administrative Committee of the Jewish Community in Baghdad and yourselves, you undertook to complete the work within a maximum period of two months. As a result of the increase in construction, which does not exceed 25% in any case, the contract period shall not exceed 75 days, whereas over 100 days have passed since construction began according to the community’s letter dated 3/10/1956 numbered M/56/315, which orders you to work. Since the community has the right to deduct three Dinars daily from your insurance according to Article - 60 - of the general terms sheet, and you have no excuse in any case according to the text of the article which states (and no objection submitted by the contractor for his delay in work will be read), and your dispute with the community's engineer does not justify your procrastination or delay according to the fifth article of the same sheet, which states: The supervising engineer has the right to modify the plans and quantities as he deems appropriate, and the contractor has no right to object to that, and the increased or decreased quantities shall be priced according to the contractor’s price in the undertaking schedule. Therefore, the Administrative Committee warns you according to the sixth article of the second page of the general terms, which states: The two contracting parties exchange warnings from one to the other through the notary public regarding the affairs of this contract, and every warning addressed by one of the parties must either be delivered to the address of the other party or sent to it by registered mail. The Administrative Committee warns you under this article to start work by no later than Tuesday, 22/1/1957. In the event that you do not start on the aforementioned date, the community may be forced to exercise its right according to Article - 18 -, which is to complete the work at your expense based on the provisions of that article. If you do not start work on the aforementioned date, please attend on Tuesday of the same previous date in the evening to perform the necessary inventory according to Article - 18 -. In the event of your absence or the absence of your representative, the community will be forced to perform the necessary inventory according to Clause C of Article - 18 - which states: If the contractor does not attend or does not send a representative ⟦illegible⟧ on his behalf, the inventory shall be conducted in his absence. We inform you that the community will stop paying any amount to you until the completion of the work according to Article - 18 -, and the text is (the community may refrain from paying any amounts due to him until these expenses and losses are settled). The community prohibits you from removing any materials, tools, or scaffolding belonging to you in the event you do not start work on the aforementioned date according to Article - 18 - of the general terms. This warning does not prevent the community from upholding its right to fine you as stipulated in the contract (6), nor does its order to you to start work constitute an admission of the quality of the work completed. Please accept our highest respects. President of the Administrative Committee Copy to: Contractor's file at the community Director of Frank Iny School Community Engineer

---

### csp_d501be2723385f259b50a0ca7cfe772c

[Marginalia] التاريخ ٢٣ تشرين الاول ١٩٣٣

ادارة المجلس الجسماني للطائفة الاسرائيلية بغداد

الرقم ٢٤٢٨ التاريخ ٣١ تشرين الاول ١٩٣٣

تعطيل المدارس حدادا

الى كافة مديريات المدارس

بناء على فاجعتنا بوفاة المأسوف عليه عضو المجلس المرحوم الياهو افندي باروخ يهودا فقد نسب مجلسنا ان يشترك تلامذة المدارس التي كان الفقيد يعمل في خدمتها بواجب الاسى على الفقيد بالصورة التالية . ١- تعطل المدارس بعد ظهر الاربعاء القادم الموافق ١ تشرين الثاني ١٩٣٣ حدادا على الفقيد المرحوم . ٢- بعد انتهاء الدرس الرابع قبل الظهر يجمع المدير كافة التلامذة في ساحة المدرسة ويقوم بتأبين الفقيد المرحوم مبينا ان هذه العطلة هي اظهارا لاسفنا وحزننا بمناسبة هذا المصاب .

[Signature] ⟦signature⟧ [Signature] نائب الرئيس

[Marginalia] ١٦

**Traduction anglaise —**

Date: 23 October 1933 Administration of the Lay Council of the Israelite Community Baghdad Number 2428 Date: 31 October 1933 Closing of schools in mourning To all school directorates Based on our tragedy in the death of the lamented Council member, the late Eliyahu Effendi Baruch Yehuda, our Council has decided that the students of the schools in which the deceased served shall participate in the duty of mourning for the deceased in the following manner: 1- Schools shall be closed next Wednesday afternoon, November 1, 1933, in mourning for the late deceased. 2- After the end of the fourth lesson before noon, the director shall gather all students in the school yard and eulogize the late deceased, explaining that this holiday is a manifestation of our regret and grief on the occasion of this loss. ⟦signature⟧ Vice President 16

---

### csp_d52e1e31c2785323ac7a802cbbfe9c48

⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧

**Traduction anglaise —**

⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧ ⟦illegible⟧

---

### csp_d969543b96b8577b8d7cb33becf744b4

B01 · header / arabic المجلس الجسماني للطائفة الاسرائيلية : بغداد الرقم : ⟦illegible⟧ التاريخ : ٢٥ / ٨ / ٩٣١

B02 · paragraph / arabic تعميم الى مديريات المدارس ( ملحق ) ⟦line⟧

B03 · form / arabic

B04 · paragraph / arabic الحاقاً بتعميمنا رقم ١٠٩٤ بتاريخ ٢٠ / ٨ / ٩٣١ يرجى تقديم تفاصيل المبالغ المدفوعة الى المدرسين وسائر الموظفين من بعد مارت ١٩٣١

B05 · signature / arabic رئيس المجلس الجسماني ⟦signature⟧

B06 · marginalia / arabic اوامر ⟦illegible⟧

B07 · other / arabic ⟦faded text visible through paper from reverse side⟧

**Traduction anglaise —**

The Lay Council of the Israelite Community: Baghdad Number: ⟦illegible⟧ Date: 25 / 8 / 931 Circular to School Directorates (Supplement) ⟦line⟧ Further to our circular No. 1094 dated 20 / 8 / 931 Please provide details of the amounts paid to teachers and other employees since March 1931 President of the Lay Council ⟦signature⟧ Orders ⟦illegible⟧ ⟦faded text visible through paper from reverse side⟧

---

### csp_e32c80fd6d6955b1ba1ffd4034df4f7d

صحيفة ٥

ويكون للطائفة الحق على كل حال في حجز كل او بعض الآلات والادوات والمواد حتى بعد انتهاء العمل وذلك ضمانا لحقوقها ويجب على المقاول ان يدفع للطائفة كل ما تتكبده من النفقات في هذا السبيل زيادة عن قيمة العقد وعليه ان يعوضها عن كل الخسائر التي تتكبدها بسبب ذلك . وللطائفة ان تخصم قيمة النفقات والخسائر المشار اليها من مبلغ التأمينات او من طلبات المقاول او من اى مال يعود له اما اذا كلف العمل باقل من اسعار المقاولة فلا يرجع الفرق الى المقاول . ولهذا الغرض يمكن للطائفة ان تمتنع عن صرف اى مبالغ تكون منحته له حتى يتم تسوية هذه النفقات والخسائر وللطائفة ان تبيع الآلات او الادوات او المواد التي استحضرها المقاول من دون ان تكون مسؤولة عن اى خسائر تلحق به من جراء بيعها .

في حالة سحب العمل من المقاول ينظم كشف جرد عن الاشغال والمباني والادوات والمعدات والمواد التي تكون بموقع العمل وعن العمل الذي تم بحالة مرضية وذلك بمعرفة مهندس الطائفة المسؤول ويحصل هذا الجرد بحضور المقاول الذي يجب انذاره رسميا للحضور هو او مندوبه فاذا لم يحضر المقاول او لم يرسل مندوبا عنه فيجرى الجرد بغيابه .

[Marginalia] ⟦٢٤ / ١٠⟧

ويثبت هذا الجرد بموجب محضر موقع عليه من قبل مهندس الطائفة والمقاول او من ينوب عنه فاذا قام اى خلاف او نزاع بشأن حالة العمل الموجود فيجب اثبات هذا الخلاف او النزاع وطبيعة المحضر المشار اليه .

١٩- تشمل الاسعار الواجب وضعها من قبل المقاول تخطيط ارض البناية حسب الخرائط مع تهيئة سطح الارض <del>وذلك</del> برفع الانقاض ونقلها خارجا ( بالسيارات ان تطلب الامر ) بحيث يتخلص منها نهائيا . ويشمل كذلك تنظيف البناية والموقع بعد اكمال العمل بحيث تكون صالحة للاستعمال مباشرة قبل استلامها استلاما مؤقتا من قبل الطائفة او المهندس المشرف .

٢٠- للطائفة الحق بالقيام باية فقرة على مسؤوليتها الخاصة بتجهيز المواد والعمل او المواد فقط ويقوم المتعهد بالعمل وتكون الاجرة حسب الاتفاق اذا ارتأت الطائفة ضرورة لذلك اما اذا قامت الطائفة بتجهيز المواد والعمل فيكون ذلك على حساب المتعهد .

٢١- اذا استحدثت فقرات جديدة غير مذكورة في المقاولة فيتفق عليها من قبل الطائفة ومهندسها من جهة والمقاول من الجهة الاخرى فاذا لم يتفقا فلهم ان يحكموا من لهم خبرة بذلك على ان الاختلاف على ذلك لا يعطي المتعهد اى حق بتأخير العمل .

[Signature] ⟦illegible⟧

**Traduction anglaise —**

Page 5 The Community shall have the right in any case to seize all or some of the machinery, tools and materials even after the completion of the work, in order to guarantee its rights, and the contractor must pay to the Community all the expenses it incurs in this regard in excess of the contract value, and he must compensate it for all the losses it incurs because of that. The Community may deduct the value of the expenses and losses referred to from the insurance amount or from the contractor's claims or from any money belonging to him, but if the work cost less than the contract prices, the difference shall not return to the contractor. For this purpose, the Community may refrain from paying any amounts that have been granted to him until these expenses and losses are settled, and the Community may sell the machinery, tools or materials that the contractor brought without being responsible for any losses incurred by him as a result of selling them. In the event that the work is withdrawn from the contractor, an inventory report shall be organized regarding the works, buildings, tools, equipment and materials that are at the work site and regarding the work that has been completed in a satisfactory condition, by the Community's responsible engineer, and this inventory shall take place in the presence of the contractor who must be officially notified to attend, either him or his representative. If the contractor does not attend or does not send a representative on his behalf, the inventory shall be carried out in his absence. ⟦24 / 10⟧ This inventory shall be established by a report signed by the Community's engineer and the contractor or his representative. If any dispute or conflict arises regarding the condition of the existing work, this dispute or conflict and its nature must be established in the aforementioned report. 19- The prices to be set by the contractor include planning the building plot according to the maps with preparing the ground surface <del>and that</del> by removing debris and transporting it outside (by cars if required) so that it is disposed of permanently. It also includes cleaning the building and the site after completion of the work so that it is fit for use immediately before its provisional acceptance by the Community or the supervising engineer. 20- The Community has the right to carry out any item on its own responsibility by providing materials and labor or materials only and the contractor carries out the work and the fee shall be as agreed upon if the Community deems it necessary, but if the Community provides the materials and labor, it shall be at the expense of the contractor. 21- If new items are introduced that are not mentioned in the contract, they shall be agreed upon by the Community and its engineer on one hand and the contractor on the other hand. If they do not agree, they may appoint experts in that, provided that the disagreement on that does not give the contractor any right to delay the work. ⟦illegible⟧

---

### csp_e41fc241bd1b5a648fe35457e5aaf630

صحيفة ٢

موقع العمل حسب تقديرها المحلي . على ان لا تعتبر هذه السلفات الممنوحة الى المقاول بمثابة اعتراف بقبول العمل من جانب الطائفة بل تطبق شروط المقاولة على جميع العمل المنجز وغير المنجز الى ان يتم تسليمه نهائيا الى الطائفة .

١٣ – الذرعة النهائية وتسديد حساب المقاول

بعد اكمال العمل تماما من كافة الوجوه بشهادة مهندس الطائفة تقوم الطائفة الاسرائيلية باستلام العمل استلاما موقتا ويسدد حساب المقاول بموجب المبلغ الاجمالي المقطوع المتفق عليه في هذه المقاولة بعد طرح كافة السلف المدفوعة الى المقاول على حساب اعماله اما تأمينات المقاول فتحتفظ بها الطائفة مدة الصيانة وتعاد اليه بانتهائها وبعد الاستلام النهائي للعمل .

١٤ – رفض العمل

بحق للمهندس رفض اي مواد يجهزها المقاول او اي عمل يكون بنظر المهندس قائما على جودة وصنعة غير مستوفيتين للمستوى المطلوب او غير مطابق للمواصفات او الخرائط المختصة بالمقاولة وعلى المقاول ان يرفع المواد والعمل المرفوض ويعيد تنفيذه على نفقته الخاصة بما فيه المواد الموجودة في العمل المرفوض . كل عمل يقام به بدون تفويض بالاضافة الى التفاصيل المعطاة في الخرائط او التعليمات الصادرة سوف لا تعترف به ولا تقوم بذرعته ولا تدفع الى المقاول قيمة المواد المستعملة في تنفيذ مثل هذه الاعمال .

١٥ – مدة الصيانة

على المقاول ان يقوم بصيانة العمل لمدة ثلاثة اشهر من تاريخ استلام الطائفة للعمل منه استلاما موقتا وعليه ان يصلح جميع النواقص او العيوب التي قد تظهر ابان مدة الصيانة على نفقته الخاصة وتعاد اليه التأمينات او ما تبقى منها بعد استقطاع المبالغ المترتبة عليه اصوليا عند نهاية مدة الصيانة وبعد ان يكون المقاول قد وفى التزاماته وتم استلام العمل منه نهائيا . على المقاول ان يقوم بالاصلاحات التي تطلبها منه الطائفة خلال اسبوع من تاريخ تبليغه كتابة وعند تخلفه عن القيام بالعمل تقوم الطائفة بسحب التأمينات العائدة له اذا كانت بشكل كفالة مصرف وتقوم بالعمل على حسابه وتستقطع المبلغ منه .

١٦ – الانذارات

يتنازل الفريقان المتعاقدان عن حق توجيه الانذارات من احدهما الى الاخر بواسطة كاتب العدل في شؤون هذه المقاولة . وكل انذار موجهة من احد الفريقين ينبغي اما ان يسلم بعنوان الفريق الاخر او ان يرسل اليه بالبريد المسجل .

١٧ – قوانين العمال

المقاول مسؤول عن تطبيق قانون العمال فيما يتعلق بكافة شؤون العمال ومراعاتها بشأن اجور العطل الرسمية والاعياد والتعويضات كما وانه مسؤول عن الحوادث التي تقع لمستخدميه في محل العمل وعليه ان يدفع جميع التعويضات المترتبة على ذلك حيث ان الطائفة غير مسؤولة على الاطلاق فيما يتعلق بالعمال .

،، يتبع ،،

**Traduction anglaise —**

Page 2 the work site according to its local estimation. Provided that these advances granted to the contractor are not considered an admission of acceptance of the work by the Community; rather, the terms of the contract apply to all completed and uncompleted work until it is finally handed over to the Community. 13 – Final Measurement and Settlement of the Contractor’s Account After the work is fully completed in all respects as certified by the Community's engineer, the Jewish Community shall take provisional delivery of the work, and the contractor’s account shall be settled according to the agreed-upon lump sum amount in this contract, after deducting all advances paid to the contractor on account of his work. As for the contractor’s security deposits, the Community shall retain them for the maintenance period and return them to him upon its conclusion and after the final handover of the work. 14 – Rejection of Work The engineer has the right to reject any materials supplied by the contractor or any work which, in the engineer's view, is based on quality and workmanship that do not meet the required standard or are not compliant with the relevant specifications or drawings of the contract. The contractor must remove the rejected materials and work and re-execute them at his own expense, including the materials present in the rejected work. Any work carried out without authorization in addition to the details given in the drawings or issued instructions will not be recognized, measured, or paid to the contractor for the value of the materials used in the execution of such works. 15 – Maintenance Period The contractor shall maintain the work for a period of three months from the date the Community takes delivery of the work from him provisionally. He must repair all deficiencies or defects that may appear during the maintenance period at his own expense. The security deposits or what remains of them shall be returned to him after deducting the amounts due from him properly at the end of the maintenance period and after the contractor has fulfilled his obligations and the final handover of work from him has been completed. The contractor must carry out the repairs requested by the Community within one week from the date of written notification. If he fails to perform the work, the Community shall withdraw the security deposits belonging to him if they are in the form of a bank guarantee, and carry out the work at his expense and deduct the amount from him. 16 – Notices The two contracting parties waive the right to direct notices from one to the other through the Notary Public regarding the matters of this contract. Every notice directed from one party should either be delivered to the address of the other party or sent to them by registered mail. 17 – Labor Laws The contractor is responsible for applying the Labor Law regarding all labor matters and observing it concerning wages for official holidays, feasts, and compensation. He is also responsible for accidents that occur to his employees at the work site and must pay all compensation resulting therefrom, as the Community is not responsible at all regarding the laborers. ,, Continued ,,

---

### csp_e5297d65e6e85566a5efbbced4790c4a

B01 · header / arabic سعادة نائب رئيس المجلس الجسماني الاسرائيلي الموقر

B02 · paragraph / arabic تحية واحتراماً : اتقدم لسعادتكم رافعاً شكري العظيم لتفضلكم بالثناء بمناسبة نجاح حفلة تمثيل رواية الهاوية التي تنازل سيادة رئيس طائفتنا العزيز فاتخذها تحت رعايته وقلبي يملؤه السرور لاستحسانكم مقدرتي التي هي بمثابة تشجيع قوي لي للمثابرة على هذه الاعمال التي تدلني منكم لغرض الاهتمام . سعادتكم تعلم ما للالقاء والخطابة من فوائد كثيرة وفن التمثيل شيئ جميل وفائدته عظيمة جداً ودروسه قيمة ايضاً ففي دروسه لا نظير لها لتهذيب الكتب لذاتوه ان جميع بلاد العالم الراقية اتخذت من صالاتها مكاناً فسيحاً لتعليم هذا الفن الجميل الذي من نتائجه المفيدة جمال المنطق وسلاسة الالقاء وحلو المحاضرة ونحن نرى سعادتكم انه يوجد الى ان تفضلتم بابتداء بتدريب تلامذة مدارسنا الراقية مثل - اصيل شموئيل - الوطنية - الاليانس فيشغل من كل منا نحن منتخبوا هذه دروساً في تلك الفنون الجميلة مضحياً بوقت الراحة المتبقي لي من عملي اليومي فأكون بذلك بذلك قد خدمت طائفتي العزيزة التي هي فوق كل شيئ .

B03 · signature / arabic الياس سميرة

B04 · other / arabic ٢٢/١١/٥

B05 · marginalia / arabic ان الفكرة حقاً انها جيدة ، غير اني يظهر لي بأن هذه الفكرة من طلاب المدارس ليس من همهم ذلك الا ان لهم رغبة تعلم هذا الفن ولذلك يمكن للمدرسة التنسيب للوصول الى التمام ⟦illegible⟧

**Traduction anglaise —**

His Excellency the Vice President of the Honorable Israeli Lay Council Greetings and respect: I submit to your Excellency, offering my great thanks for your kindness in praising the occasion of the success of the performance of the play "The Abyss," which the head of our dear community graciously took under his patronage. My heart is filled with joy for your approval of my ability, which serves as a strong encouragement for me to persevere in these works that guide me from you for the purpose of interest. Your Excellency knows the many benefits of recitation and oratory, and the art of acting is a beautiful thing, its benefit is very great, and its lessons are also valuable. In its lessons, there is no equal for refining the ⟦books for themselves⟧. All the civilized countries of the world have taken from their halls a spacious place to teach this beautiful art, whose beneficial results include beauty of logic, smoothness of delivery, and sweetness of lecture. And we see, Your Excellency, that there exists, until you favored us by starting to train the students of our prestigious schools, such as - Asil Shmuel - Al-Wataniya - Alliance. So each of us, the elect of these, would take lessons in those fine arts, sacrificing the rest time remaining for me from my daily work, and I would thereby have served my dear community, which is above all else. Elias Samira 5/11/22 The idea is indeed good, however, it appears to me that this idea from the school students is not their concern, except that they have a desire to learn this art, and therefore it is possible for the school to coordinate to reach completion. ⟦illegible⟧

---

### csp_e788546266fa5796b702d9c7b61442ba

ادارة المجلس الجسماني بغداد

الرقم ٢٤٤٧ التاريخ ٢٣ تشرين الاول ١٩٣٣

الموضوع ـــــــــــــــــ شهادات المعلمين

الى مديريات المدارس كافة

الحاقا بكتابنا رقم ٢٢٦١ بتاريخ ٩٣٣/٨/١٥ ارجو تبليغ كافة معلميكم بوجوب تقديم النسخ الاصلية او نسخا مصدقة رسميا من الشهادات التي يحملونها على ان تقدموها لنا خلال شهر واحد من هذا التاريخ مع لائحة تبين اسماء المعلمين والمدارس التي تخرجوا منها ومدة خدماتهم في المدارس الطائفية وخدماتهم السابقة اذا وجدت والمواضيع التي يقومون بتدريسها

[Signature] ⟦signature⟧ [Signature] نائب الرئيس

[Marginalia] ١٦

**Traduction anglaise —**

Administration of the Communal Council Baghdad Number 2447 Date 23 October 1933 Subject ⟦line⟧ Teachers' Certificates To all school directorates In reference to our letter No. 2261 dated 15/8/933 I request that all your teachers be notified of the necessity of submitting the original copies or officially certified copies of the certificates they hold, provided that you submit them to us within one month from this date, along with a list showing the names of the teachers, the schools they graduated from, their length of service in the sectarian schools, their previous services if any, and the subjects they teach. ⟦signature⟧ Vice President 16

---

### csp_ef6fc779adf2513da3c63c52dbba052c

مناقصة سرية لانشاء صف ومخزن في مدرسة فرنك عيني

استمارة المقاولة

عقدت هذه المقاولة بين رئاسة الطائفة الاسرائيلية ( المعروفة فيما يلي باسم الطائفة ) وبين ⟦يعقوب كوهين⟧ المعروف فيما يلي باسم المقاول الذي اتخذ لغرض هذه المقاولة بوجود محل له في ⟦عمارة⟧ ⟦الدفترجي الطابق الثاني شقة رقم ٨٨⟧ . وبعنوانه هذا يعتبر ما يوجه اليه من كتب مسجلة او ما يسلم اليه باليد من انذارات واوامر وتعليمات توجيها وتسليما صحيحين . المهندس او المهندسين ⟦—⟧ المهندس الذي يقوم بتنفيذ هذه المقاولة نيابة عن الطائفة هو مهندس الطائفة او اي مهندس او مهندسين آخرين تعينهم الطائفة كتابيا بهذه الصفة ويبلغ المقاول باسمائهم لتنفيذ العمل المنصوص عليه في هذه المقاولة . وقد وافق المقاول ايضا بهذا على ان يجهز - بموجب الاحكام والشروط المتضمنة فيها وفي المواصفات وجدول الاسعار والخرائط - المواد الانشائية المنصوص عليها في الشروط العامة وجميع العمال والمكائن والعدد والآلات والادوات والسكلات والحراس وكل ما هو ضروري او يجوز ان يكون ضروريا في الاعمال والخدمات المشمولة بهذه المقاولة وانجازها كاملة على اعلى درجة من الاتقان والصنعة في تنفيذ "انشاء صف ومخزن " في مدرسة فرنك عيني ببغداد .

اعترف المقاول بانه قد زار محل العمل واطلع اطلاعا تاما وبصورة دقيقة ومضبوطة على جميع الخرائط وعلى العمل الذي ينبغي القيام به بموجب هذه المقاولة كما وانه قد اطلع على ساحة العمل وموقع خزن المواد الانشائية والتأسيسات المائية .

يوافق المقاول على القيام بانشاء الصف والمخزن بموجب الخرائط المختصة الصادرة والتي قد يصدرها المهندس المشرف في المستقبل وجدول الاعمال والاسعار والشروط العامة والمواصفات الفنية كاملة من كافة الوجوه وذلك لقاء مبلغ اجمالي مقطوع قدره ⟦١٤٣٦/٩٢٥⟧ دينارا ( كتابة ) ⟦فقط الف واربعمائة وستة وثلاثون دينارا وتسعمائة وخمسة وعشرون فلسا لا غيرها⟧ كما ويتعهد المقاول على اكمال هذا العمل خلال مدة ⟦١٢٠⟧ يوما اعتبارا من ( ٤ ) ايام بعد تاريخ كتاب الطائفة الذي يطلب اليه الشروع في العمل .

التوقيع / رئيس اللجنة الادارية لرئاسة الطائفة الاسرائيلية ببغداد . شاهد —————— التاريخ —————— شاهد —————— التوقيع / ⟦signature⟧ المقاول السيد ⟦يعقوب كوهين⟧ التاريخ ⟦٢٠ / ٩ / ١٩٥٦⟧

[Stamp] دينار [Stamp] دينار

**Traduction anglaise —**

Secret tender for the construction of a classroom and a storehouse in Frank Iny School Contract Form This contract was concluded between the Presidency of the Jewish Community (hereinafter known as the Community) And between ⟦Yaqub Cohen⟧ Known hereinafter as the Contractor, who for the purpose of this contract has taken an office in ⟦Building⟧ ⟦Al-Daftarji, second floor, apartment No. 88⟧. At this address, registered letters sent to him or warnings, orders, and instructions delivered to him by hand are considered valid delivery and notification. The engineer or engineers ⟦—⟧ the engineer who executes this contract on behalf of the Community is the Community's engineer or any other engineer or engineers appointed by the Community in writing in this capacity, and the Contractor shall be notified of their names for the execution of the work stipulated in this contract. The Contractor has also agreed hereby to provide - in accordance with the terms and conditions contained herein and in the specifications, price schedule, and maps - the construction materials stipulated in the general conditions and all workers, machinery, equipment, tools, and instruments, scaffolding, guards, and everything that is necessary or may be necessary for the works and services covered by this contract and to complete them fully with the highest degree of perfection and craftsmanship in the execution of the "construction of a classroom and a storehouse" in Frank Iny School in Baghdad. The Contractor acknowledged that he has visited the work site and has reviewed in full, accurately and precisely, all the maps and the work to be performed under this contract, as he has also reviewed the work site and the location for storing construction materials and water installations. The Contractor agrees to carry out the construction of the classroom and the storehouse according to the relevant issued maps and those which the supervising engineer may issue in the future, the schedule of works and prices, general conditions, and technical specifications in full in all respects, for a total lump sum amount of ⟦1436.925⟧ Dinars (in writing) ⟦Only one thousand four hundred and thirty-six Dinars and nine hundred and twenty-five Fils, nothing else⟧ The Contractor also undertakes to complete this work within a period of ⟦120⟧ days starting from (4) days after the date of the Community's letter requesting him to commence work. Signature / Head of the Administrative Committee of the Presidency of the Jewish Community in Baghdad. Witness ⟦line⟧ Date ⟦line⟧ Witness ⟦line⟧ Signature / ⟦signature⟧ The Contractor, Mr. ⟦Yaqub Cohen⟧ Date ⟦20 / 9 / 1956⟧ Dinar Dinar

---

### csp_f0aae59e8b76578785f6acbeeb39f059

Date: 24.5.57 Design and Supervision By: Saleh Joseph Scale: 1 : 100

[Marginalia] صالح يوسف

up .25 3.85 .25 1.60 7.10 .25 5.65 .25 3.80 .25 3.75 .25 .25

[Marginalia] صالح يوسف

——Front Elevation——

**Traduction anglaise —**

Date: 24.5.57 Design and Supervision By: Saleh Joseph Scale: 1 : 100 Saleh Joseph up .25 3.85 .25 1.60 7.10 .25 5.65 .25 3.80 .25 3.75 .25 .25 Saleh Joseph ⟦line⟧Front Elevation⟦line⟧

---

### csp_f56a350c49d0540eaa6b8951a92d67b3

(ج) ⟦جدول الكميات والاسعار لمدرسة ...⟧

| المبلغ دينار | فلس | السعر دينار | فلس | الكمية والوحدة | التفاصيل | | ٥٦ | ٤٠٠ | | ١٥٠ | ٣٧٦,٠٠ م٢ | الصبغ بالاعملشن J.C.J | ٢٤ | | ١٥ | ٦٥٠ | | ٢٥٠ | ٦٢,٦٠ م٢ | الصبغ بالدهن - البوية | ٢٥ | | ٩١ | ٩٨٨ | ١ | ٣٠٠ | ٧٠,٧٦ م٢ | التبليط بالكاشي الموزاييك | ٢٦ | | ٣٥ | ٣٨٠ | | ٥٠٠ | ٧٠,٧٦ م٢ | كونكريت تحت الكاشي مع مانع الرطوبة | ٢٧ | | ٢٠ | ٨٧٨ | | ٢٠٠ | ١٠٤,٣٩ م٢ | التربيع تحت الكونكريت | ٢٨ | | ٢٧ | ٢٩٠ | | ٧٥٠ | ٣٦,٣٥ م٣ | كونكريت صقول للمماشي | ٢٩ | | ٤٠ | ٣٨٠ | | ٧٥٠ | ٥٣,٨٤ م٢ | كاشي سادة بالسطح | ٣٠ | | ١٤ | ١٠٠ | | ١٥٠ | ٩٤,٠٠ م | الدرز بالسطح | ٣١ | | ٨ | ٥٠٠ | ١ | ... | ٦,٥٠ ط. م | عتبات الشبابيك | ٣٢ | | ٥٨ | ... | ٢ | ... | ٢٩ نقطة | الكهرباء | ٣٣ | | ١٢ | ... | ١ | ٥٠٠ | ٨ عدد | كاونتر ويت Counter Weight | ٣٤ | | ١٧ | ٥٠٠ | | ٢٥٠ | ٧٠ ياردة | خط رئيسي كيبل ٧/٠٤٤ | ٣٥ |

| ٢٢٢١ | ١٨١ | المجموع | | ١١١ | ٠٥٩ | يطرح ٥ ٪ حسب كتاب المتعهد الى سعادة | | | | رئيس اللجنة الادارية | | ٢١١٠ | ١٢٢ | |

فقط الفين ومائة وعشرة دنانير ومائة واثنان وعشرون فلسا .

[Signature] المهندس [Signature] صالح يوسف

**Traduction anglaise —**

(C) ⟦Bill of Quantities and Prices for ... School⟧ Amount Dinar | Fils | Price Dinar | Fils | Quantity and Unit | Details 56 | 400 | | 150 | 376.00 m2 | Painting with emulsion J.C.J | 24 15 | 650 | | 250 | 62.60 m2 | Painting with oil paint - Enamel | 25 91 | 988 | 1 | 300 | 70.76 m2 | Tiling with mosaic tiles | 26 35 | 380 | | 500 | 70.76 m2 | Concrete under the tiles with moisture proofing | 27 20 | 878 | | 200 | 104.39 m2 | Square paving under the concrete | 28 27 | 290 | | 750 | 36.35 m3 | Polished concrete for walkways | 29 40 | 380 | | 750 | 53.84 m2 | Plain tiles for the roof | 30 14 | 100 | | 150 | 94.00 m | Jointing on the roof | 31 8 | 500 | 1 | ... | 6.50 l.m | Window sills | 32 58 | ... | 2 | ... | 29 points | Electricity | 33 12 | ... | 1 | 500 | 8 items | Counter Weight | 34 17 | 500 | | 250 | 70 yards | Main line cable 7/044 | 35 2221 | 181 | Total 111 | 059 | Deduct 5% according to the contractor's letter to His Excellency | | the Chairman of the Administrative Committee 2110 | 122 | Only two thousand one hundred and ten dinars and one hundred and twenty-two fils. The Engineer Saleh Yousef

---

### csp_fbfb5cb78c245185b2b0f4bf14128567

B01 · header / arabic صحيفة ٤

B02 · table / mixed تفاصيل الاعمال | الكمية للوحدة | السعر | المبلغ تابع للفقرة ( ١٥ ) | ٥٩٢,٧٠٥ الحبانية بنسبة ١-٣ وبسمك لا يقل عن ٣/٤" على ان يجرى البياض بالمساطر والشاقول وان تكون اوجه البياض مستوية وصقيلة تماما . وبعد ذلك تصبغ الوجوه بالسيلوسم بثلاثة طبقات وبالالوان التي يختارها المهندس المشرف . ١٦) اعمال الشبابيك والهوائيات الحديدية | ⟦illegible⟧ | ٩,٠٠٠ | ١٢٢,٠٠٠ تكون الشبابيك والهوائيات كما مبينة في الخرائط من انتاج شركة المنتوجات الهندسية العراقية ويجب ان تجهز كافة الشبابيك بيدة مع سلايد . ويجب ان تثبت كافة الشبابيك والهوائيات باطارات من خشب الجام السويدى بمقياس ٢" في ٤" بشيش ٥/٨" وان يثبت فوق كافة الشبابيك من الخارج تيل مانع الذباب كما ويجب تجهيزها بزجاج قياس ٢ مليمتر يثبت بمعجون انكليزى يجهز ببراميل مختومة الى موقع العمل . ١٧) الابواب الحديدية | ⟦illegible⟧ | ٧,٠٠٠ | ٤٠,٨٠٠ تكون الابواب من الحديد الجديد بموجب القياسات والابعاد في الخرائط المختصة على ان تكون الاطارات حديد زاوية ٣" في ٣" في ١/٤" تثبت في الجدران بصورة جيدة والفردات حديد زاوية ٢" في ٢" في ١/٤" وبليت حديد من الخارج سمك ١/٨" على ان تكون الابواب مجهزة باقفال ويدات اجنبية . ملاحظة :- قد تقوم الطائفة بتجهيز هذه الابواب وبالغاء هذه الفقرة والتعويض عنها سعر تركيب الابواب فقط . ١٨- الابواب الخشبية | ⟦illegible⟧ | ٥,٠٠٠ | ٢٢,٠٠٠ تكون الاطارات من الخشب السويدى الجام الجيد الخالي من العقد والشقوق وحسب الابعاد والقياسات في الخرائط المختصة على ان تكون الاطارات ٢" في ٦" والفردات ٢" مكبوسة من الوجهين باجود انواع الخشب المعاكس على ان تكون الابواب مجهزة بيدات واقفال خفية ذات مفتاحين من اجود الانواع الاجنبية الموجودة في الاسواق المحلية . ١٩- التبليط بالكاشي الموزائيك ومونة الاسمنت ١-٣ | ٣٥,٤٠ | ١,٢٠٠ | ٢٥,٥٤٠ تجهيز مواد التبليط للارضيات باحسن انواع الكاشي الموزائيك بحجم ٨" في ٨" ويبند بمونة الاسمنت | ٨٧٤,٢٤٥

B03 · footer / arabic " يتبع "

**Traduction anglaise —**

Page 4 Work Details | Unit Quantity | Price | Amount Continuation of paragraph (15) | | | 592,705 Habbaniyah at a ratio of 1-3 and a thickness of no less than 3/4", provided that the plastering is carried out using rulers and plumb lines, and that the plaster surfaces are completely level and smooth. After that, the surfaces are painted with Celosom in three coats and in colors chosen by the supervising engineer. | | | 16) Iron windows and vents work | ⟦illegible⟧ | 9,000 | 122,000 The windows and vents shall be as shown in the drawings, produced by the Iraqi Engineering Products Company, and all windows must be equipped with a handle and a slide. All windows and vents must be fixed with frames of Swedish pine wood measuring 2" by 4" with 5/8" bars, and fly-proof mesh must be fixed over all windows from the outside. They must also be provided with 2 mm glass fixed with English putty supplied in sealed barrels to the work site. | | | 17) Iron doors | ⟦illegible⟧ | 7,000 | 40,800 The doors shall be made of new iron according to the measurements and dimensions in the relevant drawings, provided that the frames are 3" x 3" x 1/4" angle iron fixed well in the walls, and the leaves are 2" x 2" x 1/4" angle iron with 1/8" thick iron plate from the outside, provided that the doors are equipped with foreign locks and handles. | | | Note: - | | | The community may supply these doors, in which case this paragraph will be cancelled and compensated by the price of installing the doors only. | | | 18- Wooden doors | ⟦illegible⟧ | 5,000 | 22,000 The frames shall be made of good Swedish pine wood free of knots and cracks and according to the dimensions and measurements in the relevant drawings, provided that the frames are 2" x 6" and the leaves are 2" pressed on both sides with the best types of plywood, provided that the doors are equipped with handles and hidden locks with two keys of the best foreign types available in the local markets. | | | 19- Tiling with mosaic tiles and 1-3 cement mortar | 35.40 | 1,200 | 25,540 Supplying tiling materials for floors with the best types of mosaic tiles in size 8" by 8" and bonded with cement mortar | | | 874,245 "To be continued"

---

### csp_fdecb0409d5f533b947b7f1b5d565275

صحيفة ٦

جدول الاعمال والاسعار

لمقاولة انشاء على الارض المرقمة محلة

| الفقرة | تفاصيــــــــــــــل الاعمــــــــــــــال | الكمية والوحدة | السعر | المبلغ | | ١ | الحفريات الترابية للاسس تكون الحفريات حسب ما جاء في الخرائط وتكون شاقولية والحافات والجوانب مستقيمة وقعر الحفر مستويا وموزونا . وترفع الاتربة الناتجة من الحفر خارج ساحة البناء واذا تجاوز المقاول الاعمال المؤشرة بالمخطط دون موافقة المهندس - التحريرية - فعليه ردم الحفريات الزائدة بالخرسانة ١:٣:٦ على حسابه الخاص . | ٣٠٠ م٣ | -/١٧٠ | ٥١٠٠٠ | | ٢ | اعمال الرصف بالطابوق الكسر يكون طابوق الكسر من نوع المصخرج الصلب وبسمك ١٢ سم. ويشمل السعر عملية الدق بالمدقات الحديدية بصورة جيدة والرش بالماء والتشربت بمونة الاسمنت بنسبة ١ - ٥ . | ٣٠٠ م٢ | -/٢٤٠ | ٧٢٠٠٠ | | ٣ | اعمال الخرسانة <del>غير المسلحة</del> للاسس تكون نسبة الخرسانة ١:٣:٦ من السمنت ورمل الحبانية والحصى النهرى المغسول المدرج الحجم ١/٢ ( انج فما دون ويجب ان يكون الرمل من مصادر بحيرة الحبانية ولا يجوز استعمال النهرى اطلاقا في اى غرض من اغراض البناء الا بموافقة المهندس . | ٣٠٠ م٣ | -/٢٢٠ | ٦٨١٠٠ | | ٤ | البناء بالطابوق والسمنت يكون الطابوق من النوع المصخرج ويجرى البناء بمونة الاسمنت ورمل الحبانية بنسبة ١:٤ ولا يجوز استعمال طابوق المكسر او المستعمل | ٣٥٠ م٢ | ٤١٥٠ | ١١٢٧٥٠٠ |

[Signature] ⟦signature⟧

[Marginalia] ١٢٨٦٨٠٠

**Traduction anglaise —**

Page 6 Schedule of Works and Prices For the construction contract on the land numbered in the neighborhood Item | Details of Works | Quantity and Unit | Price | Amount 1 | Earth excavations for foundations Excavations shall be as per the drawings and shall be vertical with straight edges and sides, and the bottom of the excavation level and balanced. Resulting soil from excavation shall be removed outside the building site. If the contractor exceeds the works indicated in the plan without the engineer's written approval, he must backfill the excess excavations with 1:3:6 concrete at his own expense. | 300 m3 | 170/- | 51000 2 | Paving works with broken bricks The broken bricks shall be of the solid fired type and with a thickness of 12 cm. The price includes the process of hammering with iron tampers properly, spraying with water, and grouting with cement mortar in a ratio of 1 - 5. | 300 m2 | 240/- | 72000 3 | Concrete works <del>unreinforced</del> for foundations The concrete ratio shall be 1:3:6 of cement, Habbaniya sand, and washed river gravel graded in size 1/2 (inch and below, and the sand must be from Lake Habbaniya sources and it is not allowed to use river sand at all for any purpose of construction except with the approval of the engineer. | 300 m3 | 220/- | 68100 4 | Brickwork and cement The bricks shall be of the fired type and construction shall be done with cement mortar and Habbaniya sand in a ratio of 1:4 and it is not allowed to use broken or used bricks | 350 m2 | 4150 | 1127500 ⟦signature⟧ 1286800